UT FLAP 149(1), State Route 149 Widening
Awarded Award Notice Posted
- Solicitation number
- DTFH6817B00012
- Agency
- Federal Highway Administration Department of Transportation
- Awarded
- to Staker & Parson Companies
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- DTFH6817C00027 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Dinosaur National Monument Jensen, Utah 84035, United States
Notice details come from SAM.gov. Updated .
Notice text
Added: May 26, 2017 12:51 pm
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov or by telefax to 720-963-3360 (Attn: Craig Holsopple) for receipt by close of business (2 p.m. local Denver time) on June 2, 2017:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program. In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility - DO NOT SEND COPIES OF YOUR CCR PROFILE;
(3) Letter from bonding agent stating your firm's capability to bond for a single project of $8 million, and your firm's aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value and scope to the State Route 149 Widening project in which you performed (as the prime contractor) bridge reconstruction, new asphalt concrete, embankments, retaining structures, drainage improvements, and safety improvements. State whether your firm was the prime contractor or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.
PROJECT DETAILS: UT FLAP 149(1), State Route 149 Widening
The proposed project includes rehabilitate and widening of a portion of Utah State Highway 149 near Jensen, UT from milepost 0.05 near US40 to milepost 4.2, the Dinosaur National Monument boundary, for a total length of about 4.17 miles. The project includes replacing the bridge that spans Brush Creek at MP 2.7.
The proposed typical section consists of widening from about 24 feet to a 32‐foot typical section, consisting of two 12‐foot travel lanes and 4‐foot paved shoulders. Roadway improvements include 3.5 inches of new asphalt concrete, embankments, retaining structures, drainage improvements, and safety improvements. Bridge reconstruction will consist of removing the existing 35-foot clear span length, 34 foot outside width, concrete bridge constructed in 1954 with a 60-foot clear span, 36 foot outside width, precast prestressed adjacent box beams structure with spill through type abutments founded on driven piles.
SIGNIFICANT QUANTITIES: 16,000 cuyd of embankment construction, 14,500 ton of roadway aggregate, 4.17 miles of full depth pavement reclamation (6 to 9 inches), 16,800 ton of asphalt concrete pavement (gyratory mix), 240 cuyd structural concrete, 640 lnft precast prestressed concrete slabs (48 inch voided).
No extended closures are allowed since the route is a main access for residences and National Monument visitors. The bridge will be built under phased construction, maintaining one lane of traffic at all times. In addition, bridge removal must occur during non-nesting season for Cliff Swallows (approximately September 1 to March 30). No night work will be allowed.
It is anticipated this project will be advertised in July, 2017 with the Notice to Proceed being issued in September, 2017. Construction is anticipated between October 2017 and May 2018 while farmland irrigation water is turned off. Estimated total cost is $6 to $8 million.
Notice history
| Notice | Type | Posted |
|---|---|---|
| UT FLAP 149(1), State Route 149 Widening | Award Notice | |
| UT FLAP 149(1), State Route 149 Widening | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity