Revised Schedule of Items.pdf
PDF 163 KB Posted
- Attached to
- Trail Creek Bridge Construction Federal contract opportunity
- Solicitation number
- 1204M320Q0001
About this file
This document contains details for a federal construction contract opportunity for the Trail Creek Bridge project. The project involves clearing and grubbing, demolition of existing structures, excavation and embankment work, installation of bridge components including precast concrete girders and bridge railing, asphalt paving, signage and striping. The contract also includes temporary construction components such as a temporary bypass bridge and erosion control measures. The solicitation for the project will be posted on or around December 15, 2019 with an estimated start date of May 15, 2020. The project location is in the Wallowa-Whitman National Forest in Oregon. The estimated value is between $1,000,000 to $5,000,000 and is set aside 100% for small businesses with a size standard of $39.5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 02.pdf | ||
| Amendment 01.pdf | ||
| Bypass Bridge Manufacturers Drawings.pdf | ||
| PL_5200000-0.9_Trail Creek Bridge Signed Drawings.pdf | ||
| Trail Creek Supplemental Specifications.pdf | ||
| Final Trail Creek Solicitation.pdf | ||
| FireProtectionandSuppressionr6_fS_6300_52.pdf | ||
| TC_PRESS_RELEASE_MAP.pdf | ||
| Synopsis_Trail_Creek_Bridge.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 02 1204M320Q0001 Trail Creek Bridge Page 3
REVISED SECTION B- SUPPLIES OR SERVICES AND PRICES
ITEM NO. DESCRIPTION QUANTITY M OF M PAY UNIT UNIT
PRICE
TOTAL
15101 MOBILIZATION ALL LUMP SUM X $__________
15201
CONSTRUCTION SURVEY AND STAKING, METHOD 1,
TOLERANCE A ALL
LUMP SUM
X
15713 SOIL EROSION AND SEDIMENT CONTROL ALL LUMP SUM X
20101 CLEARING AND GRUBBING, METHOD (F) SCATTER ALL LUMP SUM X
20301a REMOVAL OF EXISTING CULVERT, DISPOSAL METHOD (a) ALL LUMP SUM X
20301b
REMOVAL OF CONCRETE BARRIERS, DISPOSAL METHOD
(a) OR (c) AS DESIGNATED ALL
LUMP SUM
X
20304 REMOVAL OF EXISTING ASPHALT, DISPOSAL METHOD (a) OR (c) AS DESIGNATED 1575*
CQ SQUARE
YARD
20401
ROADWAY EXCAVATION AND EMBANKMENT,
COMPACTION PLACEMENT METHOD 1, TOLERANCE
CLASS A 5400*
CQ
CUBIC YARD
20412
SELECT BORROW EXCAVATION, PLACEMENT METHOD 2,
(GOVERNMENT FURNISHED PROPERTY - GFP) 695*
20801 STRUCTURE EXCAVATION, TYPE FOUNDATIONS 200* CQ CUBIC YARD
20803 STRUCTURAL BACKFILL, TYPE WALLS (GFP) 55* CQ CUBIC YARD
25101a
PLACED RIPRAP, CLASS 2, ACCEPTANCE METHOD
PRODUCTION (GFP) 110*
25101b
PLACED RIPRAP, CLASS 6, ACCEPTANCE METHOD
PRODUCTION (GFP) 250*
30201 AGGREGATE BASE, GRADING D, (GFP) 490* CQ CUBIC YARD
40304 ASPHALT CONCRETE, OREGON STATE DOT, type ½” dense level 2 PG 64-28 HMAC 405*
TON
55109 PREBORING 12 CQ EACH
55110 SPLICES 1 EACH
55156 HP 14 X 89, FURNISHED 600*
CQ LINEAR
FOOT
55157 FURNISH PILE DRIVING EQUIPMENT ALL LUMP SUM X
55159 HP 14 X 89 PILE, DRIVEN 12* CQ EACH
55161 HP 14 X 89 PILE TIPS, FURNISHED 12* CQ EACH
55201 STRUCTURAL CONCRETE CLASS A(AE) TYPE (1) 80* CQ CUBIC YARD
55301
PRECAST, PRESTRESSED CONCRETE STRUCTURAL
MEMBERS, 60" DECK BULB-TEE X 108'-8 1/2" 5
EACH
55401 REINFORCING STEEL, GRADE 60 14100* CQ POUNDS
55601
BRIDGE RAILING, 2 TUBE CURB MOUNT, OREGON DOT
BR 206 230*
57101 TEMPORARY BYPASS BRIDGE, (GFP) ALL LUMP SUM X
61702 TERMINAL SECTION, TYPE FLARED, TL-3 4 EACH
61706 STRUCTURE TRANSITION RAILING, THRIE BEAM RAILING 84*
63401
PAVEMENT MARKINGS, TYPE FOGLINE, SOLID, WHITE
(EACH SIDE OF ROAD) 1210*
63501 TEMPORARY TRAFFIC CONTROL ALL LUMP SUM X
64801
PLACED STREAMBED SIMULATION ROCK, BED CLASS 10,
METHOD A 200*
TOTAL ALL ITEMS $
M OF M