SIAD Construction Project - Group A (306, 307, 309, 310)

Award Notice Posted

Solicitation number
W912GY17R0016
Agency
Awarded
to DAE Sung LLC
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
W912GY18C0007 Federal contract award
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

*****ONLY PERFORMANCE AND PAYMENT BONDS ARE REQUIRED FOR THIS SOLICITATION. BID BONDS ARE NOT REQUIRED.*****
*****ALL QUESTIONS NEED TO BE SUBMITTED BY 5PM EST ON AUGUST 7, 2017. NO FURTHER QUESTIONS WILL BE ANSWERED AFTER THIS DATE.*****
Army Contract Command - Warren (ACC-WRN) is soliciting for repairs to Buildings 306, 307, 309, and 310 at SIAD, using a firm fixed price C-Type contract. This action will be an 8(a) set-aside, and competed among all capable 8(a) construction companies. Repairs to these buildings are needed over the next year.

There are many tasks that must be completed for the buildings to be fully repaired. Some of those tasks include: remove and retain termination bar, remove and retain gutters and all downspouts, repair roof along edge of the gutters, re-install roof termination bar, remove all siding material and replace with new siding, install TYVEK moisture barrier to exterior of the building, remove wood bumper system from perimeter of the buildings, remove existing windows and replace with new vinyl windows, install j-channel and trim accessories as needed around doors, install fanfold insulation, provide and install vinyl trim accessories, apply sealant calking as needed, install a tooled expansion joint, fill joints with exterior grade flexible joint fill product, dispose of waste, remove and replace old damaged concrete ramps, remove and replace existing sliding cargo doors, in addition to more tasks associated with each of these.


The Contractor shall provide all labor, materials, equipment, and supervision necessary to complete the work within the Statements of Work (SOW). All work shall be done in a professional workman-like manner and to industrial standards.


.

Update #5 ·

*****ONLY PERFORMANCE AND PAYMENT BONDS ARE REQUIRED FOR THIS SOLICITATION. BID BONDS ARE NOT REQUIRED.*****



*****ALL QUESTIONS NEED TO BE SUBMITTED BY 5PM EST ON AUGUST 7, 2017. NO FURTHER QUESTIONS WILL BE ANSWERED AFTER THIS DATE.***** 



Army Contract Command - Warren (ACC-WRN) is soliciting for repairs to Buildings 306, 307, 309, and 310 at SIAD, using a firm fixed price C-Type contract. This action will be an 8(a) set-aside, and competed among all capable 8(a) construction companies. Repairs to these buildings are needed over the next year.

There are many tasks that must be completed for the buildings to be fully repaired. Some of those tasks include: remove and retain termination bar, remove and retain gutters and all downspouts, repair roof along edge of the gutters, re-install roof termination bar, remove all siding material and replace with new siding, install TYVEK moisture barrier to exterior of the building, remove wood bumper system from perimeter of the buildings, remove existing windows and replace with new vinyl windows, install j-channel and trim accessories as needed around doors, install fanfold insulation, provide and install vinyl trim accessories, apply sealant calking as needed, install a tooled expansion joint, fill joints with exterior grade flexible joint fill product, dispose of waste, remove and replace old damaged concrete ramps, remove and replace existing sliding cargo doors, in addition to more tasks associated with each of these.


The Contractor shall provide all labor, materials, equipment, and supervision necessary to complete the work within the Statements of Work (SOW). All work shall be done in a professional workman-like manner and to industrial standards.


 

Update #4 ·

*****ALL QUESTIONS NEED TO BE SUBMITTED BY 5PM EST ON AUGUST 7, 2017. NO FURTHER QUESTIONS WILL BE ANSWERED AFTER THIS DATE.*****
Army Contract Command - Warren (ACC-WRN) is soliciting for repairs to Buildings 306, 307, 309, and 310 at SIAD, using a firm fixed price C-Type contract. This action will be an 8(a) set-aside, and competed among all capable 8(a) construction companies. Repairs to these buildings are needed over the next year.

There are many tasks that must be completed for the buildings to be fully repaired. Some of those tasks include: remove and retain termination bar, remove and retain gutters and all downspouts, repair roof along edge of the gutters, re-install roof termination bar, remove all siding material and replace with new siding, install TYVEK moisture barrier to exterior of the building, remove wood bumper system from perimeter of the buildings, remove existing windows and replace with new vinyl windows, install j-channel and trim accessories as needed around doors, install fanfold insulation, provide and install vinyl trim accessories, apply sealant calking as needed, install a tooled expansion joint, fill joints with exterior grade flexible joint fill product, dispose of waste, remove and replace old damaged concrete ramps, remove and replace existing sliding cargo doors, in addition to more tasks associated with each of these.


The Contractor shall provide all labor, materials, equipment, and supervision necessary to complete the work within the Statements of Work (SOW). All work shall be done in a professional workman-like manner and to industrial standards.


.

Update #3 ·

*****ALL QUESTIONS NEED TO BE SUBMITTED BY 5PM EST ON AUGUST 7, 2017. NO FURTHER QUESTIONS WILL BE ANSWERED AFTER THIS DATE.***** 



Army Contract Command - Warren (ACC-WRN) is soliciting for repairs to Buildings 306, 307, 309, and 310 at SIAD, using a firm fixed price C-Type contract. This action will be an 8(a) set-aside, and competed among all capable 8(a) construction companies. Repairs to these buildings are needed over the next year.

There are many tasks that must be completed for the buildings to be fully repaired. Some of those tasks include: remove and retain termination bar, remove and retain gutters and all downspouts, repair roof along edge of the gutters, re-install roof termination bar, remove all siding material and replace with new siding, install TYVEK moisture barrier to exterior of the building, remove wood bumper system from perimeter of the buildings, remove existing windows and replace with new vinyl windows, install j-channel and trim accessories as needed around doors, install fanfold insulation, provide and install vinyl trim accessories, apply sealant calking as needed, install a tooled expansion joint, fill joints with exterior grade flexible joint fill product, dispose of waste, remove and replace old damaged concrete ramps, remove and replace existing sliding cargo doors, in addition to more tasks associated with each of these.


The Contractor shall provide all labor, materials, equipment, and supervision necessary to complete the work within the Statements of Work (SOW). All work shall be done in a professional workman-like manner and to industrial standards.


 

Update #2 ·

Army Contract Command - Warren (ACC-WRN) is soliciting for repairs to Buildings 306, 307, 309, and 310 at SIAD, using a firm fixed price C-Type contract. This action will be an 8(a) set-aside, and competed among all capable 8(a) construction companies. Repairs to these buildings are needed over the next year.

There are many tasks that must be completed for the buildings to be fully repaired. Some of those tasks include: remove and retain termination bar, remove and retain gutters and all downspouts, repair roof along edge of the gutters, re-install roof termination bar, remove all siding material and replace with new siding, install TYVEK moisture barrier to exterior of the building, remove wood bumper system from perimeter of the buildings, remove existing windows and replace with new vinyl windows, install j-channel and trim accessories as needed around doors, install fanfold insulation, provide and install vinyl trim accessories, apply sealant calking as needed, install a tooled expansion joint, fill joints with exterior grade flexible joint fill product, dispose of waste, remove and replace old damaged concrete ramps, remove and replace existing sliding cargo doors, in addition to more tasks associated with each of these.


The Contractor shall provide all labor, materials, equipment, and supervision necessary to complete the work within the Statements of Work (SOW). All work shall be done in a professional workman-like manner and to industrial standards.


.

Update #1 ·

Army Contract Command - Warren (ACC-WRN) is soliciting for repairs to Buildings 306, 307, 309, and 310 at SIAD, using a firm fixed price C-Type contract. This action will be an 8(a) set-aside, and competed among all capable 8(a) construction companies. Repairs to these buildings are needed over the next year.

There are many tasks that must be completed for the buildings to be fully repaired. Some of those tasks include: remove and retain termination bar, remove and retain gutters and all downspouts, repair roof along edge of the gutters, re-install roof termination bar, remove all siding material and replace with new siding, install TYVEK moisture barrier to exterior of the building, remove wood bumper system from perimeter of the buildings, remove existing windows and replace with new vinyl windows, install j-channel and trim accessories as needed around doors, install fanfold insulation, provide and install vinyl trim accessories, apply sealant calking as needed, install a tooled expansion joint, fill joints with exterior grade flexible joint fill product, dispose of waste, remove and replace old damaged concrete ramps, remove and replace existing sliding cargo doors, in addition to more tasks associated with each of these.


The Contractor shall provide all labor, materials, equipment, and supervision necessary to complete the work within the Statements of Work (SOW). All work shall be done in a professional workman-like manner and to industrial standards.


 

Files

File Type Posted
W912GY-17-R-0016_0002.pdf PDF
SIAD_Construction_Sign-in_Sheet.xlsx XLSX spreadsheet
Revised-Epoxy_Broadcast_Floor_Coating_system.doc DOC document
Service_Entrance_Conductors_Warehouse_2017-02-16.pdf PDF
Construction_Q&A_-_Group_A.docx DOCX document
W912GY-17-R-0016_0001.pdf PDF
STATEMENT_OF_WORK_001_PR_No._306-17-04575.docx DOCX document
STATEMENT_OF_WORK_002_PR_No._307-17-04576.docx DOCX document
STATEMENT_OF_WORK_004_PR_No._310-17-04579.docx DOCX document
STATEMENT_OF_WORK_003_PR_No._309-17-04578.docx DOCX document
BLDG_309_Power_-_2017-02-22.pdf PDF
Wall_Pipe_Bracing_over_roll-up_doors..pdf PDF
BLDG_307_Post_Truss_Doors.pdf PDF
BLDG_309_Post_Truss_Doors.pdf PDF
Construction_QA.docx DOCX document
Epoxy_Broadcast_Floor_Coating_system.doc DOC document
Bldg._306_Lighting_-_2017-03-09.pdf PDF
BLDG_306_Post_,_truss_and_doors.pdf PDF
End_Wall_Brace_Drawing.pdf PDF
BLDG_310_Doors_and_Post_Truss_Repair.pdf PDF
BLDG_310_Power_-_2017-02-21.pdf PDF
BLDG_307_Lighting_and_Electrical_Layout_-_2017-03-09.pdf PDF
W912GY-17-R-0016.pdf PDF
STATEMENT_OF_WORK_001_PR_No._306-17-04575.docx DOCX document
Wage_Determination_-_Construction_(SIAD).pdf PDF
STATEMENT_OF_WORK_004_PR_No._310-17-04579.docx DOCX document
STATEMENT_OF_WORK_002_PR_No._307-17-04576.docx DOCX document
STATEMENT_OF_WORK_003_PR_No._309-17-04578.docx DOCX document
W912GY-17-R-0016.pdf PDF
Show all 29

Notice history

Notice Type Posted
This notice Latest Award Notice
SIAD Construction Projects - Group A (Buildings 306, 307, 309, and 310) Award Notice
SIAD Construction Project - Group A Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity