W912GY-17-R-0016_0001.pdf

PDF 86 KB Posted

Attached to
SIAD Construction Project - Group A (306, 307, 309, 310)
Solicitation number
W912GY17R0016
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
W912GY-17-R-0016_0002.pdf PDF
Revised-Epoxy_Broadcast_Floor_Coating_system.doc DOC document
SIAD_Construction_Sign-in_Sheet.xlsx XLSX spreadsheet
STATEMENT_OF_WORK_002_PR_No._307-17-04576.docx DOCX document
Service_Entrance_Conductors_Warehouse_2017-02-16.pdf PDF
STATEMENT_OF_WORK_004_PR_No._310-17-04579.docx DOCX document
Construction_Q&A_-_Group_A.docx DOCX document
STATEMENT_OF_WORK_003_PR_No._309-17-04578.docx DOCX document
STATEMENT_OF_WORK_001_PR_No._306-17-04575.docx DOCX document
Construction_QA.docx DOCX document
Bldg._306_Lighting_-_2017-03-09.pdf PDF
BLDG_306_Post_,_truss_and_doors.pdf PDF
Wall_Pipe_Bracing_over_roll-up_doors..pdf PDF
End_Wall_Brace_Drawing.pdf PDF
BLDG_310_Doors_and_Post_Truss_Repair.pdf PDF
BLDG_307_Post_Truss_Doors.pdf PDF
BLDG_309_Power_-_2017-02-22.pdf PDF
BLDG_310_Power_-_2017-02-21.pdf PDF
BLDG_307_Lighting_and_Electrical_Layout_-_2017-03-09.pdf PDF
BLDG_309_Post_Truss_Doors.pdf PDF
Epoxy_Broadcast_Floor_Coating_system.doc DOC document
W912GY-17-R-0016.pdf PDF
STATEMENT_OF_WORK_001_PR_No._306-17-04575.docx DOCX document
STATEMENT_OF_WORK_002_PR_No._307-17-04576.docx DOCX document
STATEMENT_OF_WORK_003_PR_No._309-17-04578.docx DOCX document
W912GY-17-R-0016.pdf PDF
Wage_Determination_-_Construction_(SIAD).pdf PDF
STATEMENT_OF_WORK_004_PR_No._310-17-04579.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 002 to Solicitation W912GY-17-R-0016 is captured in the Summary of Changes page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GY-17-R-0016

X 9B. DATED (SEE ITEM 11)

18-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Aug-2017

CODE

SIERRA ARMY DEPOT

CONTRACTING OFFICE

74 C STREET BUILDING 60

HERLONG CA 96113

W912GY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912GY-17-R-0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 002

Building 306

1. SOW 306 Section 1.3.9 changed from “Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.” to “Government will supply all disposal dumpsters for recyclables and asbestos only. Contractor will coordinate dumpster delivery and removal with the government.”

2. SOW 306 Section 1.3.34 changed to Reserved.

3. SOW 306 Section 1.3.15 changed to Reserved.

4. SOW 306 Section 1.3.24 changed from “Remove existing wood bumpers on the exterior walls. Install a metal stand off guard rail system on all four sides of the building (match system on Bldg. 352).” to

“Remove existing wood bumpers on the exterior walls. Install a metal stand off guard rail system on the

East and West sides of the building.”

Building 307

5. SOW 307 Section 1.3.9 changed from “Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.” to “Government will supply all disposal dumpsters for recyclables and asbestos only. Contractor will coordinate dumpster delivery and removal

6. SOW 307 Section 1.3.34 changed to Reserved.

7. SOW 307 Section 1.3.15 changed from “Install new vinyl windows approx. 5’-0” x 5’-0” into existing openings. New windows shall have mitered j-channels built in, to minimize future maintenance. Frame openings as needed for new windows. Waterproof and flash each window opening.” to “Install new white vinyl, low E glass, sing hung, windows approx. 3’-3.5” x 5’-2.5” into existing openings. New windows shall have mitered j-channels built in, to minimize future maintenance. Frame openings as needed for new windows. Waterproof and flash each window opening.”

Building 309

8. SOW 309 Section 1.3.9 changed from “Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.” to “Government will supply all disposal

W912GY-17-R-0016

dumpsters for recyclables and asbestos only. Contractor will coordinate dumpster delivery and removal

9. SOW 309 Section 1.3.43 changed to Reserved.

10. SOW 309 Section 1.3.15 changed from “Install new vinyl windows approx. 5’-0” x 5’-0” into existing openings as needed for new windows. Waterproof and flash each window opening.” to “Install new white vinyl, low E glass, sing hung, windows approx. 3’-3.5” x 5’-2.5” into existing openings. New windows shall have mitered j-channels built in, to minimize future maintenance. Frame openings as needed for new

11. SOW 309 Section 1.3.24 changed from “Remove existing wood bumpers on the exterior walls. Install a

“Remove existing wood bumpers on the exterior walls. Install a metal stand off guard rail system on the

Building 310

12. SOW 310 Section 1.3.9 changed from “Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.” to “Government will supply all disposal dumpsters for recyclables and asbestos only. Contractor will coordinate dumpster delivery and removal

13. SOW 310 Section 1.3.43 changed to Reserved.

14. SOW 310 Section 1.3.15 changed from “Install new vinyl windows approx. 5’-0” x 5’-0” into existing openings as needed for new windows. Waterproof and flash each window opening.” to “Install new white vinyl, low E glass, sing hung, windows approx. 3’-3.5” x 5’-2.5” into existing openings. New windows shall have mitered j-channels built in, to minimize future maintenance. Frame openings as needed for new

15. SOW 310 Section 1.3.24 changed from “Remove existing wood bumpers on the exterior walls. Install a

“Remove existing wood bumpers on the exterior walls. Install a metal stand off guard rail system on the

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 17-Aug-2017 12:00 PM to 28-Aug-2017 12:00 AM.

The performance payment bonds has changed from Yes to No.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .