This solicitation package is for a construction project to install seven stone river dikes in the Ohio River along river miles 847.5 to 849.0. The project requires installation of four stone dikes on the Illinois riverbank and three dikes on the Kentucky riverbank, as well as stone bank armoring work. Some tree clearing and excavation of the river bottom on the Illinois side will also be performed. All work will take place from the river. The project will utilize approximately 125,000 tons of stone. The soliciting agency is the Department of the Army Corps of Engineers Louisville District. The response due date is not specified in the document.

View the file

Other files

File Type Posted
W912QR21B0012_Plans-0003.pdf PDF
W912QR21B0012_Specs-0003.pdf PDF
W912QR21B0012_Photos-0001.pdf PDF
W912QR21B0012_Specs-0000.pdf PDF
W912QR21B0012_Plans-0000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL/OPS/ENVIRONMENTAL BR

ATTN: KARI SMITH

600 DR M L KING JR PL RM 821

LOUISVILLE KY 40202-2230

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR21B0012 to install 7 stone river dikes along the Ohio River is hereby modified as follows:

a. The following sections have been updated in the Specifications:

1. Revised specification section 31 00 00.00 06 Earthwork paragraph 3.7.

2. Revised specification section 31 11 00 Clearing and Grubbing paragraph 3.3.

3. Revised Plan sheet CS101 – added note 7.

b. The due date of bids is not extended due to this amendment.

c. All amendments must be acknowledged.

d. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21B0012

X 9B. DATED (SEE ITEM 11)

17-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Sep-2021

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE 964960

FACILITY CODECODE

EMAIL:TEL:

X 1

W912QR21B0012-0002

Ohio River Dikes at Wabash Confluence 128980DIKE485870

SECTION 31 00 00.00 06

EARTHWORK

07/18

Amendment 0002

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop

AASHTO T 224 (2010) Standard Method of Test for Correction for Coarse Particles in the Soil Compaction Test

ASTM INTERNATIONAL (ASTM)

ASTM C136/C136M (2014) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

ASTM D1140 (2017) Standard Test Methods for Determining the Amount of Material Finer than 75-µm (No. 200) Sieve in Soils by Washing

ASTM D1557 (2012; E 2015) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

ASTM D2487 (2011) Soils for Engineering Purposes (Unified Soil Classification System)

ASTM D422 (1963; R 2007; E 2014; E 2014)

Particle-Size Analysis of Soils

ASTM D4318 (2017) Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils

1.2 MEASUREMENT

1.2.1 Excavation

The unit of measurement for excavation will be the cubic yard, computed by the average end area method from cross sections taken before and after the excavation operations, including the excavation for ditches, gutters, and

SECTION 31 00 00.00 06 Page 1 channel changes, when the material is acceptably utilized or disposed of as herein specified. The measurements will include authorized excavation of rock , authorized excavation of unsatisfactory subgrade soil, and the volume of loose, scattered rocks and boulders collected within the limits of the work; allowance will be made on the same basis for selected backfill ordered as replacement. The measurement will not include the volume of subgrade material or other material that is scarified or plowed and reused in-place, and will not include the volume excavated without authorization or the volume of any material used for purposes other than directed. The measurement will not include the volume of any excavation performed prior to the taking of elevations and measurements of the undisturbed grade.

1.2.2 Topsoil Requirements

Separate excavation, hauling, and spreading or piling of topsoil and related miscellaneous operations will be considered subsidiary obligations of the Contractor, covered under the contract unit price for excavation.

1.3 PAYMENT

Payment will constitute full compensation for all labor, equipment, tools, supplies, and incidentals necessary to complete the work.

1.3.1 Unclassified Excavation

All excavation shall be considered unclassified. Unclassified excavation will be paid for at the contract unit price per cubic yard for excavation as indicated in the Bid Schedule.

1.4 DEFINITIONS

1.4.1 Satisfactory Materials

Satisfactory materials shall comprise any materials classified by ASTM D2487 as GW, GP, GM, GP-GM, GW-GM, , GP-GC, GM-GC, SW, SP, SM, SW-SM, SC, SW-SC, SP-SM, SP-SC, CL. .

1.4.2 Unsatisfactory Materials

Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include man-made fills; trash; refuse; backfills from previous construction; and material classified as satisfactory which contains root and other organic matter or frozen material. The Contracting Officer shall be notified of any contaminated materials.

1.4.3 Cohesionless and Cohesive Materials

Cohesionless materials include materials classified in ASTM D2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM and SM will be identified as cohesionless only when the fines are nonplastic. Testing required for classifying materials shall be in accordance with ASTM D4318, ASTM C136/C136M, ASTM D422, and ASTM D1140.

1.4.4 Degree of Compaction

Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum density obtained by the test

SECTION 31 00 00.00 06 Page 2 procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum density. Since ASTM D1557 applies only to soils that have 30 percent or less by weight of their particles retained on the 3/4-inch sieve, the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4-inch sieve shall be expressed as a percentage of the maximum density in accordance with AASHTO T 180 Method D and corrected with AASHTO T 224. To maintain the same percentage of coarse material, the "remove and replace" procedure as described in the NOTE 8 in Paragraph 7.2 of AASHTO T 180 shall be used.

1.4.5 Topsoil

Material suitable for topsoils obtained from excavations is defined as:

Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, rocks larger than one-inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7.

1.4.6 Hard/Unyielding Materials

Weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock". These materials usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal.

1.4.7 Rock

Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling and blasting, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; also large boulders, buried masonry, or concrete other than pavement exceeding 1/2-cubic yard in volume. Removal of hard material will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production.

1.4.8 Unstable Material

Unstable material shall consist of materials too wet to properly support the planed construction.

1.4.9 Expansive Soils

Expansive soils are defined as soils that have a plasticity index equal to or greater than 35 when tested in accordance with ASTM D4318.

1.4.10 Nonfrost Susceptible (NFS) Material

Nonfrost susceptible material shall be a uniformly graded washed sand with a maximum particle size of 1/2 inch and less than 5 percent passing the No.

200 size sieve, and with not more than 3 percent by weight finer than 0.02 mm grain size.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office

SECTION 31 00 00.00 06 Page 3 that will review the submittal for the Government. The following shall be submitted in accordance with LRL Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Utilization of Excavated Materials

SD-06 Test Reports

Testing

SD-07 Certificates

Testing Qualifications of the Corps' validated commercial testing laboratory or the Contractor's validated testing facilities.

Geotechnical Engineer Qualifications of the Contractor's Geotechnical Engineer.

1.6 SUBSURFACE DATA

Subsurface soil boring logs are shown on the drawings. These data represent the best subsurface information available; however, variations may exist in the subsurface between boring locations.

1.7 CLASSIFICATION OF EXCAVATION

No consideration will be given to the nature of the materials, and all excavation will be designated as unclassified excavation.

1.8 CRITERIA FOR BIDDING

Base bids on the following criteria:

a. Surface elevations are as indicated.

b. Pipes or other artificial obstructions, except those indicated, will not be encountered.

c. Ground water elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction.

e. Material character is indicated by the boring logs.

f. Hard materials and rock will not be encountered in the excavations.

1.9 DEWATERING WORK PLAN

Submit procedures for accomplishing dewatering work.

PART 2 PRODUCTS

2.1 REQUIREMENTS FOR BORROW AND EXCESS SOIL

Borrow soils shall meet the requirement of LRL Section 01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS; paragraphs BORROW SOILS and

SECTION 31 00 00.00 06 Page 4

MANAGEMENT OF BORROW MATERIAL AND EXCESS SOIL.

PART 3 EXECUTION

3.1 STRIPPING OF TOPSOIL

Where indicated or directed, topsoil shall be stripped to a depth of 4 inches. The upper 4 inches of each dike above the river normal pool elevation 324 feet NGVD 88 is considered topsoil for this project. Topsoil shall be spread on areas already graded and prepared for topsoil, or transported and deposited in stockpiles convenient to areas that are to receive application of the topsoil later, or at locations indicated or specified. Any surplus of topsoil from excavations and grading shall be spread on the site within the contractor work limits indicated in the drawings.

3.2 GENERAL EXCAVATION

The Contractor shall perform excavation of every type of material encountered within the limits of the project to the lines, grades, and elevations indicated and as specified. Grading shall be in conformity with the typical sections shown and the tolerances specified in paragraph FINISHING. Satisfactory excavated materials shall be transported to and placed in fill or embankment within the limits of the work. Unsatisfactory materials encountered within the limits of the work shall be excavated below grade and replaced with satisfactory materials as directed. Such excavated material and the satisfactory material ordered as replacement shall be included in excavation. Surplus satisfactory excavated material not required for fill or embankment shall be disposed of in areas approved for surplus material storage or designated waste areas. Unsatisfactory excavated material shall be disposed of in designated waste or spoil areas. During construction, excavation and fill shall be performed in a manner and sequence that will provide proper drainage at all times. At the end of excavation, the contractor shall survey above and below the water line to verify construction matches plans and specifications.

3.2.1 Drainage

Provide for the collection and disposal of surface and subsurface water encountered during construction. Completely drain construction site during periods of construction to keep soil materials sufficiently dry. The Contractor shall establish/construct storm drainage features (ponds/basins) at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and/or provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed.

3.2.2 Dewatering

Groundwater flowing toward or into excavations shall be controlled to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. Control measures shall be taken by the time the excavation

SECTION 31 00 00.00 06 Page 5 reaches the water level in order to maintain the integrity of the in situ material.

3.2.3 Underground Utilities

Utilites are not expected to be encountered.

3.3 OPENING AND DRAINAGE OF EXCAVATION

The Contractor shall notify the Contracting Officer sufficiently in advance of the opening of any excavation to permit elevations and measurements of the undisturbed ground surface to be taken. Except as otherwise permitted, borrow pits and other excavation areas shall be excavated providing adequate drainage. Overburden and other spoil material shall be transported to designated spoil areas or otherwise disposed of as directed. Borrow pits shall be neatly trimmed and drained after the excavation is completed. The Contractor shall ensure that excavation of any area, operation of borrow pits, or dumping of spoil material results in minimum detrimental effects on natural environmental conditions.

3.4 GEOTECHNICAL ENGINEER

The Contractor is required to hire a Professional Geotechnical Engineer to provide inspection of earthwork, and soil/groundwater conditions throughout construction. The Geotechnical Engineer shall provide recommendations to the Contractor for soil related matters on the project. The Geotechnical Engineer shall be responsible for performing pre-construction and periodic site visits throughout construction to assess site conditions. The Geotechnical Engineer shall update the excavation, sheeting and dewatering plans as construction progresses to reflect changing conditions and shall submit an updated plan if necessary. A written report shall be submitted, at least monthly, informing the Contractor and Contracting Officer of the status of the plan and an accounting of the Contractor's adherence to the plan addressing any present or potential problems. The Geotechnical Engineer shall be available to meet with the Contracting Officer at any time throughout the contract duration.

3.5 GROUND SURFACE PREPARATION

3.5.1 General Requirements

Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with satisfactory materials as directed by the Contracting Officer. The surface shall be scarified to a depth of 6 inches before the fill is started. Sloped surfaces steeper than 1 vertical to 4 horizontal shall be plowed, stepped, benched, or broken up so that the fill material will bond with the existing material. When subgrades are less than the specified density, the ground surface shall be broken up to a minimum depth of 6 inches, pulverized, and compacted to the specified density. When the subgrade is part fill and part excavation or natural ground, the excavated or natural ground portion shall be scarified to a depth of 12 inches and compacted as specified for the adjacent fill.

3.5.2 Frozen Material

Material shall not be placed on surfaces that are muddy, frozen, or contain frost. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, or other approved equipment well suited to the soil being compacted. Material shall be moistened or

SECTION 31 00 00.00 06 Page 6 aerated as necessary to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used.

Minimum subgrade density shall be as specified in paragraph TESTING.

3.6 UTILIZATION OF EXCAVATED MATERIALS

Unsatisfactory materials removed from excavations shall be disposed of in designated waste disposal or spoil areas. Satisfactory material removed from excavations shall be used, insofar as practicable, in the construction of fills, embankments, subgrades, shoulders, bedding (as backfill), and for similar purposes. No satisfactory excavated material shall be wasted without specific written authorization. Satisfactory material authorized to be wasted shall be disposed of in designated areas approved for surplus material storage or designated waste areas as directed. Newly designated waste areas on Government-controlled land shall be cleared and grubbed before disposal of waste material thereon. Coarse rock from excavations shall be stockpiled and used for constructing slopes or embankments adjacent to streams, or sides and bottoms of channels and for protecting against erosion. No excavated material shall be disposed of to obstruct the flow of any stream, endanger a partly finished structure, impair the efficiency or appearance of any structure, or be detrimental to the completed work in any way.

3.7 BACKFILLING AND COMPACTION

*** AMENDMENT 0002 *********************************************************

Ground surface on which backfill is to be placed shall be prepared as specified in paragraph PREPARATION OF GROUND SURFACE FOR EMBANKMENTS.

Compaction requirements for backfill materials shall also conform to the applicable portions of paragraphs LRL Section 31 00 00.00 06 EARTHWORK.

Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.Compaction of spoil material spread atop the bank within the project boundaries in thin layers will not require compaction, however, filling of depressions or placement in layers thicker than 6 inch depth will require compaction.

******************************************************* AMENDMENT 0002 ***

3.8 EMBANKMENTS AND STRUCTURAL FILL

3.8.1 Earth Embankments

Earth embankments or cut benches shall be constructed from satisfactory materials free of organic or frozen material and rocks with any dimension greater than 3 inches. The material shall be placed in successive horizontal layers of loose material not more than 6 inches in depth. Each layer shall be spread uniformly on a soil surface that has been moistened or aerated as necessary, and scarified or otherwise broken up so that the fill will bond with the surface on which it is placed. After spreading, each layer shall be plowed, disked, or otherwise broken up; moistened or aerated as necessary; thoroughly mixed; and compacted to at least 90 percent laboratory maximum density for cohesive materials or 95 percent laboratory maximum density for cohesionless materials. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.

SECTION 31 00 00.00 06 Page 7

3.8.2 Rock Embankments

Refer to Section 35 42 37.00 06 for details with rock embankments.

3.8.3 Structural Fill

All structural fill placed to facilitate desired site grades shall be constructed from satisfactory material free of organic or frozen material and rocks with any dimension greater than 3 inches. The fill shall be placed in maximum 8 inch loose lifts and compacted to the following criteria. Beneath dikes: at least 95 percent laboratory maximum density as determined by the project geotechnical engineer .

3.9 SUBGRADE PREPARATION

3.9.1 Construction

Subgrade shall be shaped to line, grade, and cross section, and compacted as specified. This operation shall include plowing, disking, and any moistening or aerating required to obtain specified compaction. Soft or otherwise unsatisfactory material shall be removed and replaced with satisfactory excavated material or other approved material as directed.

Rock encountered in the cut section shall be excavated to a depth of 6 inches below finished grade for the subgrade. Low areas resulting from removal of unsatisfactory material or excavation of rock shall be brought up to required grade with satisfactory materials, and the entire subgrade shall be shaped to line, grade, and cross section and compacted as specified. The elevation of the finish subgrade shall not vary more than 0.05-foot from the established grade and cross section.

3.10 FINISHING3.10.1 Subgrade and Embankments

During construction, embankments and excavations shall be kept shaped and drained. Ditches and drains along subgrade shall be maintained to drain effectively at all times. The finished subgrade shall not be disturbed by traffic or other operation and shall be protected and maintained by the Contractor in a satisfactory condition . The storage or stockpiling of materials on the finished subgrade will not be permitted.

3.11 DISPOSITION OF SURPLUS MATERIAL

Surplus material or other soil material not required or suitable for filling or backfilling, and brush, refuse, stumps, roots, and timber shall be spread on the site within the Contractor Work Limits.

-- End of Section --

SECTION 31 00 00.00 06 Page 8

SECTION 31 11 00

CLEARING AND GRUBBING

11/18

Amendment 0002

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" classification.

Submittals not having a "G" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Tree Wound Paint

1.2 DELIVERY, STORAGE, AND HANDLING

Deliver materials to the site, and handle in a manner which will maintain the materials in their original manufactured or fabricated condition until ready for use.

1.3 Payment

Clearing and Grubbing will be paid for at the contract lump sum price of Job as indicated in the Bid Schedule.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Tree Wound Paint

Use bituminous based paint from standard manufacture specially formulated for tree wounds.

PART 3 EXECUTION

3.1 PREPARATION

3.1.1 Protection

3.1.1.1 Trees, Shrubs, and Existing Facilities

Protect trees and vegetation to be left standing from damage incident to clearing, grubbing, and construction operations by the erection of barriers or by such other means as the circumstances require.

SECTION 31 11 00 Page 1

3.2 CLEARING

Clearing consists of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Clearing also includes the removal and disposal of structures that obtrude, encroach upon, or otherwise obstruct the work. Cut off flush with or below the original ground surface trees, stumps, roots, brush, and other vegetation in areas to be cleared, except such trees and vegetation as may be indicated or directed to be left standing. Trim dead branches 1-1/2 inches or more in diameter on trees designated to be left standing within the cleared areas and trim all branches to the heights indicated or directed. Neatly cut close to the bole of the tree or main branches, limbs and branches to be trimmed. Paint, with an approved tree-wound paint, cuts more than 1-1/2 inches in diameter.

3.2.1 Tree Removal

Where indicated or directed, trees and stumps that are designated as trees shall be removed from areas outside those areas designated for clearing and grubbing. This work includes the felling of such trees and the removal of their stumps and roots as specified in paragraph GRUBBING. Dispose of trees as specified in paragraph DISPOSAL OF MATERIALS.

3.2.2 Grubbing

Grubbing consists of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas.

Remove material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, to a depth of not less than 18 inches below the original surface level of the ground in areas indicated to be grubbed and in areas indicated as construction areas under this contract, such as areas for buildings, and areas to be paved. Fill depressions made by grubbing with suitable material and compact to make the surface conform with the original adjacent surface of the ground.

3.2.3 Protection of Endangered Species

The removal of trees (felling of trees) greater than 5" dbh must not occur between 1 April and 30 September to ensure protection of several enangered species known to inhabit the area.

3.3 DISPOSAL OF MATERIALS

***AMENDMENT 0002 ********************************************************

Dispose of excess materials in accordance with the approved solid waste management permit and include those materials in the solid waste management report. Burning is permitted in accordance with Section 01 57 19.00 06.

Trees and debris from the clearing and grubbing operation are not to be left on site. Tossing of clearing debris and excess materials into the river is not permitted. Fellen trees along the bank within the project limits are also to be disposed of by the Contractor.

******************************************************* AMENDMENT 0002 ***

SECTION 31 11 00 Page 2

All wood or wood like materials, except for salable timber, remaining from clearing, prunning or grubbing such as limbs, tree tops, roots, stumps, logs, rotten wood, and other similiar materials shall become the property of the Contractor and disposed of as specified. All non-saleable timber and wood or wood like materials remaining from timber harvesting such as limbs, tree tops, roots, stumps, logs, rotten wood, and other similiar materials shall become the property of the Contractor and disposed as specified.

3.3.1 Saleable Timber

All timber removed from the project site shall become the property of the Contractor.

-- End of Section --

SECTION 31 11 00 Page 3

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 31 11 00 Page 4 ft.

350 ft.

350 ft.

350 ft.

ft.

315 ft.

ft.

ft.

350 ft.

f t.

350 ft.

f t.

310 ft.

310 ft ft.

f t.

310 ft.

ft.

315 ft.

ft.

ft.

f t.

345 ft.

f t.

f t.

f t.

ft.

320 ft.

ft.

345 ft.

f t.

f t.

f t.

ft.

f t.

310 ft.

ft.

ft.

f t.

f t.

ft.

f t.

f t.

f t.

f t.

300 ft.

ft.

ft.

f t.

ft.

ft.

ft.

f t.

ft.

f t.

0 f t.

300 ft.

300 ft.

ft.300 ft.

ft.

300 ft.

ft.

ft.

300 ft.

f t.

305 ft.

ft.

305 ft.

ft.

305 ft.

ft.

305 ft.

305 ft.

ft.

f t.

ft.

f t.

f t.

f t.

ft.

305 ft.

ft.

f t.

ft.

ft.

5 f t.

305 ft.

5 f t.

305 ft.

ft.

ft.

305 ft.

ft.

ft.

f t.

ft.

305 ft.

f t.

ft.

5 f t.

f t.

ft.

ft.

f t.

ft.

ft.3 ft.

310 ft.

f t.

310 ft.

ft.

310 ft.

310 ft.

ft.

310 ft.

310 ft.

310 ft.

f t.

310 ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

310 ft.

ft.

ft.

310 ft.

ft.

0 f t.

f t.

f t.

f t.

f t.

f t.

f t.

ft.

0 f t.

f t.

f t.

f t.

f t.

f t.

ft.

f t.

ft.

315 ft.

ft.

315 ft.

315 ft.315 ft.

ft.

315 ft.

315 ft.

315 ft.

315 ft.

ft.

315 ft.

315 ft.

315 ft.

315 ft.

f t.

ft.

ft.

315 ft.

5 f t.

ft.

ft.

f t.

ft.

315 ft.

315 ft.

ft.

ft.

ft.

ft.

315 ft.

ft.

ft.

ft.

ft.

315 ft.

f t.

315 ft.

f t.

ft.

f t.

ft.

ft.

ft.

ft.

ft.

f t.

f t.

ft.

f t.

f t.

f t.

ft.

f t.

f t.

f t.

f t.

ft.

ft.

f t.

ft.

f t.

ft.

ft.

ft.

315 ft.

315 ft.

ft.

ft.

ft.

ft.

ft.

f t.

ft.

f t.

315 ft.

f t.

f t.

f t.

f t.

f t.

f t.

f t.

f t.

ft.

f t.

ft.

0 f t.

320 ft.

320 ft.

ft.

ft.

ft.

f t.

ft.

f t.

f t.

f t.

f t.

f t.

f t.

f t.

f t.

f t.

f t.

ft.

ft.

ft.

ft.

ft.

f t.

ft.

f t.

f t.

ft.

f t.

f t.

f t.

f t.

f t.

f t.

320 ft.

ft.

ft.

ft.

320 ft.

ft.

f t.

ft.

ft.

ft.

ft.

ft.

f t.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

320 ft.

320 ft.

320 ft.

320 ft.

320 ft.

320 ft. 320 f t.

320 ft.

ft.

320 ft.

f t.

320 ft.

320 ft.

0 f t.

ft.

f t.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

325 ft.

325 ft.

325 ft.

325 ft.

325 ft.

325 ft.

ft.

f t.

ft.

f t.

f t.

f t.

f t.

f t.

f t.

f t.

f t.

f t.

f t.

f t.

f t.

325 ft.

f t.

f t.

f t.

f t.

f t.

f t.

ft.

f t.

f t.

f t.

f t.

f t.

f t.

ft.

f t.

f t.

ft.

330 ft.

330 ft.

330 ft.

330 ft.

330 ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

335 ft.

f t.

f t.

f t.

f t.

f t.

ft.

f t.

f t.

f t.

335 ft.

f t.

f t.

ft.

ft.

f t.

f t.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

335 ft.

335 ft.

335 ft.

335 ft.

335 ft.

335 f t.

ft.

340 ft.

f t.

f t.

f t.

f t.

f t.

ft.

f t.

f t.

ft.

340 ft.

ft.

340 ft.

340 ft.

340 ft.

340 ft.

340 ft.

340 ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

340 ft.

340 ft.

340 ft.

f t.

f t.

f t.

f t.

ft.

ft.

ft.

f t.

f t.

ft.

ft.

ft.

ft.

5 f t.

f t.

345 ft.

ft.

345 ft.

345 ft.

f t.

345 ft.

f t.

f t.

345 ft.

345 f t.

f t.

5 f t.

f t.

345 ft.

345 ft.

ft.

ft.

ft.

f t.

ft.

ft.

345 ft.

ft.

345 ft

345 ft.

345 ft.

345 ft.

345 ft.

345 ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

ft.

0 f t.

350 ft.

350 ft.

350 ft.

ft.

f t.

ft.

350 ft.

350 ft.

350 ft.

350 ft. 3 f t.

f t.

350 ft

350 ft.

350 ft.

350 ft.

350 ft.

350 ft.

ft.

ft.

ft.

ft.

ft.

ft.

f t.

ft.

f t.

f t.

f t.

f t.

f t.

350 ft.

350 ft.

f t.

ft.

ft.

ft.

350 ft.

350 ft.

350 ft.

ft.

350 ft.

350 ft.

350 ft.

ft.

ft.

350 ft.

ft.

f t.

ft.

ft.

CS102

CS103

CS104

CS105 CS106

CS107

DIKE 7

DIKE 6

DIKE 5

DIKE 4

DIKE 3

DIKE 2

DIKE 1

KENTUCKY

ILLINOIS

O H

IO

R

IV

E R F

L O

W

DREDGE SPOIL AREA

CONTRACTOR WORK LIMITS

LEGEND

GENERAL SHEET NOTES

NOT PERMITTED.

PROVIDED. LAND ACCESS BETWEEN DIKES 1 THRU 3 IS

THE RIVER. LAND ACCESS BETWEEN DIKES 4 THRU 7 IS

ACCESS TO THE PROJECT SITES IS ONLY PROVIDED FROM 7.

TO SPECIFICATION 00 80 00.00 06.

ELEVATION 324.0. FOR OHIO RIVER HYDROGRAPHS, REFER

MINIMUM POOL ELEVATION (RIVER SURFACE ELEVATION) IS6.

FOR PROJECT LIMITS, REFER TO THE RIGHT-OF-WAY PLANS.5.

PROJECT LIMITS.

SURFACE SHALL BE SPREAD ATOP THE BANK WITHIN THE

EXCESS SOIL FROM CONSTRUCTION ABOVE THE WATER4.

SPOILED IN THE DESIGNATED DREDGE SPOIL AREA.

SOIL REMOVED FROM BELOW THE WATER SURFACE MUST BE3.

CONSTRUCTION (DIKES 1, 2 AND 3).

IS TO BE COMPLETED BEFORE BEGINNING PHASE 2

RIVER AT A TIME. PHASE 1 (DIKES 7 THRU DIKES 4)

IS ONLY PERMITTED TO OCCUR ON ONE SIDE OF THE

DOWNSTREAM TO UPSTREAM. ALSO, CONSTRUCTION

SHALL BE ACCOMPLISHED IN THE ORDER FROM

CONSTRUCTION IS TO BE PHASED. CONSTRUCTION2.

PROTECTING SEVERAL ENDANGERED BAT SPECIES.

FROM APRIL 1 TO SEPTEMBER 30 FOR PURPOSE OF

TREE REMOVAL (FELLING OF TREES) IS NOT PERMITTED1.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

CS101

O H

IO

R

IV

E

R D

IK

E

S A

T W

A B

A S

H C

O N

F L

U E

N C

E

U N

IO

N

C O

U N

T Y

K

E N

T U

C K

Y

P

F Y

A U

G U

S T

B D

O R

S C

H

B S

A Y

L O

R

R H

A R

R

IS

B D

O R

S C

H

A N

S I

D

A U

G U

S T

W

Q R

B

Z X

X X

X X

X X

X X

X

L

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

V E

R A

L L

S

IT

E P

L A

N

OVERALL SITE PLAN

1"=500'SCALE:

NORTH

PLAN

0 500' 1000'

R E

V

IS

E D

I N

A C

C O

R D

A N

C E

W

IT

H A

M D

T

A1

SF30
31 00 00.00 06
31 11 00
CS101

File details come from the government source that posted it. Updated .