Wabash River Dikes

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912QR21B0012
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation is for the installation of seven stone river dikes in the Ohio River between river miles 847.5 and 849.0. The U.S. Army Corps of Engineers Louisville District seeks to award a firm-fixed-price contract requiring the installation of four stone dikes on the Illinois riverbank and three on the Kentucky riverbank, as well as stone bank armoring work. Bidders must be prepared to provide approximately 125,000 tons of stone and perform some tree clearing and excavation of the river bottom on the Illinois side. All work must be performed from the river. Sealed bids are due by September 16, 2021 and the award will be made based on lowest price technically acceptable.

There is no set-aside designated for this procurement. The project is covered under NAICS 237990 with a size standard of $39.5 million. All work will be performed in the United States along the Ohio River between river miles 847.5 and 849.0. Bidders should expect the project to require approximately 125,000 tons of stone to construct the seven river dikes and perform the associated bank armoring work. The purpose is to improve navigation on the Wabash River.

Notice text

4 versions

Update #4 · Latest ·

Installation of seven stone river dikes in the Ohio River withing river miles 847.5 to 849.0. Four to be installed on the Illinois bank and three installed on the Kentucky bank. Installation of stone bank armoring. Some tree clearing and excavation of the river bottom on the Illinois side will be required. Tree clearing and All work will be performed from the river. Project will require approximately 125,000 tons of stone.

******************************Amendment 0001**************************

Solicitation W912QR21B0012 to install 7 stone river dikes along the Ohio River is hereby modified as follows:

a. Photos of the site are hereby incorporated in this solicitation.

b. The due date of bids is not extended due to this amendment.

c. All amendments must be acknowledged.

d. All other terms and conditions remain unchanged.

***************************Amendment 0001**************************

***************************Amendment 0002**************************

Solicitation W912QR21B0012 to install 7 stone river dikes along the Ohio River is hereby modified as follows:

a. The following sections have been updated in the Specifications:

          1. Revised specification section 31 00 00.00 06 Earthwork paragraph 3.7.

          2. Revised specification section 31 11 00 Clearing and Grubbing paragraph 3.3.

          3. Revised Plan sheet CS101 – added note 7.

b. The due date of bids is not extended due to this amendment.

c. All amendments must be acknowledged.

d. All other terms and conditions remain unchanged.

***************************Amendment 0002**************************

**************************Amendment 0003**************************

Solicitation W912QR21B0012 to install 7 stone river dikes along the Ohio River is hereby modified as follows:

a. The following sections have been updated in the Specifications:

          1. Revised specification section 31 00 00.00 06 Earthwork paragraph 3.8.3.

          2. Revised specification section 01 50 00 – Par. 1.5.

          3. Revised specification section 01 57 19.00 06 – Par. 4.2.4.1

          4. Revised Plan sheet CS104 – added note 11.

b. The due date of bids is not extended due to this amendment.

c. All amendments must be acknowledged.

d. All other terms and conditions remain unchanged.

**************************Amendment 0003**************************

Update #3 ·

Installation of seven stone river dikes in the Ohio River withing river miles 847.5 to 849.0. Four to be installed on the Illinois bank and three installed on the Kentucky bank. Installation of stone bank armoring. Some tree clearing and excavation of the river bottom on the Illinois side will be required. Tree clearing and All work will be performed from the river. Project will require approximately 125,000 tons of stone.

******************************Amendment 0001**************************

Solicitation W912QR21B0012 to install 7 stone river dikes along the Ohio River is hereby modified as follows:

a. Photos of the site are hereby incorporated in this solicitation.

b. The due date of bids is not extended due to this amendment.

c. All amendments must be acknowledged.

d. All other terms and conditions remain unchanged.

***************************Amendment 0001**************************

***************************Amendment 0002**************************

Solicitation W912QR21B0012 to install 7 stone river dikes along the Ohio River is hereby modified as follows:

a. The following sections have been updated in the Specifications:

          1. Revised specification section 31 00 00.00 06 Earthwork paragraph 3.7.

          2. Revised specification section 31 11 00 Clearing and Grubbing paragraph 3.3.

          3. Revised Plan sheet CS101 – added note 7.

b. The due date of bids is not extended due to this amendment.

c. All amendments must be acknowledged.

d. All other terms and conditions remain unchanged.

***************************Amendment 0002**************************

Update #2 ·

Installation of seven stone river dikes in the Ohio River withing river miles 847.5 to 849.0. Four to be installed on the Illinois bank and three installed on the Kentucky bank. Installation of stone bank armoring. Some tree clearing and excavation of the river bottom on the Illinois side will be required. Tree clearing and All work will be performed from the river. Project will require approximately 125,000 tons of stone.

******************************Amendment 0001**************************

Solicitation W912QR21B0012 to install 7 stone river dikes along the Ohio River is hereby modified as follows:

a. Photos of the site are hereby incorporated in this solicitation.

b. The due date of bids is not extended due to this amendment.

c. All amendments must be acknowledged.

d. All other terms and conditions remain unchanged.

***************************Amendment 0001**************************

Update #1 ·

Installation of seven stone river dikes in the Ohio River withing river miles 847.5 to 849.0. Four to be installed on the Illinois bank and three installed on the Kentucky bank. Installation of stone bank armoring. Some tree clearing and excavation of the river bottom on the Illinois side will be required. Tree clearing and All work will be performed from the river. Project will require approximately 125,000 tons of stone.

Files

File Type Posted
W912QR21B0012_Plans-0003.pdf PDF
W912QR21B0012_Specs-0003.pdf PDF
W912QR21B0012-0002.pdf PDF
W912QR21B0012_Photos-0001.pdf PDF
W912QR21B0012_Plans-0000.pdf PDF
W912QR21B0012_Specs-0000.pdf PDF

Notice history

Notice Type Posted
Wabash River Dikes Award Award Notice
This notice Latest solicitation Solicitation
Wabash River Dikes Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Sources Sought/Request for Information Upper Mississippi River Restoration (UMRR) – Quincy Bay Habitat Rehabilitation and Enhancement Project- Stage 1 Quincy, Illinois 62301, United States · NAICS 237990 ENDIST Rock Island No set-aside
Lock and DAM 25 new 1, 200 FT lock navigation and ecosystem sustainability program (nesp) Lock and Dam 25 Site, 10 Sandy Slough Road, Winfield, Missouri 63389 63389 · NAICS 237990 ENDIST St Louis No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity