Plans_UT_FLAP_149(1).pdf
PDF 41 MB Posted
- Attached to
- UT FLAP 149(1), State Route 149 Widening Federal contract opportunity
- Solicitation number
- DTFH6817B00012
About this file
Plans for the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| UT_FLAP_149(1)_Q&A_8_29_17.pdf | ||
| UT_FLAP_149(1)_Questions_and_Answers.pdf | ||
| DTFH6817B00012_UT_FLAP_149(1)_IFB.pdf | ||
| FINAL_2017MAY_Hydraulics_Brush_Creek_Bridge.pdf | ||
| UT_FLAP_149(1)_Pavements_Report-FINAL-9-28-2015.pdf | ||
| DTFH6817B00012_UT_FLAP_149(1)_IFB.pdf | ||
| Xsections_UT_FLAP_149(1).pdf | ||
| UT_FLAP_149_(1)_FINAL_GEOTECH_REPORT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M
U T .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3
Power Conflict
Telephone Conflict
Natural Gas/Petroleum Conflict
Water Conflict
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M
U T .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
SITE MAP
A5
G re e n R iv e r
B r u s h C r e e k
STA 10+75.00
UT FLAP 149(1)
BEGIN PROJECT
STA 230+72.25
UT FLAP 149(1)
END PROJECT
Monument
National
Dinosaur
1.5 mi, RT side of US 40
Possible staging area
To Colorado border
S S t.
S S t.
E S t.
B r u s h C r e e k R d
F-859)
(UDOT Str. No.
Bridge
Brush Creek
13.4 Miles
To Vernal
2000'1000'0
Scale in Feet
0 1 0 1
0 1
133+50BK = 1133+50AH
STA EQUATION
1163+00BK = 163+03.25AH
STA EQUATION
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts A G e n s h t\
S it e
M a p
U T .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
P/E
P/ E
P/E
Station to Station
LENGTH OF PROJECT
TOTAL (mi)
(ft)
Roadway
(ft)
Bridge
NO SCALE
TOTALS (ft)
NOTE:
21,929.00
1:4
DETAIL A
30° - 35°
Asphalt concrete pavement
4' Shld12' Travel Way12' Travel Way4' Shld
1:4
C le a r in g L im it
(between lifts)
Tack coat
See Detail A
5'
Prime coat (prior to first lift)
8" from 169+00 to 230+69.
6" from 10+00 to 169+00 & from 4" to 11"; average depth is
Existing asphalt pavement depth varies
A6
Profile grade
Placed in two lifts
3.5" AC pavement aggregate
Roadway
Existing Width 20' to 26' (24' typ.)
MAINLINE
TYPICAL SECTIONS
1'-5"Shldr
Offset
1:2
1:2
2' slope
Fore-2'
20' Clear zone
Construction Limits
20' Clear zone
Seeding Topsoil &
12,275.00
6,769.00
4.17
Full depth reclamation (FDR), Method 2
Roadway aggregate
2%2%
1:4
1' Ditch
4' Shld12' Travel Way12' Travel Way4' Shld
1:4
C le a r in g L im it
C le a r in g L im it
(between lifts)
Tack coat
See Detail A
5'
Prime coat (prior to first lift)
Profile grade
Placed in two lifts
3.5" AC pavement
20' Clear zone
Construction Limits
20' Clear zone
Seeding Topsoil &
2%2%
1:4
1' Ditch
VariesVaries limit
Slope stake
2'
10+75 to 230+72.25
EXISTING TYPICAL SECTION
6" Roadway aggregate
1.
C le a r in g L im it
VariesVaries limit
Slope stake
3.
2'
Chip seal and fog seal
Chip seal and fog seal
3.
2.
1.
Slope stake limit
Slope stake limit
Topsoil & Seeding
Topsoil & Seeding
3R TYPICAL SECTION
Roadway aggregate
4R TYPICAL SECTION
sides of roadway)
(Detail applies to both right and left
Shoulder up with roadway aggregate pavement edge (safety edge)
Construct 30° - 35° pavement
Edge of
1:10 1:10
1133+50AH to 1151+45.67
10+75 to 133+50BK
1151+45.67 to 1152+10.67
1152+10.67 to 1163+00BK
163+03.25AH to 230+72.25
1,795.67
1,089.33
169+00 to 230+72.25
Station to Station Roadway Aggregate
Depth of FDR and
10+75 to 67+15 6"
71+07 to 133+50BK 6"
6"
1153+50 to 1163+00BK 6"
163+03.25AH to 169+00 6"
9"
1133+50AH to 1145+75
Station to Station
67+15 to 71+07
1:4
See Detail A
20' Clear zone
Seeding Topsoil &
Existing Slope
4' Shld
1:4 limit
Slope stake
GUARDRAIL TYPICAL SECTION
BARN-ROOF TYPICAL SECTION
CO to provide adequate drainage and stability.
Excavation and embankment slope ratios may be adjusted by the the first lift prior to placing the second lift.
Place asphalt concrete pavement in two lifts. Apply tack coat to the full-depth of existing asphalt pavement, whichever is larger.
Pulverize to the depth shown in table on this sheet, or 1" below
Pulverize the existing paved width plus 1' of new aggregate width.
1145+75 to 1153+50
:2
169+80 - 173+00 Rt
163+03 - 166+00 Rt
1144+75 - 1145+50 Rt
1143+50 - 1143+80 Rt
Varies
R ig h t o f
W a y L im it
Cut Slope
1(V):1.5(H) or Flatter
3.
or Flatter
1(V):2(H)
3.
Cut Slope
1(V):1.5(H) or Flatter
3.
or Flatter
1(V):2(H)
1:4
Existing Ground
Existing Ground
Existing Ground
Existing Ground
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
U T .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
4" Aggregate base x = 15' Minimum for type 2 approach x = 0' for type 1 approach
Standard Drawing 602-9).
roadway, use safety end sections (see placed within the clear zone of the mainline mainline recovery area. When a culvert must be radius to provide a flatter foreslope and increased
Place culverts at the end of the approach road
Variable
W
Variable
3' minimum
16'x
20' desired
15' min.
4' (typ.)
4' (typ.)
APPROACH ROADS
TYPICAL SECTIONS
widths greater than 15 feet.
Apply the normal crown to approach roads with
CLASSTYPE
APPLICATION
SAMPLE
Paved apron
ADT ≥ 200
100 ≤ ADT < 199
25 ≤ ADT < 100
ADT < 25
Minimum 2-Way Use
Logging Truck Use
Farm Equipment
Minimum 1-Way Use
Field Access
A
E
D
C
B
A
D
C
B
A
* Match existing
(ft)
W
WIDTH
MIN.
(ft)
R
RADIUS
MIN.
4' (typ.)
U s e r S ta c y .D ic c ic c o
A7
N/A
1' Ditch
A
B
A
B
M a in li e
Mainline
±2%
TYPICAL PROFILE
SECTION B-B
Shoulder edge
A
TYPICAL SYMBOL
M a in li grade (optional)
Typical maximum design
A
A B
B
SECTION A-A
b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
NOTE:Paved length
NO SCALE
base edge
Aggregate
Approach Road base edge
Aggregate b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
Approach Road
Flatten slope road connection on plan and profile sheet
Example of symbol showing standard approach
8.
4.
3.
8.
2.
3.
1.
2.
6.
2.
7.
Subgrade edge
Aggregate base edge
End Section A-A
End Section A-A
Total length
Paved length
90° W
Type
Class
Mainline stationing
Typical maximum grade ±10%VPI
VPC
90°
Typical culvert location edge subgrade
Normal
Aggregate base edge
R
Total length
R1
WW
with mainline roadway construction.
Construct cut and fill slopes for approach roads to match locations to be field verified.
Stations shown are approximate locations. Actual
8.
7.
6.
5.
4.
3.
2.
1.
maximum.
0% to -2% grade. Under special conditions, use 6% grades within ±2%. In snowy regions restrict this to a
Construct approach roads with landing areas having approach road centerline.
existing radii or widths. R is on the left side of the
Vary radii to fit unusual field conditions. Do not reduce
5. 5.
pavement edge
Asphalt concrete pavement edge
Asphalt concrete
Aggregate structural section thicknesses.
Use a 3" Asphalt Concrete Pavement on 6" Roadway shown may be varied.
Under special conditions, the approach road angle
1:3 1:3
1:
1:3 1:3
W
TYPICAL PLAN
APPROACH ROAD
TYPICAL PLAN
APPROACH ROAD
Varie s o r Fla tte r
(V ):1 .5 (H )2.
or Flatter
1(V):2(H) o r Fla tte r
(V ):1 .5 (H )2.
2.
or Flatter
1(V):2(H)
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
A P
U T .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
Sheet and Description
B6 B7 B8 B9-B10 B11-B15 S2
Grading Summary
Surfacing Summary
Drainage Summary
Approach Road
Summary
Misc.
Summaries Bridge ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15214-1000 SURVEY AND STAKING, BRIDGE LPSM ALL
A0060 15215-1000 SURVEY AND STAKING, APPROACH Includes Parking Area
ROAD EACH 5 5 Sta 229+30 Rt
A0080 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 26 26
A0100 15225-0000 SLOPE, REFERENCE, AND
CLEARING AND GRUBBING CONTROL MILE 4.170 4.170
A0120 15236-2000 SURVEY CONTROL, GRADE
FINISHING MILE 8.340 8.340
A0140 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0160 15401-0000 CONTRACTOR TESTING LPSM ALL
A0180 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0200 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 6,900 350 7,250
A0220 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 5,750 300 6,050
A0240 15706-0200 SOIL EROSION CONTROL, CHECK
DAM EACH 12 2 14
A0260 15706-1000 SOIL EROSION CONTROL, INLET
PROTECTION EACH 1 1
A0280 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0300 20101-0000 CLEARING AND GRUBBING ACRE 31.8 1.7 33.5
A0320 20301-1200 REMOVAL OF HEADWALL EACH 2 2
A0340 20301-1900 REMOVAL OF PIPE CULVERT EACH 24 24
A0360 20301-2400 REMOVAL OF SIGN EACH 33 33
A0380 20302-0700 REMOVAL OF FENCE LNFT 2,701 139 2,840
A0400 20304-2000 REMOVAL OF BRIDGE LPSM ALL
A0420 20402-0000 SUBEXCAVATION As directed by CO, CUYD 2,000 see Detail C204-51
A0440 20420-0000 EMBANKMENT CONSTRUCTION CUYD 15,016 754 15,770
A0460 20801-0000 STRUCTURE EXCAVATION CUYD 145 5 150
A0480 20803-0000 STRUCTURAL BACKFILL CUYD 65 2 67
A0500 20810-0000 SHORING AND BRACING LPSM ALL
A0520 20815-0000 COFFERDAMS LPSM ALL
A0540 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 74 6 80
A0560 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 31 4 35
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-M ay -2
:5
PM
N
U T\
9(
1) \R oa dw ay \E st im at es
_S ch ed ul es \E ng in ee r
Es tim at es
U
T-
FL
A P-
9-
1_ Es tim at e_ Fi na l.x ls x]
Sh ee t
STATE PROJECT
B1FLAP 149(1)UT
SHEET
NUMBER
Grading Summary
Surfacing Summary
Drainage Summary
Approach Road
Summary
Misc.
Summaries Bridge ALLOWANCE Bid
Schedule
A0580 25101-2400 PLACED RIPRAP, METHOD B,
CLASS 4 CUYD 385 30 415
A0600 25201-1000 SPECIAL ROCK EMBANKMENT,
MECHANICALLY-PLACED CUYD 151 14 165
A0620 25210-0000 ROCKERY SQFT 620 10 630
A0640 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 12,383 1,485 692 14,560
A0660 30401-5300 FULL DEPTH RECLAMATION,
METHOD 2, 6-INCH DEPTH MILE 2.997 2.997
A0680 30401-5600 FULL DEPTH RECLAMATION,
METHOD 2, 9-INCH DEPTH MILE 1.169 1.169
A0700 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL TON 15,248 773 799 16,820
A0720 40105-1000 ANTISTRIP ADDITIVE, TYPE 1 TON 152 8 8 168
A0740 40601-0000 FOG SEAL TON 34 2 36
A0760 40702-0200 CHIP SEAL, TYPE 1B SQYD 81,774 4,126 85,900
A0780 40711-0000 EMULSIFIED ASPHALT TON 102 5 107
A0800 41102-1000 PRIME COAT, METHOD 1 SQYD 79,996 4,731 4,233 88,960
A0820 41105-0000 BLOTTER TON 120
A0840 41201-0000 TACK COAT TON 34 3 2 39
A0860 55101-1700 STEEL H-PILE, 12 X 84, IN
PLACE LNFT 458 17 475
A0880 55104-1000 DYNAMIC PILE LOAD TEST EACH 2 2 Contract Quantity
A0900 55115-1000 PREBORING LNFT 360 360
A0920 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 238 238
A0940 55302-0500 PRECAST, PRESTRESSED CONCRETE
SLABS, 48-INCH VOIDED LNFT 640 640
A0960 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity
COATED LB 44,500 44,500
A0980 55601-0500 BRIDGE RAILING, CONCRETE Contract Quantity
(UDOT 42") LNFT 230 230
A1000 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 40 40
A1020 56901-0000 CONCRETE OVERLAY (THIN-BONDED Contract Quantity
EPOXY OVERLAY) SQYD 475 475
A1040 60103-0140 CONCRETE, HEADWALL FOR
24-INCH PIPE CULVERT EACH 1 1
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-J un -2
2:
P M
N
U T\
9(
1) \R oa dw ay \E st im at es
_S ch ed ul es \E ng in ee r
Es tim at es
U
T-
FL
A P-
9-
1_ Es tim at e_ Fi na l.x ls x]
Sh ee t (2
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B2FLAP 149(1)UT
Grading Summary
Surfacing Summary
Drainage Summary
Approach Road
Summary
Misc.
Summaries Bridge ALLOWANCE Bid
Schedule
A1060 60103-0280 CONCRETE, HEADWALL FOR
66-INCH PIPE CULVERT EACH 2 2
A1080 60103-1920 CONCRETE, HEADWALL FOR
24-INCH EQUIVALENT DIAMETER
PIPE CULVERT EACH 2 2
A1100 60201-0600 18-INCH PIPE CULVERT LNFT 342 18 360
A1120 60201-0800 24-INCH PIPE CULVERT LNFT 687 38 725
A1140 60201-1000 36-INCH PIPE CULVERT LNFT 111 4 115
A1160 60201-1500 66-INCH PIPE CULVERT LNFT 72 4 76
A1180 60202-0400 24-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 199 11 210
A1200 60210-0600 END SECTION FOR 18-INCH PIPE
CULVERT EACH 16 16
A1220 60210-0800 END SECTION FOR 24-INCH PIPE
CULVERT EACH 21 21
A1240 60210-1000 END SECTION FOR 36-INCH PIPE
CULVERT EACH 4 4
A1260 60211-0800 END SECTION FOR 24-INCH
EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT EACH 5 5
A1280 60404-1000 CATCH BASIN, FLH TYPE 1 EACH 1 1
A1300 60409-0100 INLET TOP, METAL FRAME AND
GRATE, FLH TYPE A EACH 1 1
A1320 60902-1000 CURB AND GUTTER, CONCRETE,
12-INCH DEPTH LNFT 1,372 3 1,375
A1340 60908-1000 PAVED DITCH, ASPHALT SQYD 305 305
A1360 61108-4000 ADJUST VALVE BOX EACH 2 Sta 48+76Lt & 114+11Lt
A1380 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2,
CLASS A STEEL POSTS LNFT 212 212
A1400 61701-4100 GUARDRAIL SYSTEM CRG, TYPE 2,
CLASS A LNFT 50 50
A1420 61702-0400 TERMINAL SECTION, TYPE G4-CRT EACH 1 1
A1440 61702-0800 TERMINAL SECTION TYPE TANGENT
(UDOT TYPE G) EACH 2 2
A1460 61707-0000 STRUCTURE TRANSITION RAILING LNFT 75 75 Contract Quantity
A1480 61711-0000 IMPACT ATTENUATOR (UDOT TYPE
B) EACH 1 1
A1500 61801-0000 CONCRETE BARRIER (UDOT 42" T0 Contract Quantity
32" TRANSITION) LNFT 100 100
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-J un -2
2:
P M
N
U T\
9(
1) \R oa dw ay \E st im at es
_S ch ed ul es \E ng in ee r
Es tim at es
U
T-
FL
A P-
9-
1_ Es tim at e_ Fi na l.x ls x]
Sh ee t (3
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B3FLAP 149(1)UT
Grading Summary
Surfacing Summary
Drainage Summary
Approach Road
Summary
Misc.
Summaries Bridge ALLOWANCE Bid
Schedule
A1520 61901-0000 FENCE (UDOT TYPE E) LNFT 613 37 650
A1540 61920-2000 REMOVE AND RESET GATE EACH 2 2
A1560 61921-1000 REMOVE AND RESET FENCE LNFT 95 5 100
A1580 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 40
A1600 62201-0350 BACKHOE HOUR 40
A1620 62201-0850 WHEEL LOADER, 1 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40
A1640 62201-1450 BULLDOZER, 350HP MINIMUM
FLYWHEEL POWER HOUR 40
A1660 62201-2050 ROLLER HOUR 40
A1680 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 40
A1700 62201-3100 HYDRAULIC EXCAVATOR, 3.0
CUBIC YARD MINIMUM CAPACITY,
165HP MINIMUM FLYWHEEL POWER HOUR 40
A1720 62301-0000 GENERAL LABOR HOUR 40
A1740 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 80
A1760 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 40
A1780 62405-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH SQYD 75,800 3,800 79,600
A1800 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 12.5 0.5 13.0
A1820 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 12.5 0.5 13.0
A1840 63301-0000 SIGN SYSTEM EACH 33 33
A1860 63308-0000 OBJECT MARKER EACH 8 8
A1880 63309-0000 DELINEATOR(UDOT
MAINTENANCE/CULVERT MARKER) EACH 52 52
A1900 63316-1000 REMOVE AND RESET SIGN EACH 7 7
A1920 63402-0300 PAVEMENT MARKINGS, TYPE B,
SOLID MILE 24.7 24.7
A1940 63402-0400 PAVEMENT MARKINGS, TYPE B,
BROKEN MILE 5.3 5.3
A1960 63501-1000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR LPSM ALL
A1980 63501-2000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC SIGNAL SYSTEM LPSM ALL
A2000 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 150
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-J un -2
2:
P M
N
U T\
9(
1) \R oa dw ay \E st im at es
_S ch ed ul es \E ng in ee r
Es tim at es
U
T-
FL
A P-
9-
1_ Es tim at e_ Fi na l.x ls x]
Sh ee t (4
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B4FLAP 149(1)UT
Grading Summary
Surfacing Summary
Drainage Summary
Approach Road
Summary
Misc.
Summaries Bridge ALLOWANCE Bid
Schedule
A2020 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 100
A2040 63502-1500 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE A EACH 100
A2060 63502-1700 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE C EACH 20
A2080 63502-2000 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN EACH 2
A2100 63503-0300 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 LNFT 50
A2120 63503-0400 TEMPORARY TRAFFIC CONTROL,
CONCRETE BARRIER LNFT 500
A2140 63503-0500 TEMPORARY TRAFFIC CONTROL,
MOVING CONCRETE BARRIER LNFT 500
A2160 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 265 15 280
A2180 63505-1000 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS MILE 8.3
A2200 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 2,700
A2220 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 600
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-J un -2
2:
P M
N
U T\
9(
1) \R oa dw ay \E st im at es
_S ch ed ul es \E ng in ee r
Es tim at es
U
T-
FL
A P-
9-
1_ Es tim at e_ Fi na l.x ls x]
Sh ee t (5
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B5FLAP 149(1)UT
B6
SUMMARY
GRADING
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts B S u m m G r a d in g S u m m a r y
U T .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
B7
SURFACING
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts B S u m m S u r fa c in g S u m m a r y
U T .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
B8
DRAINAGE
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts B S u m m D r a in a g e S u m m a r y
U T .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
APPROACH ROAD
Sheet 1 of 2
B9
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts B S u m m A p p r o a c h
R d S u m m a r y
U T .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
APPROACH ROAD
Sheet 2 of 2
B10
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts B S u m m A p p r o a c h
R d S u m m a r y
U T .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
SUMMARIES
MISCELLANEOUS
B11
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts B S u m m
M is c S u m m a r y
U T .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
B12
STATE PROJECT
P
M N U
T R o a d w a y C
A D
D S h e e ts B S u m m
M is c S u m m a r y
U T .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
B13
12"30"30"
33"
27"
R
12"30"30"
33"
R
R
27"
.7
.7
TURN LANE-USE ARROW
LANE-USE ARROW
TURN AND THROUGH
Control Devices'' (MUTCD), current edition.
accordance with the ''Manual on Uniform Traffic
Place pavement word and symbol markings in1.
NOTE:
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts B S u m m
M is c S u m m a r y
U T S tr ip in g .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
B14
Summary continued on next sheet
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts B S u m m
M is c S u m m a r y
U T P e r m
S ig n .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
B15
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts B S u m m
M is c S u m m a r y
U T P e r m
S ig n .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE PROJECT
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
W A
T E
R
P O
T
.0
W A
T E
R
W
W A
T E
R
I R
R
C1100'50'0
Scale in Feet
100'50'0
Scale in Feet
Sta. 10+75 to 23+00
PLAN SHEET
D r iv e w a y
V is ito r C e n te r
SR149
SR149
STA. 10+75.00
UT FLAP 149(1)
BEGIN PROJECT
A
B
B
B
B B
38' Rt.
Sta. 10+75, Install new fence
Remove existing fence
Sta. 10+75 to Sta. 12+70 Rt.
pavement
Sawcut existing
37' Rt.
Sta. 12+70, Do not disturb irrigation line
Existing underground
E=2240632.16
N=7310964.29 for additional information (Typ. all sheets).
Recorded Plan, not ground survey data. See U sheets
Note: Waterline and Irrigation lines shown are from
Marking Summaries.
See Survey and Pavement
(Approx. 250' x 64') existing pavement markings
Chip seal and re-establish
US40 to Sta. 10+75
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
W A
T E
R
I R
R
F L
A G P
O L E
W A
T E
R
I R
R
A S
P H
A L T D
R I V
E W
A Y
A S
P H
A L T D
R I V
E W
A Y
A S
P H
A L T D
R I V
E W
A Y
A S
P A
L T D
R I V
E W
A Y
C2
100'50'0
Scale in Feet
100'50'0
Scale in Feet
Sta. 23+00 to 38+00
PLAN SHEET
between trees
Field fit driveway
SR149
SR149
A
B
1 1 1
B 1
B
B
B
B
End section, Lt. & Rt.
Install 18" x 34' CMP
Remove existing culvert
Sta. 36+71
End section, Lt. & Rt.
Install 18" x 22' CMP
Remove existing culvert
Sta. 37+44
End section, Lt. & Rt.
Install 18" x 40' CMP
Remove existing culvert
Sta. 35+87
End section, Lt. & Rt.
Install 18" x 60' CMP
Remove existing culvert
Sta. 34+38
B
D
A
Riprap class 2, Lt.
End section, Lt. & Rt.
Install new 24" x 51' CMP
Remove existing culvert
Sta. 31+00
Do not disturb area outside of Construction Limits Sensitive environmental area
Remove existing fence
Sta. 30+75 to 31+25 Lt.
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
C3100'50'0
Scale in Feet
100'50'0
Scale in Feet
Sta. 38+00 to 52+00
PLAN SHEET
SR149
SR149
existing culvert
Do not disturb
Do not disturb irrigation line
Existing underground
A
B
A
3 1
B
B
B
A
B3
A existing culvert
Do not disturb match pavement
Adjust Valve box to
Sta 48+76 Lt
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
W A
T E
R
I R
R
W A
T E
R
I R
R
W A
T E
R
I R
R
C4
100'50'0
Scale in Feet
100'50'0
Scale in Feet
Sta. 52+00 to 66+00
PLAN SHEET
Do not disturb riser
SR149
SR149
C
B
B
B
B
B
A
A
End section, Lt. & Rt.
Install 18" x 60' CMP
Remove existing culvert
Sta. 53+40
End section, Lt. & Rt.
Install 18" x 30' CMP
Remove existing culvert
Sta. 59+29.00
V P I
E L
,7
.0
+0.051%
+6.1 67%
392' VC
K = 64
STATE PROJECT
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
W A
T E
R
I R
R
1+00
G R
A V P
A R
K I N
G A
R E
A
C5
100'50'0
Scale in Feet
66+00 67+00 68+00 69+00 70+00 71+00 72+00
Profile grade
Existing ground
66+00 to 73+00
PLAN & PROFILE SHEET
irrigation line
Existing underground
SR149
Superelevation Diagram
LT & RT EOP
-2.0%
73+00
0% 0%
10%
-10%-10%
10%
-2.0%
Profile grade
B 167+84
End section, Lt. & Rt.
Install 18" x 50' CMP
Remove existing culvert
Sta. 67+84
31' Lt.
Sta. 69+95, 31' Lt.
Sta. 71+14, 1+00 = SR149 68+85.00
Approach Road AP6800 existing irrigation
Do not disturb
Install new fence
Remove existing fence
Sta. 69+95 to Sta. 71+14 Lt.
Do not disturb existing irrigation pipe
Riprap Class 3 Rt.
End section Lt. & Rt.
Install 36" x 58' CMP, skew -15°
Sta. 71+65
STA. 67+15
RECONSTRUCTION
BEGIN PROFILE
STA. 71+07
RECONSTRUCTION
END PROFILE
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
48358
W C
R
POT 1+00.00
POT 1+75.00
P I
.8
C6
100'50'0
Scale in Feet
100'50'0
Scale in Feet
Sta. 73+00 to 87+00
PLAN SHEET
SR149
SR149
A
A
1+00 = SR149 74+42
Approach Road AP7400
End section, Lt. & Rt.
Install 18" x 46' CMP
Sta. 74+42
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
4830 4830
48358
P
E
P
E
P/E
W C
R
W C
L
W C
L
C7
100'50'0
Scale in Feet
100'50'0
Scale in Feet
Sta. 87+00 to 101+00
PLAN SHEET
existing culvert
Do not disturb
SR149
SR149
B
B
A
C
B
Riprap class 3, Rt.
End section with safety bars, Lt. & Rt.
Install new 36" x 53' CMP
Sta. 92+60 construction Do not disturb beyond limits of Environmentally sensitive area
Minimize disturbance
Sta. 92+00 to Sta. 93+00 Rt.
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
T S
.1
S C
.1
F L
A G P
O L E
T A
N K
4835 4
T A
N K
C8
100'50'0
Scale in Feet
100'50'0
Scale in Feet
Sta. 101+00 to 115+00
PLAN SHEET
S S t.
S S t.
SR149
SR149
Spiral = MAIN-1B
PI 114+44.21
f
Ls = 240.00'
A
A
A
B
A
A
B irrigation line
Existing underground
Riprap class 2, Rt.
End section, Lt. & Rt.
Install new 28"x20" x 47' CMP, skew 6°
Remove existing culvert
Sta. 102+65 match pavement Adjust valve box to Sta 114+11 Lt
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
S T
.2
POT 1+00.00
1+00
PI 1+16.00
P O
T
.5
0 1
S C
.1
C S
.3
TURN LEVELS OFF IN PLANMOTIF(MAIN282)FLAP149.DGN NOT THE C SHEETS
BOTTOM VIEW IS NOT
TOP VIEW IS GEOSPACIALLY CORRECT, PLAN VIEW LABELER CAN BE USED
C9
100'50'0
Scale in Feet
100'50'0
Scale in Feet
Sta. 115+00 to 129+00
PLAN SHEET
0 E St.
1+00 = SR149 116+42.40
Approach Road AP11600
Spiral = MAIN-1A
PI 120+42.36
f
Ls = 239.97'
Curve = MAIN-1
PI 117+45.03
D
D
R = 1,400.00'
Ts1 = 466.26'
Ts2 = 466.24'
L = 438.16'
SR149 (AZ)
Remove existing culvert
Sta. 115+43.23 existing culvert
Do not disturb
Sta. 120+36.93 irrigation line
Existing underground
Riprap class 2, Rt.
End section, Lt. & Rt.
Install new 28" x 20" x 50' CMP, skew -6°
Sta. 115+98
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
P C
.2
S
.0
B
K
.0
A
H Bu rn s
Be nc h
Bu rn s
Be nc h
Bu rto n Di tc h
TURN LEVELS OFF IN PLANMOTIF(MAIN282)FLAP149.DGN NOT THE C SHEETS
BOTTOM VIEW IS NOT
TOP VIEW IS GEOSPACIALLY CORRECT, PLAN VIEW LABELER CAN BE USED
100'50'0
Scale in Feet
C10
E S t.
1+00 = SR149 132+50.43
Approach Road AP13200
SR149
A
A
132+ existing culvert
Do not disturb
1133+50AH to 1143+00
Sta. 129+00 to 133+50BK
PLAN SHEET
Station Equation
C
A
Riprap class 2, Rt.
End section Lt. & Rt.
Install 24" x 80' CMP
Sta. 1141+90 irrigation lines (2) existing underground
Do not disturb
100'50'0
Scale in Feet
Riprap class 2, Rt.
with safety bars at outlet
End section at inlet, end section
Install new 24" x 67' CMP
Sta. 132+50
C h e v r o n
Q u e s ta r
V P I
E L
,7
.1
-6.711%
+1.217%
914' VC
K = 115
TURN LEVELS OFF IN PLANMOTIF(MAIN282)FLAP149.DGN NOT THE C SHEETS
BOTTOM VIEW IS NOT
TOP VIEW IS GEOSPACIALLY CORRECT, PLAN VIEW LABELER CAN BE USED
100'50'0
Scale in Feet
C11
Profile grade
Existing ground
B
B
Station 1145+75
Reconstruction
Begin
AREA L
EFT B
LANK IN
TENTIO
NALLY
1146+00 1147+00 1148+00 1149+00
STATE PROJECT
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
1150+001145+001144+00
Station 1145+75
Reconstruction
Begin
B
1143+00
Guardrail, Rt.
Tangent guardrail terminal, Rt.
10%
0%
-10%
-2.0%
PGL
LT & RT EOP
1143+00 to 1150+00
PLAN & PROFILE SHEET
Sta 1143+80 - 1144+75 Rt
Construct Special Rock
Embankment, see Special 252-B
Riprap class 2, Rt.
with safety bars at outlet
End section at inlet, end section
Install 24" x 40' CMP
Remove existing culvert
Sta. 1149+32
Sta. 1144+90 Rt to 1151+57 Rt
+1.217% V
P I
E L
,7
.2
175' VC
K = 213
+2.039%
STATE PROJECT
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
T S
.6
S C
.6
0M id A m e r ic a E n te r p r is e
100'50'0
Scale in Feet
C12
Profile grade
Existing ground
B r u s h C r e e k
Superelevation Diagram
LT & RT EOP
-2%
10%
0%0%0%
-10%
10%
-10%
PGL
B
A
A
B
Brush Creek Bridge and approach slabs
Guardrail, Rt.
Concrete transition barrier, Lt. and Rt.
Lt. and Rt.
barrier, transition Concrete
Tangent guardrail terminal, Lt.
A of the SCRs See Subsection 108.01
UDOT structure number F-859
Structure transition rail, Lt. and Rt.
Impact attenuator, Lt.
Structure transition rail, Rt.
Curved terminal, type CRT, Rt.
1150+00 to 1157+00
PLAN & PROFILE SHEET
1150+00 1151+00 1152+00 1153+00 1154+00 1155+00 1156+00 1157+00
Elev= 4754.07
Sta= 1151+45.67
Begin Bridge
Elev= 4754.86
Sta= 1152+10.67
End Bridge
Spiral = EQN-BRIDGE-1B
PI 1155+38.00
f
Ls = 200.00'
Station 1153+50
Reconstruction
End
Station 1153+50
Reconstruction
End
AREA L
EFT B
LANK IN
TENTIO
NALLY
See S sheets Sta. 1151+45.67
Begin Bridge
See S sheets Sta. 1152+10.67
End Bridge
Remove existing fence
Sta. 1144+90 to Sta. 1151+57 Rt. Remove existing fence
Sta. 1152+11 to Sta. 1153+01 Rt.
Remove existing fence
Sta. 1155+06 to Sta. 1158+70 Rt.
Sta 1152+00 to Sta. 1152+80 Lt.
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
4765 4765
47704775
S C
.6
C S
.5
S T
.5
.0
B
K
.2
A
H
100'50'0
Scale in Feet
C13
SR149
Do not disturb existing culvert
Sta. 1157+38
1163+00BK=163+03.25AH
Sta. 1157+00 to
PLAN SHEET
AREA LEFT B
LANK IN
TENTIO
NALLY
Station Equation
Install new fence Remove existing fence Sta. 1157+48 to 1158+45 Lt.
38' Lt.
Sta. 1157+48, 40' Lt.
Sta. 1158+45, Riprap class 2, Rt.
Drop Inlet, Lt.
Concrete headwall, Rt.
Install new 28"x20"x48' CMP, skew 1°
Remove existing culvert
Sta. 1158+93 and gutter Construct paved ditch with curb 163+03AH to 163+50 Lt Sta 1158+25 to 1163+00BK Lt
Remove existing fence
Sta. 1155+06 to Sta. 1158+70 Rt.
Sta. 1159+62 to Sta. 1161+94 Rt.
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
W
W
W A
T E
R
I R
R
W A
T E
R
I R
R W A
T E
R
I R
RW
A
T E
R
I R
R
W A
T E
R
I R
R
W A
T E
R
I R
R W A
T E
R
I R
R
P C
.5
.0
B
K
.2
A
H
Pump House
Irrigation
100'50'0
Scale in Feet
C14
SR149
A
B irrigation line
Existing underground Begin 9" full depth reclamation Sta. 169+00 paved ditch, Lt.
Install curb and gutter and Sta. 167+00 to Sta. 169+00
Install Rockery, Lt.
Sta. 167+50 to Sta. 168+50
100'50'0
Scale in Feet
Curve = MAIN-5
PI 178+21.12
D
R = 4,000.00'
T = 1,035.57'
L = 2,026.64'
Riprap class 2, Rt.
End section Lt. & Headwall Rt.
Install new 24" x 55' CMP, skew 4°
Remove existing culvert
Sta. 171+74
Sta. 163+03.2AH to 177+00
PLAN SHEET
Station Equation
Riprap class 2, Rt.
End section, Lt.
Headwall, Rt.
Install 28"x20" x 54' CMP, skew -3°
Remove existing culvert
Sta. 165+24
Riprap class 2, Rt.
End section, Lt. & Rt.
Install new 24" x 55' CMP, skew 5°
Sta. 175+56
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
04770
P T
.2
W
W ill ia m s
N W p ip el in e
N at ur al G as
C15
Sta. 177+00 to 191+00
PLAN SHEET
S S t.
SR149 (AZ)
B
B
C
100'50'0
Scale in Feet
B
SR149
Murray Canal irrigation line
Existing underground
Do not disturb
B
B
B
B
A
B
100'50'0
Scale in Feet Riprap class 2, Rt.
End section, Lt. & Rt.
Install new 24" x 63' CMP, skew -19°
Sta. 185+82
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
W y o m in g I n te rs ta te P ip e li n e
W ill ia m s
N W p ip el in e
N at ur al G as
W y o m in g I n te rs ta te P ip e li n e
TURN LEVELS OFF IN PLANMOTIF(MAIN282)FLAP149.DGN NOT THE C SHEETS
BOTTOM VIEW IS NOT
TOP VIEW IS GEOSPACIALLY CORRECT, PLAN VIEW LABELER CAN BE USED
C16
Sta. 191+00 to 205+00
PLAN SHEET
100'50'0
Scale in Feet
SR149
A
SR149
C
100'50'0
Scale in Feet
Riprap class 2, Rt.
End section, Lt. & Rt.
Install new 24" x 61' CMP, skew 1°
Remove existing culvert
Sta. 193+86
Riprap class 2, Rt.
End section, Lt. & Rt.
Install 24" x 81' CMP, skew -6°
Remove existing culvert
Sta. 203+71
Sta. 191+00 to Sta. 196+00 Rt.
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
4800 4800
TURN LEVELS OFF IN PLANMOTIF(MAIN282)FLAP149.DGN NOT THE C SHEETS
BOTTOM VIEW IS NOT
TOP VIEW IS GEOSPACIALLY CORRECT, PLAN VIEW LABELER CAN BE USED
C17
Sta. 205+00 to 219+00
PLAN SHEET
SR149
B
100'50'0
Scale in Feet
A
A
SR149
100'50'0
Scale in FeetRiprap class 2, Rt.
End section, Lt. & Rt.
Install new 24" x 67' CMP, skew 1°
Sta. 215+57
P
M N U
T R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
G R
A N
IT
E M
A R
K E
S C
A L
A N
T E C
R O
S S
E D H
E R
E
FLAG POLE
TURN LEVELS OFF IN PLANMOTIF(MAIN282)FLAP149.DGN NOT THE C SHEETS
BOTTOM VIEW IS NOT
TOP VIEW IS GEOSPACIALLY CORRECT, PLAN VIEW LABELER CAN BE USED
C18
SR149
B
A
100'50'0
Scale in Feet
SR149
A
A
100'50'0
Scale in Feet E= 2243641.14
N= 7332249.64
STA. 230+72.25
UT FLAP 149(1)
END PROJECT
Sta. 219+00 to 230+72.25
PLAN SHEET
1:
21:2
DETAIL A
Geotextile
2' 2'
2'
12" depth Placed riprap, Class 2
Remove and reset gate (2)
See Detail A this sheet Construct riprap ditch
Paid for under Section 623 pay items
Grade ditch to daylight
Approx. 2' grade raise max.
Approx. 150' long x 25' wide
Raise grade of parking area
Remove and reset existing fence Sta. 230+20 to 230+72 Lt.
Remove and reset existing fence Sta. 230+72 Rt.
UDOT structure number H-2720
Headwalls and wingwalls, Lt. & Rt.
Install new 66" x 72' CMP, skew -15°
Remove existing culvert and headwalls
Sta. 221+77
Riprap class 2, Rt.
End section, Lt. & Rt.
Install new 24" x 67' CMP, skew 1°
Remove existing culvert
Sta. 226+49
Minimize impacts
P
M N U
T R o a d w a y C
A D
D S h e e ts D
M in o r P
P D
.d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
P O
T
.0
P O
T
.0
74+00
75+00
PI 75+56.85
T
V P I
E L
,7
.9
,7
.2
V P I
E L
,7
.0
4' VC
K = 1
SSD = 218'
V P I
E L
,7
.5
-2.138%
20' VC
K = 2
,7
.2
-6.0% -11.0%
-2.0%
P O
T
.0
P O
T
.0
68+00
69+00
70+00
T
GRAV PARKING AREA
48" DIA POSS WATER
V P I
E L
,8
.7
,8
.1
V P I
E L
,8
.4
-2.000%
10' VC
K = 3
SSD = 281'
V P I
E L
,8
.2
-5.910% +1.204%
10' VC
K = 1
,8
.2
D1
AP6800
1+00 2+00
4,770
4,775
4,780
4,785
4,790
4,795
4,800
4,805
4,810
AP7400
100'50'0
Scale in Feet
100'50'0
Scale in Feet
1+00 2+00
4,770
4,775
4,780
4,785
4,790
4,795
4,800
4,805
4,810 4,835
4,830
4,825
4,820
4,815
4,810
4,795
4,800
4,805
4,835
4,830
4,825
4,820
4,815
4,810
4,795
4,800
4,805
Profile grade
Profile grade
Existing ground
R= 25'
R= 25'
R= 25'
R= 25'
Sta. 1+75
Match existing
Existing ground
Sta. 1+57
Match existing
4,815 4,8404,815 4,840
Approach Road Sta. 1+00
Mainline Sta. 74+41.77 =
Approach Road Sta. 1+00
Mainline Sta. 68+85 =
End Approach Road
Sta. 1+75
End Approach Road
Sta. 1+57
Private DrivewayPrivate Driveway
P
M N U
T R o a d w a y C
A D
D S h e e ts D
M in o r P
P D
.d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
P O
T
.0
P I
.0
2+00
POT 2+17.59
116+00
117+00
118+00
P O
T
.0
P O
T
.4
131+00
132+00
133+00
PC 133+67.23
T
S10336
V P I
E L
,8
.4
+5.8 00%
-0.200%4 ,8
.4
V P I
E L
,8
.3
V P I
E L
,8
.9
-3.803% -1.000%
28' VC
K = 10
,8
.7
V P I
E L
,8
.2
+1.795%
,8
.9
V P I
E L
,8
.0
-0.544%
-10.889%
9' VC
K = 1
SSD = 109'
,8
.2
D2
1+00 2+00
4,820
4,825
4,830
4,835
4,840
4,845
4,850
4,855
4,860
AP11600 AP13200
1+00 2+00
4,820
4,825
4,830
4,835
4,840
4,845
4,850
4,855
4,860
4,820
4,825
4,830
4,835
4,840
4,845
4,850
4,855
4,815
4,820
4,825
4,830
4,835
4,840
4,845
4,850
4,855
4,815
100'50'0
Scale in Feet
100'50'0
Scale in Feet
9500 E St.
E S t.
E 3
0 S St
E 3750 S St.
Profile grade
Existing ground
R= 15'
R= 25'
4,865 4,865 4,860 4,860
Profile grade
Existing ground
Sta. 1+90
Match existing
Approach Road Sta. 1+00
Mainline Sta. 116+42.40 =
Approach Road Sta. 1+00
Mainline Sta. 132+50.43 =
Sta. 1+78.02
Match existing
20'
Sta. 1+90
End Approach Road
°0
R=5
Sta. 1+78.02
End Approach Road
E1100'50'0
Scale in Feet
100'50'0
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
STA. 10+75.00
BEGIN PROJECT
10+75 to 25+00
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
S T
O P
E2
100'50'0
Scale in Feet
100'50'0 sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
25+00 to 39+00
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
A S
P H
A L T D
R I V
E W
A Y
A S
P H
A L T D
R I V
E W
A Y
A S
P H
A L T D
R I V
E W
A Y
A S
P A
L T D
R I V
E W
A Y
0S
T O
P
F L
A G P
O L
E3100'50'0
100'50'0
Scale in Feet
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
39+00 to 54+00
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
E4
Scale in Feet
100'50'0
Scale in Feet
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
54+00 to 68+00
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
P R
O P
A N
E T
A N
K
P R
O P
A N
E T
A N
K
E5
Scale in Feet
NOTE:
100'50'0
Scale in Feet sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
68+00 to 83+00
CONTROL
EROSION AND SEDIMENT
P I
.8
G R
A V P
A R
K I N
G A
R E
A
P I
.8
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
E6
Scale in Feet
100'50'0
Scale in Feet
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
83+00 to 97+50
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
P
E
P
P/E
E7
Scale in Feet
100'50'0
Scale in Feet
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
97+50 to 111+50
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
T A
N K
F L
A G P
O
E8
Scale in Feet
100'50'0
Scale in Feet
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
111+50 to 125+50
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
T S
.1
S C
.1
T A
N K
S T
O P
S T
O P
S T
O P
C S
.3
S T
.2
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
P C
.2
U N
D E
R G
R O
U N
D T
E L E P
H O
N E
.0
B
K
.0
A
H
TURN LEVELS OFF IN PLANMOTIF(MAIN282)FLAP149.DGN NOT THE C SHEETS
BOTTOM VIEW IS NOT
TOP VIEW IS GEOSPACIALLY CORRECT, PLAN VIEW LABELER CAN BE USED
E9
100'50'0
Scale in Feet
100'50'0
Scale in Feet
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
Station Equation
1133+50AH to 1139+50
125+50 to 133+50BK
CONTROL
EROSION AND SEDIMENT
TURN LEVELS OFF IN PLANMOTIF(MAIN282)FLAP149.DGN NOT THE C SHEETS
BOTTOM VIEW IS NOT
TOP VIEW IS GEOSPACIALLY CORRECT, PLAN VIEW LABELER CAN BE USED
100'50'0
Scale in Feet
E11
100'50'0
Scale in Feet
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
163+03.25AH to 167+50
1153+50 to 1163+00BK
CONTROL
EROSION AND SEDIMENT
Station Equation
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
S T
A N
D P
IP
E
T S
.6
S C
.6
C S
.5
P C
.5
C S
.5
S T
.5
.0
B
K
.2
A
H
100'50'0
Scale in Feet
E12
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
167+50 to 181+00
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
P C
.5
TOP VIEW IS GEOSPACIALLY CORRECT, PLAN VIEW LABELER CAN BE USED
100'50'0
Scale in Feet
100'50'0
Scale in Feet
E13
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
181+00 to 195+50
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
P T
.2
W
P T
.2
TOP VIEW IS GEOSPACIALLY CORRECT, PLAN VIEW LABELER CAN BE USED
100'50'0
Scale in Feet
100'50'0
Scale in Feet
E14NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
195+50 to 209+50
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
TOP VIEW IS GEOSPACIALLY CORRECT, PLAN VIEW LABELER CAN BE USED
100'50'0
Scale in Feet
100'50'0
Scale in Feet
E15
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
209+50 to 223+50
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
100'50'0
Scale in Feet
E16
TURN LEVELS OFF IN ECPMOTIF(MAIN282)FLAP149.DGN NOT THE E SHEETS
BOTTOM VIEW IS NOT
TOP VIEW IS GEOSPACIALLY CORRECT, PLAN VIEW LABELER CAN BE USED
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion and sediment control devices not to scale.
2.
1.
STA. 230+72.25
END PROJECT
223+50 to 230+72.25
CONTROL
EROSION AND SEDIMENT
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E E
C P E .d g n
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
STATE ROUTE 149 WIDENING
UT FLAP 149(1)
FLAG POLE
P O
T
.9
G R
A N
IT
E M
A R
K E
S C
A L
A N
T E C
R O
S S
E D H
E R
E
SILT FENCE
6" min. trench
6" min.
18" min.
30" min.
24" min.
C157-50
NOTE:
4.
3.
2.
1.
6 ft. (max.)
fence support mesh = withoutPost spacing
10 ft. (max.)
fence support mesh =withPost spacing running around the ends.
fence up the slope to prevent water from
As the slope is constructed, curve the silt contours as closely as possible.
Install silt fence to follow the ground manufacturer's recommendations.
machine-sliced silt fence according to the slicing as approved by the CO. Install
Silt fence may be installed using machine
A
M N U
T R o a d w a y C
A D
D S h e e ts E C .d g n
U s e r S ta c y .D ic c ic c o
DETAIL APPROVED FOR USE
REVISED: 08/2014
E17
ELEVATION
PLAN
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Flow Fi ll slo pe
Flow
T o e o f s lo p e
Flow
(undisturbed)
Existing ground
END POSTS DETAIL
PLAN
PLAN
END DETAIL
ELEVATION
Fi ll sl op e
Steel or wood post
Backfilled and compacted soil
Limits of clearing
Steel or wood post
Varies
Varies
See Note 3 for spacing
See Note 4
Fasten fabric to posts.
around each post one full turn.
Fold geotextile fabric
NO SCALE
PLAN
T o e o f s lo p
Note 3See
Staple or tie
Top of posts tied together.
Posts driven tightly together.
Steel or wood posts
POSTS AT JOINTS
See End Posts Detail
End posts
Geotextile fabric
Staple or tie
SILT FENCE AS PERIMETER CONTROL
Fill
Existing ground
Sheet flow Silt fence
PLAN
SECTION A-A
A
A
Roadway
Edge of shoulder
Edge of shoulder
Toe of slope
Toe of slope
Posts Detail
See End
End posts
Silt fence
Fence support mesh (optional)
Section A fabric
Geotextile
Section B
Geotextile fabric
Geotextile
See Typical Section Sheet
STATE PROJECT
A
M N U
T R o a d w a y C
A D
D S h e e ts E C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
UT
DROP INLET PROTECTION (TYPE C)
PREFABRICATED FILTER INSERT
Back of curb
Face of curb
1-bag high
Spillway
PLAN VIEW - INLET AT SAG
high
1-bag
Spillway
B
B
SECTION A-A
Drop inlet grate
PLAN VIEW - INLET ON GRADE
Flow
Face of curb
Back of curb
Flow
1-bag high
Spillway basin
Catch
SECTION B-B
onto curb bags overlap
Gravel filled
A
A Drop inlet grate
PLAN
Drop inlet
DROP INLET PROTECTION (TYPE B)
GRAVEL BAG BERM
Flow
(stacked tightly)
Gravel filled bags
Spillway (beyond)
Drop inlet
Flow Flow
Drop inlet grate
See Note 5
2-bags high
Gravel filled bags
See Note 5
2-bags high
Gravel filled bags
Accumulated sediment
Accumulated sediment
Drop inlet grate
Expansion restraint
Prefabricated filter insert
Dump straps (2 each)
Lifting loops (2 each)
Drop inlet
Fiber roll
Fiber roll in full contact with the ground
DROP INLET PROTECTION (TYPE A)
FIBER ROLL
PROTECTION
TEMPORARY INLET
NO SCALE
Sheet 1 of 2
NOTE:
1" x 1" or 1" ø wood stake. See Note 2.
5.
4.
3.
2.
1.
DETAIL APPROVED FOR USE
NUMBER
SHEET
A
M N U
T R o a d w a y C
A D
D S h e e ts E C .d g n
U s e r S ta c y .D ic c ic c o
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
9" ø min. fiber roll
3" in diameter.
with clean, silt-free coarse aggregate between 2" and bags. Cover geotextile fabric to the top of the fabric geotextile fabric a minimum of 18" upstream of the the next layer of bags on top of it. Extend the to the spillway elevation. Anchor the fabric by placing face of the bags. Place fabric over the top of the bags geotextile filter, class 2, type C along the upstream bags. Where tight fit is unachievable, install ensure no sediment flows between or underneath the
Pack gravel filled bags tightly together end to end to of curb minus 1".
Maximum top of gravel bag spillway elevation = Top
12" x 18".
Approximate finished dimension of gravel bags is soil.
on center. Drive stakes 12" (min.) into undisturbed
Install fiber roll with stakes spaced no more than 24" as approved by the CO.
Select the inlet protection device to fit field conditions
UT
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .