UT FLAP 149(1), State Route 149 Widening

Awarded Award Notice Posted

Solicitation number
DTFH6817B00012
Agency
Federal Highway Administration Department of Transportation
Awarded
to Staker & Parson Companies
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6817C00027 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
near Dinosaur National Monument Jensen, Utah 84035, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: Jul 14, 2017 2:59 pm

THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE NOT CURRENTLY AVAILABLE.  THE TENTATIVE ADVERTISEMENT DATE IS JULY 31st.  THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS.

PROJECT DETAILS: UT FLAP 149(1), State Route 149 Widening

The proposed project includes rehabilitate and widening of a portion of Utah State Highway 149 near Jensen, UT from milepost 0.05 near US40 to milepost 4.2, the Dinosaur National Monument boundary, for a total length of about 4.17 miles. The project includes replacing the bridge that spans Brush Creek at MP 2.7.


The proposed typical section consists of widening from about 24 feet to a 32‐foot typical section, consisting of two 12‐foot travel lanes and 4‐foot paved shoulders. Roadway improvements include 3.5 inches of new asphalt concrete, embankments, retaining structures, drainage improvements, and safety improvements. Bridge reconstruction will consist of removing the existing 35-foot clear span length, 34 foot outside width, concrete bridge constructed in 1954 with a 60-foot clear span, 36 foot outside width, precast prestressed adjacent box beams structure with spill through type abutments founded on driven piles.


SIGNIFICANT QUANTITIES: 16,000 cuyd of embankment construction, 14,500 ton of roadway aggregate, 4.17 miles of full depth pavement reclamation (6 to 9 inches), 16,800 ton of asphalt concrete pavement (gyratory mix), 240 cuyd structural concrete, 640 lnft precast prestressed concrete slabs (48 inch voided).


No extended closures are allowed since the route is a main access for residences and National Monument visitors. The bridge will be built under phased construction, maintaining one lane of traffic at all times. In addition, bridge removal must occur during non-nesting season for Cliff Swallows (approximately September 1 to March 30). No night work will be allowed.


It is anticipated this project will be advertised in July, 2017 with the Notice to Proceed being issued in September, 2017. Construction is anticipated between October 2017 and May 2018 while farmland irrigation water is turned off. Estimated total cost is $6 to $8 million.


 

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
UT FLAP 149(1), State Route 149 Widening This notice · Latest Award Notice
UT FLAP 149(1), State Route 149 Widening Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity