Uninterruptable Power Supply (UPS) Maintenance

Awarded Award Notice Posted

Solicitation number
HQC00716T0020
Agency
Defense Commissary Agency Department of Defense
Awarded
to Pergravis LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
HQC00716P0010 Federal contract award
NAICS code
811212 Computer and Office Machine Repair and Maintenance
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

9 versions

Update #9 · Latest ·

Awarded Vendors: PERGRAVIS, LLC. Contract Award Dollar Amount: not to exceed $162,521.00. Contract Award Date: 2016-07-01.

Update #8 ·

Q & A document updated on 13JUN. The Production environment UPS system at Fort Lee is 225 KVA, not 100 KVA as previously stated. Further, the UPS system at DeCA West (California) does have an SNMP/Web card installed and DeCA does require remote monitoring for that system IAW the PWS.
********************************************************
Offerors must acknowledge the amendment via emailed response to Erich.Wieber@deca.mil to be considered for award.
Amendment 0002:
Amendment issued to add a third UPS system to the acquisition. DeCA has a second UPS at Fort Lee, VA which requires maintenance and optional battery replacement.
HQ (Ft. Lee, VA) - UPS System: Powerware (Eaton) - Serial #: EB062CAA09 - Battery Qty (each): 40 - Battery Manufacturer: C & D Technologies - Battery Model: LS 12-100 - 80 KVA
*****************************************************
Amendment 0001:
Amendment issued to remove the requirement for OEM maintenance plans. The solicitation now includes a PWS which offerors must respond to and address how they will meet or exceed the requirements listed.


Additionally, an alternate battery model has been approved for the Powerware UPS at DeCA HQ.


Finally, vendors are authorized to quote a maximum annual escalation rate for the battery replacement. In evaluating offers, the Government will determine the total evaluated price by adding the FFP maintenance costs of the base and four option years and then adding the maximum one-time battery replacement price to reach the total evaluated price. For example, if the proposed battery replacement cost were $100 and the maximum annual escalation proposed were 5%, the evaluated price for the battery replacement w ould be $121.55 (5% annual increase applied 4 times).
*****************************************************
Please see the attached RFQ and brand-name justification for batteries.
Two UPS systems require maintenance and optional battery replacement. Base year plus four 1-year option periods.


HQ (Ft. Lee, VA) - UPS System: Powerware (Eaton) - Serial #: EW062ZXX03 -
Battery Qty (each): 160 - Battery Manufacturer: ENERSYS - Battery Model: HX500 or HX540
West (McClellan, CA) - UPS System: Schneider Electric (APC) - Serial #: PD1303150001 - Battery Qty (each): 36 (9 Strings of 4 batteries) - Battery Manufacturer: APC - Battery Model: SYBT9-B4


.

Update #7 ·

Added: Apr 05, 2016 10:38 am Modified: Jun 13, 2016 11:46 amTrack Changes

Q&A document updated on 13JUN.  The Production environment UPS system at Fort Lee is 225 KVA, not 100 KVA as previously stated.  Further, the UPS system at DeCA West (California) does have an SNMP/Web card installed and DeCA does require remote monitoring for that system IAW the PWS.
********************************************************
Offerors must acknowledge the amendment via emailed response to Erich.Wieber@deca.mil to be considered for award. 

Amendment 0002:
Amendment issued to add a third UPS system to the acquisition.  DeCA has a second UPS at Fort Lee, VA which requires maintenance and optional battery replacement.

HQ (Ft. Lee, VA) - UPS System: Powerware (Eaton) - Serial #: EB062CAA09 - Battery Qty (each): 40 - Battery Manufacturer: C & D Technologies - Battery Model: LS 12-100 - 80 KVA
*****************************************************
Amendment 0001:
Amendment issued to remove the requirement for OEM maintenance plans. The solicitation now includes a PWS which offerors must respond to and address how they will meet or exceed the requirements listed.


Additionally, an alternate battery model has been approved for the Powerware UPS at DeCA HQ.


Finally, vendors are authorized to quote a maximum annual escalation rate for the battery replacement. In evaluating offers, the Government will determine the total evaluated price by adding the FFP maintenance costs of the base and four option years and then adding the maximum one-time battery replacement price to reach the total evaluated price. For example, if the proposed battery replacement cost were $100 and the maximum annual escalation proposed were 5%, the evaluated price for the battery replacement w ould be $121.55 (5% annual increase applied 4 times).
*****************************************************
Please see the attached RFQ and brand-name justification for batteries.
Two UPS systems require maintenance and optional battery replacement. Base year plus four 1-year option periods.


HQ (Ft. Lee, VA) - UPS System: Powerware (Eaton) - Serial #: EW062ZXX03 -
Battery Qty (each): 160 - Battery Manufacturer: ENERSYS - Battery Model: HX500 or HX540
West (McClellan, CA) - UPS System: Schneider Electric (APC) - Serial #: PD1303150001 - Battery Qty (each): 36 (9 Strings of 4 batteries) - Battery Manufacturer: APC - Battery Model: SYBT9-B4


 

Update #6 ·

Offerors must acknowledge the amendment via emailed response to Erich.Wieber@deca.mil to be considered for award.
Amendment 0002:
Amendment issued to add a third UPS system to the acquisition. DeCA has a second UPS at Fort Lee, VA which requires maintenance and optional battery replacement.
HQ (Ft. Lee, VA) - UPS System: Powerware (Eaton) - Serial #: EB062CAA09 - Battery Qty (each): 40 - Battery Manufacturer: C & D Technologies - Battery Model: LS 12-100 - 80 KVA
*****************************************************
Amendment 0001:
Amendment issued to remove the requirement for OEM maintenance plans. The solicitation now includes a PWS which offerors must respond to and address how they will meet or exceed the requirements listed.


Additionally, an alternate battery model has been approved for the Powerware UPS at DeCA HQ.


Finally, vendors are authorized to quote a maximum annual escalation rate for the battery replacement. In evaluating offers, the Government will determine the total evaluated price by adding the FFP maintenance costs of the base and four option years and then adding the maximum one-time battery replacement price to reach the total evaluated price. For example, if the proposed battery replacement cost were $100 and the maximum annual escalation proposed were 5%, the evaluated price for the battery replacement w ould be $121.55 (5% annual increase applied 4 times).
*****************************************************
Please see the attached RFQ and brand-name justification for batteries.
Two UPS systems require maintenance and optional battery replacement. Base year plus four 1-year option periods.


HQ (Ft. Lee, VA) - UPS System: Powerware (Eaton) - Serial #: EW062ZXX03 -
Battery Qty (each): 160 - Battery Manufacturer: ENERSYS - Battery Model: HX500 or HX540
West (McClellan, CA) - UPS System: Schneider Electric (APC) - Serial #: PD1303150001 - Battery Qty (each): 36 (9 Strings of 4 batteries) - Battery Manufacturer: APC - Battery Model: SYBT9-B4


.

Update #5 ·

Added: Apr 05, 2016 10:38 am Modified: Jun 09, 2016 2:30 pmTrack Changes

Offerors must acknowledge the amendment via emailed response to Erich.Wieber@deca.mil to be considered for award. 

Amendment 0002:
Amendment issued to add a third UPS system to the acquisition.  DeCA has a second UPS at Fort Lee, VA which requires maintenance and optional battery replacement.

HQ (Ft. Lee, VA) - UPS System: Powerware (Eaton) - Serial #: EB062CAA09 - Battery Qty (each): 40 - Battery Manufacturer: C & D Technologies - Battery Model: LS 12-100 - 80 KVA
*****************************************************
Amendment 0001:
Amendment issued to remove the requirement for OEM maintenance plans. The solicitation now includes a PWS which offerors must respond to and address how they will meet or exceed the requirements listed.


Additionally, an alternate battery model has been approved for the Powerware UPS at DeCA HQ.


Finally, vendors are authorized to quote a maximum annual escalation rate for the battery replacement. In evaluating offers, the Government will determine the total evaluated price by adding the FFP maintenance costs of the base and four option years and then adding the maximum one-time battery replacement price to reach the total evaluated price. For example, if the proposed battery replacement cost were $100 and the maximum annual escalation proposed were 5%, the evaluated price for the battery replacement w ould be $121.55 (5% annual increase applied 4 times).
*****************************************************
Please see the attached RFQ and brand-name justification for batteries.
Two UPS systems require maintenance and optional battery replacement. Base year plus four 1-year option periods.


HQ (Ft. Lee, VA) - UPS System: Powerware (Eaton) - Serial #: EW062ZXX03 -
Battery Qty (each): 160 - Battery Manufacturer: ENERSYS - Battery Model: HX500 or HX540
West (McClellan, CA) - UPS System: Schneider Electric (APC) - Serial #: PD1303150001 - Battery Qty (each): 36 (9 Strings of 4 batteries) - Battery Manufacturer: APC - Battery Model: SYBT9-B4


 

Update #4 ·

Offerors must acknowledge the amendment via emailed response to Erich.Wieber@deca.mil to be considered for award.
Amendment 0001:
Amendment issued to remove the requirement for OEM maintenance plans. The solicitation now includes a PWS which offerors must respond to and address how they will meet or exceed the requirements listed.


Additionally, an alternate battery model has been approved for the Powerware UPS at DeCA HQ.


Finally, vendors are authorized to quote a maximum annual escalation rate for the battery replacement. In evaluating offers, the Government will determine the total evaluated price by adding the FFP maintenance costs of the base and four option years and then adding the maximum one-time battery replacement price to reach the total evaluated price. For example, if the proposed battery replacement cost were $100 and the maximum annual escalation proposed were 5%, the evaluated price for the battery replacement w ould be $121.55 (5% annual increase applied 4 times).
*****************************************************
Please see the attached RFQ and brand-name justification for batteries.
Two UPS systems require maintenance and optional battery replacement. Base year plus four 1-year option periods.


HQ (Ft. Lee, VA) - UPS System: Powerware (Eaton) - Serial #: EW062ZXX03 -
Battery Qty (each): 160 - Battery Manufacturer: ENERSYS - Battery Model: HX500 or HX540
West (McClellan, CA) - UPS System: Schneider Electric (APC) - Serial #: PD1303150001 - Battery Qty (each): 36 (9 Strings of 4 batteries) - Battery Manufacturer: APC - Battery Model: SYBT9-B4


.

Update #3 ·

Added: Apr 05, 2016 10:38 am Modified: May 10, 2016 10:39 amTrack Changes

Offerors must acknowledge the amendment via emailed response to Erich.Wieber@deca.mil to be considered for award. 

Amendment 0001:
Amendment issued to remove the requirement for OEM maintenance plans. The solicitation now includes a PWS which offerors must respond to and address how they will meet or exceed the requirements listed.


Additionally, an alternate battery model has been approved for the Powerware UPS at DeCA HQ.


Finally, vendors are authorized to quote a maximum annual escalation rate for the battery replacement. In evaluating offers, the Government will determine the total evaluated price by adding the FFP maintenance costs of the base and four option years and then adding the maximum one-time battery replacement price to reach the total evaluated price. For example, if the proposed battery replacement cost were $100 and the maximum annual escalation proposed were 5%, the evaluated price for the battery replacement w ould be $121.55 (5% annual increase applied 4 times).
*****************************************************
Please see the attached RFQ and brand-name justification for batteries.
Two UPS systems require maintenance and optional battery replacement. Base year plus four 1-year option periods.


HQ (Ft. Lee, VA) - UPS System: Powerware (Eaton) - Serial #: EW062ZXX03 -
Battery Qty (each): 160 - Battery Manufacturer: ENERSYS - Battery Model: HX500 or HX540
West (McClellan, CA) - UPS System: Schneider Electric (APC) - Serial #: PD1303150001 - Battery Qty (each): 36 (9 Strings of 4 batteries) - Battery Manufacturer: APC - Battery Model: SYBT9-B4


 

Update #2 ·

Please see the attached RFQ and brand-name justification.
Two UPS systems require maintenance and optional battery replacement. Base year plus four 1-year option periods.
HQ (Ft. Lee, VA) - UPS System: Powerware (Eaton) - Serial #: EW062ZXX03 - Maintenance Plan: PA81NEDX
Battery Qty (each): 160 - Battery Manufacturer: ENERSYS - Battery Model: HX500

West (McClellan, CA) - UPS System: Schneider Electric (APC) - Serial #: PD1303150001 - Maintenance Plan: WADVULTRA-PX-41
Battery Qty (each): 36 (9 Strings of 4 batteries) - Battery Manufacturer: APC - Battery Model: SYBT9-B4

.

Update #1 ·

Added: Apr 05, 2016 10:38 am Please see the attached RFQ and brand-name justification.
Two UPS systems require maintenance and optional battery replacement. Base year plus four 1-year option periods.

HQ (Ft. Lee, VA) - UPS System: Powerware (Eaton) - Serial #: EW062ZXX03 - Maintenance Plan: PA81NEDX
Battery Qty (each): 160 - Battery Manufacturer: ENERSYS - Battery Model: HX500

West (McClellan, CA) - UPS System: Schneider Electric (APC) - Serial #: PD1303150001 - Maintenance Plan: WADVULTRA-PX-41
Battery Qty (each): 36 (9 Strings of 4 batteries) - Battery Manufacturer: APC - Battery Model: SYBT9-B4

Attachments

Files attached to this notice, newest first
File Type Posted
QA_13JUN.docx DOCX document
HQC007-16-T-0020-0002.pdf PDF
HQC007-16-T-0020-0002_Conformed.pdf PDF
QA_12MAY.docx DOCX document
HQC007-16-T-0020-0001_Conformed_Copy.pdf PDF
HQC007-16-T-0020-0001.pdf PDF
Amended_J A_Redacted.pdf PDF
Delivery_Checklist_DeCA_HQ.docx DOCX document
Delivery_Checklist_DeCA_West.docx DOCX document
QA_05APR.docx DOCX document
JA_Redacted.pdf PDF
HQC007-16-T-0020.pdf PDF
Show all 12

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity