Revised Schedule of Items.pdf

PDF 163 KB Posted

Attached to
Trail Creek Bridge Construction Federal contract opportunity
Solicitation number
1204M320Q0001
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

This document contains details for a federal construction contract opportunity for the Trail Creek Bridge project. The project involves clearing and grubbing, demolition of existing structures, excavation and embankment work, installation of bridge components including precast concrete girders and bridge railing, asphalt paving, signage and striping. The contract also includes temporary construction components such as a temporary bypass bridge and erosion control measures. The solicitation for the project will be posted on or around December 15, 2019 with an estimated start date of May 15, 2020. The project location is in the Wallowa-Whitman National Forest in Oregon. The estimated value is between $1,000,000 to $5,000,000 and is set aside 100% for small businesses with a size standard of $39.5 million.

View the file

Other files for this federal contract opportunity

Other files attached to Trail Creek Bridge Construction, newest first.
File Type Posted
Amendment 02.pdf PDF
Amendment 01.pdf PDF
Bypass Bridge Manufacturers Drawings.pdf PDF
PL_5200000-0.9_Trail Creek Bridge Signed Drawings.pdf PDF
Trail Creek Supplemental Specifications.pdf PDF
Final Trail Creek Solicitation.pdf PDF
FireProtectionandSuppressionr6_fS_6300_52.pdf PDF
TC_PRESS_RELEASE_MAP.pdf PDF
Synopsis_Trail_Creek_Bridge.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 02 1204M320Q0001 Trail Creek Bridge Page 3

REVISED SECTION B- SUPPLIES OR SERVICES AND PRICES

ITEM NO. DESCRIPTION QUANTITY M OF M PAY UNIT UNIT

PRICE

TOTAL

15101 MOBILIZATION ALL LUMP SUM X $__________

15201

CONSTRUCTION SURVEY AND STAKING, METHOD 1,

TOLERANCE A ALL

LUMP SUM

X

15713 SOIL EROSION AND SEDIMENT CONTROL ALL LUMP SUM X

20101 CLEARING AND GRUBBING, METHOD (F) SCATTER ALL LUMP SUM X

20301a REMOVAL OF EXISTING CULVERT, DISPOSAL METHOD (a) ALL LUMP SUM X

20301b

REMOVAL OF CONCRETE BARRIERS, DISPOSAL METHOD

(a) OR (c) AS DESIGNATED ALL

LUMP SUM

X

20304 REMOVAL OF EXISTING ASPHALT, DISPOSAL METHOD (a) OR (c) AS DESIGNATED 1575*

CQ SQUARE

YARD

20401

ROADWAY EXCAVATION AND EMBANKMENT,

COMPACTION PLACEMENT METHOD 1, TOLERANCE

CLASS A 5400*

CQ

CUBIC YARD

20412

SELECT BORROW EXCAVATION, PLACEMENT METHOD 2,

(GOVERNMENT FURNISHED PROPERTY - GFP) 695*

20801 STRUCTURE EXCAVATION, TYPE FOUNDATIONS 200* CQ CUBIC YARD

20803 STRUCTURAL BACKFILL, TYPE WALLS (GFP) 55* CQ CUBIC YARD

25101a

PLACED RIPRAP, CLASS 2, ACCEPTANCE METHOD

PRODUCTION (GFP) 110*

25101b

PLACED RIPRAP, CLASS 6, ACCEPTANCE METHOD

PRODUCTION (GFP) 250*

30201 AGGREGATE BASE, GRADING D, (GFP) 490* CQ CUBIC YARD

40304 ASPHALT CONCRETE, OREGON STATE DOT, type ½” dense level 2 PG 64-28 HMAC 405*

TON

55109 PREBORING 12 CQ EACH

55110 SPLICES 1 EACH

55156 HP 14 X 89, FURNISHED 600*

CQ LINEAR

FOOT

55157 FURNISH PILE DRIVING EQUIPMENT ALL LUMP SUM X

55159 HP 14 X 89 PILE, DRIVEN 12* CQ EACH

55161 HP 14 X 89 PILE TIPS, FURNISHED 12* CQ EACH

55201 STRUCTURAL CONCRETE CLASS A(AE) TYPE (1) 80* CQ CUBIC YARD

55301

PRECAST, PRESTRESSED CONCRETE STRUCTURAL

MEMBERS, 60" DECK BULB-TEE X 108'-8 1/2" 5

EACH

55401 REINFORCING STEEL, GRADE 60 14100* CQ POUNDS

55601

BRIDGE RAILING, 2 TUBE CURB MOUNT, OREGON DOT

BR 206 230*

57101 TEMPORARY BYPASS BRIDGE, (GFP) ALL LUMP SUM X

61702 TERMINAL SECTION, TYPE FLARED, TL-3 4 EACH

61706 STRUCTURE TRANSITION RAILING, THRIE BEAM RAILING 84*

63401

PAVEMENT MARKINGS, TYPE FOGLINE, SOLID, WHITE

(EACH SIDE OF ROAD) 1210*

63501 TEMPORARY TRAFFIC CONTROL ALL LUMP SUM X

64801

PLACED STREAMBED SIMULATION ROCK, BED CLASS 10,

METHOD A 200*

TOTAL ALL ITEMS $

M OF M

File details come from the government source that posted it. Updated .