Synopsis_GLEN_18-1101
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- FA255019RA010
- Agency
-
Air Force Space Command
Air Force, Department of Defense
- Responses due
- Set-aside
- HUBZone
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- PSC
- Not on record
- Place of performance
- B600 Schriever AFB, Colorado 80912, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks proposals to replace three mission essential systems at Schriever Air Force Base in Colorado. The 50th Civil Engineer Squadron will replace six transformers and associated equipment in the base's Central Utility Plant, replace eight roof-mounted exhaust fans and seven wall louvers, and upgrade obsolete generator synchronizers, load controllers, and the generator operator's human-machine interface. Proposals are due by September 15, 2019 and the contract award will be set aside for HUBZone small businesses. The work must be completed within 365 days of the notice to proceed and contractors must meet all environmental, safety, security and technical requirements.
The opportunity is set aside for HUBZone small businesses and has a projected award value between $1,000,000 to $5,000,000. The NAICS code is 238210 and PSC code R499. The contract performance period will last 280 days following notice to proceed. Eight exhaust fans and associated equipment will be replaced to address inadequate ventilation issues. Six transformers and a common generator grounding resistor in the transformer yard must also be replaced along with obsolete generator controls.
Notice text
2 versions
Update #2 · Latest ·
This ammendment is to ensure posting due to FBO technical difficulty..
Update #1 ·
The 50th Civil Engineer Squadron is seeking proposals to replace three mission essential systems in building 600, Central Utility Plant (CUP). (1) Replace the existing transformers, CT-1, CT-4, CT-7, CT-2, CT-5, & CT-8, common generator grounding resistor, interconnecting lines, and grounding system in the transformer yard. (2) Replace eight roof mounted exhaust fans connected to seven wall louvers controlled by thermostats located in the power generation system area. (3) Replace the existing obsolete models Woodward synchronizers, load controllers, custom PLC based generator controller, and the generator operator Human Machine Interface (HMI) computer and programming..
Files
| File | Type | Posted |
|---|---|---|
| 0_-_GLEN18-1101_SOW_10July19.pdf | ||
| Synopsis_GLEN_18-1101.pdf | ||
| 2_-_Design_Analysis_Exhaust_Fans_Redacted(RS).pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Solicitation_GLEN_18-1101 | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Repair Electrical Systems | AFLCMC Wright Patterson AFB | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity