This notice is a synopsis for a federal contract opportunity to replace three mission essential systems at Schriever Air Force Base in Colorado. The 50th Civil Engineer Squadron seeks to award a contract between $1,000,000 and $5,000,000 for replacing transformers and associated equipment in the base's Central Utility Plant, replacing exhaust fans and louvers, and upgrading generator controls including synchronizers, load controllers, and the generator operator's human-machine interface. The solicitation will be available on August 29, 2019 on FBO.gov. Proposals will be accepted until September 15, 2019. An in-person site visit will also be scheduled. The contract would have a performance period of 280 days following notice to proceed. This opportunity is set aside for HUBZone small businesses.
synopsis
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0_-_GLEN18-1101_SOW_10July19.pdf | ||
| 2_-_Design_Analysis_Exhaust_Fans_Redacted(RS).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CY20 CTO B600 Electrical & HVAC Upgrade 7-30-19
This notice is posted in accordance with FAR 5.2.
This ACQUISITION is set aside for a HUBZone Small Business.
The NAICS code is 238210 and the SBA Size Standard is $15M.
In accordance with FAR 4.1102 and DFAR 252.204-7004, Alternate A, System for Award
Management (SAM); the contractor must be registered in SAM prior to award. Offerors may obtain information on registration at: https://www.sam.gov.
This is a new "repair by replacement" requirement to replace three mission essential systems in building 600, Central Utility Plant (CUP). (1) Replace the existing transformers, CT-1, CT-4, CT-7, CT-2, CT-5, & CT-8,common generator grounding resistor, interconnecting lines, and grounding system in the transformeryard. (2) Replace eight roof mounted exhaust fans connected to seven wall louvers controlled by thermostats located in the power generation system area. (3)
Replace the existing obsolete models Woodward synchronizers, load controllers, custom PLC based generator controller, and the generator operator Human Machine Interface (HMI) computer and programming. See Statement of Work (SOW) under tab (A1) and Authority to
Advertise (ATA) located under tab (A3) in the contract file for a detailed breakdown of the requirement.
The location of this work will be performed at Schriever AFB, Colorado 80912-5006.
The 50th Contracting Squadron intends to award a contract with a 280 day period of performance for this project after issuance of Notice to Proceed.
The estimated magnitude of the entire contract is between $1,000,000.00 and $5,000,000.00.
NOTES:
1. The solicitation with the official specifications will be available on the GPE on or about 29
August 2019 posted at https://www.fbo.gov. AutoCAD drawings will be available after award.
The tentative date for the receipt of proposals is 15 September 2019. A physical site visit for this project will be scheduled for all potential offerors, the time and date is yet to be determined but will be listed in the official solicitation.
Physical copies of the solicitation and all accompanying specifications will not be provided. All documents for this project will be uploaded to https://www.fbo.gov.