Trail Creek Bridge Construction
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 1204M320Q0001
- Agency
- Region 6 - Pacific Northwest Region Forest Service, Department of Agriculture
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Forest Roads 73 and 52 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This notice solicits proposals for the Trail Creek Bridge Construction project located in the Wallowa-Whitman National Forest in Oregon. The project involves replacing an existing bridge through clearing, excavation, temporary bridging, demolition of the existing culvert and construction of a new bridge including driven H-pile foundations, precast concrete girders, backfill and paving. The U.S. Department of Agriculture Forest Service Pacific Northwest Region will issue the solicitation on or around December 15, 2019, with proposals due June 9, 2020. Proposals will be evaluated based on technical qualifications, past performance, and price. Work is scheduled to begin on May 15, 2020.
The procurement has been set aside 100% for small businesses using NAICS code 237310 for Highway, Street, and Bridge Construction with a size standard of $39.5 million. The estimated value is between $1 million and $5 million. Contractors are advised to visit the project site in fall 2019 due to limited winter access once the solicitation is issued. The government files provide additional details on scope requirements, pre-bid questions and answers, design drawings, and two amendments further clarifying specifications.
Notice text
2 versions
Update #2 · Latest ·
THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT DECEMBER 15, 2019.
PROJECT DESCRIPTION: The Trail Creek Bridge project consists of clearing and grubbing, demolition of existing asphalt, excavation, haul to waste, embankment, placing of Government supplied temporary bridge including supplying and placing temporary abutments and government supplied wood deck planking, demolition of existing large diameter plate CMP culvert, driving of steel H Pile bridge abutment support, cast in place concrete pile caps and wing walls, bulb-tee precast concrete girders, structural backfill, aggregate base course, asphalt concrete paving, bridge railing and guardrail, signage, pavement striping, stream simulation channel grading and restoration, riprap, removal and salvage to Government of concrete barriers, construction signage, and temporary bridge, survey layout and staking, associated erosion and sediment control, associated temporary construction signage, and traffic control.
PROJECT LOCATION: This project is located in the Wallowa-Whitman National Forest on the Whitman Ranger District. From Granite, Oregon, go northerly 11 miles on Forest Roads 73 and 52.
Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around May 15, 2020. Engineering point of contact is Dave Plummer, telephone: (541) 523-1261. Both performance and payment bonds will be required for this project as well as a bid guarantee. Estimated project value is between $1,000,000 and $5,000,000. NAICS 237310 with size standard $39.5 mil. This project is set aside 100% for small business.
NOTE: Contractors are highly encourage to visit the project site this fall as the road is not maintained for winter conditions and access will be limited when the solicitation is issued.
Update #1 ·
THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT DECEMBER 15, 2019.
PROJECT DESCRIPTION: The Trail Creek Bridge project consists of clearing and grubbing, demolition of existing asphalt, excavation, haul to waste, embankment, placing of Government supplied temporary bridge including supplying and placing temporary abutments and government supplied wood deck planking, demolition of existing large diameter plate CMP culvert, driving of steel H Pile bridge abutment support, cast in place concrete pile caps and wing walls, bulb-tee precast concrete girders, structural backfill, aggregate base course, asphalt concrete paving, bridge railing and guardrail, signage, pavement striping, stream simulation channel grading and restoration, riprap, removal and salvage to Government of concrete barriers, construction signage, and temporary bridge, survey layout and staking, associated erosion and sediment control, associated temporary construction signage, and traffic control.
PROJECT LOCATION: This project is located in the Wallowa-Whitman National Forest on the Whitman Ranger District. From Granite, Oregon, go northerly 11 miles on Forest Roads 73 and 52.
Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around May 15, 2020. Engineering point of contact is Dave Plummer, telephone: (541) 523-1261. Both performance and payment bonds will be required for this project as well as a bid guarantee. Estimated project value is between $1,000,000 and $5,000,000. NAICS 237310 with size standard $39.5 mil. This project is set aside 100% for small business.
NOTE: Contractors are highly encourage to visit the project site this fall as the road is not maintained for winter conditions and access will be limited when the solicitation is issued.
Attachments
| File | Type | Posted |
|---|---|---|
| Revised Schedule of Items.pdf | ||
| Amendment 02.pdf | ||
| Bypass Bridge Manufacturers Drawings.pdf | ||
| Amendment 01.pdf | ||
| PL_5200000-0.9_Trail Creek Bridge Signed Drawings.pdf | ||
| Final Trail Creek Solicitation.pdf | ||
| FireProtectionandSuppressionr6_fS_6300_52.pdf | ||
| Trail Creek Supplemental Specifications.pdf | ||
| TC_PRESS_RELEASE_MAP.pdf | ||
| Synopsis_Trail_Creek_Bridge.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Trail Creek Bridge Construction | Award Notice | |
| Trail Creek Bridge Construction | Solicitation | |
| Trail Creek Bridge Construction | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity