Synopsis_Trail_Creek_Bridge.pdf

PDF 6 KB Posted

Attached to
Trail Creek Bridge Construction Federal contract opportunity
Solicitation number
1204M320Q0001
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

This document provides details for the Trail Creek Bridge Construction federal contract opportunity. The U.S. Forest Service, Pacific Northwest Region, will issue a solicitation on or around December 15, 2019 for construction of a bridge project located in the Wallowa-Whitman National Forest in Oregon. The project scope includes clearing, grubbing, demolition, excavation, embankment work, temporary bridge placement, culvert demolition, pile driving, concrete work, precast girders, backfilling, paving, railings, signage, erosion control and traffic management. The estimated value is between $1,000,000 to $5,000,000. The NAICS code is 237310 with a size standard of $39.5 million. This opportunity is 100% set aside for small businesses. Contractors must visit the site in fall 2019 due to limited winter access. The point of contact is Dave Plummer at phone number provided. Performance and payment bonds along with a bid guarantee will be required. Work is estimated to begin on May 15, 2020.

Synopsis

View the file

Other files for this federal contract opportunity

Other files attached to Trail Creek Bridge Construction, newest first.
File Type Posted
Revised Schedule of Items.pdf PDF
Amendment 02.pdf PDF
Amendment 01.pdf PDF
Bypass Bridge Manufacturers Drawings.pdf PDF
Trail Creek Supplemental Specifications.pdf PDF
Final Trail Creek Solicitation.pdf PDF
FireProtectionandSuppressionr6_fS_6300_52.pdf PDF
PL_5200000-0.9_Trail Creek Bridge Signed Drawings.pdf PDF
TC_PRESS_RELEASE_MAP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Synopsis

1204M320Q0001

THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT DECEMBER 15, 2019.

PROJECT DESCRIPTION: The Trail Creek Bridge project consists of clearing and grubbing, demolition of existing asphalt, excavation, haul to waste, embankment, placing of Government supplied temporary bridge including supplying and placing temporary abutments and government supplied wood deck planking, demolition of existing large diameter plate CMP culvert, driving of steel H Pile bridge abutment support, cast in place concrete pile caps and wing walls, bulb-tee precast concrete girders, structural backfill, aggregate base course, asphalt concrete paving, bridge railing and guardrail, signage, pavement striping, stream simulation channel grading and restoration, riprap, removal and salvage to Government of concrete barriers, construction signage, and temporary bridge, survey layout and staking, associated erosion and sediment control, associated temporary construction signage, and traffic control.

PROJECT LOCATION: This project is located in the Wallowa-Whitman National Forest on the Whitman

Ranger District. From Granite, Oregon, go northerly 11 miles on Forest Roads 73 and 52.

Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around May 15, 2020.

Engineering point of contact is Dave Plummer, telephone: (541) 523-1261. Both performance and payment bonds will be required for this project as well as a bid guarantee. Estimated project value is between $1,000,000 and $5,000,000. NAICS 237310 with size standard $39.5 mil. This project is set aside 100% for small business.

NOTE: Contractors are highly encourage to visit the project site this fall as the road is not maintained for winter conditions and access will be limited when the solicitation is issued.