SIAD Construction Project - Group A (306, 307, 309, 310)
Solicitation number
W912GY17R0016
Issued by

About this file

306 - Lighting Drawing

View the file

Other files

File Type Posted
W912GY-17-R-0016_0002.pdf PDF
Revised-Epoxy_Broadcast_Floor_Coating_system.doc DOC document
SIAD_Construction_Sign-in_Sheet.xlsx XLSX spreadsheet
STATEMENT_OF_WORK_002_PR_No._307-17-04576.docx DOCX document
Service_Entrance_Conductors_Warehouse_2017-02-16.pdf PDF
STATEMENT_OF_WORK_004_PR_No._310-17-04579.docx DOCX document
Construction_Q&A_-_Group_A.docx DOCX document
W912GY-17-R-0016_0001.pdf PDF
STATEMENT_OF_WORK_003_PR_No._309-17-04578.docx DOCX document
STATEMENT_OF_WORK_001_PR_No._306-17-04575.docx DOCX document
Construction_QA.docx DOCX document
BLDG_306_Post_,_truss_and_doors.pdf PDF
Wall_Pipe_Bracing_over_roll-up_doors..pdf PDF
End_Wall_Brace_Drawing.pdf PDF
BLDG_310_Doors_and_Post_Truss_Repair.pdf PDF
BLDG_307_Post_Truss_Doors.pdf PDF
BLDG_309_Power_-_2017-02-22.pdf PDF
BLDG_310_Power_-_2017-02-21.pdf PDF
BLDG_307_Lighting_and_Electrical_Layout_-_2017-03-09.pdf PDF
BLDG_309_Post_Truss_Doors.pdf PDF
Epoxy_Broadcast_Floor_Coating_system.doc DOC document
W912GY-17-R-0016.pdf PDF
STATEMENT_OF_WORK_001_PR_No._306-17-04575.docx DOCX document
STATEMENT_OF_WORK_002_PR_No._307-17-04576.docx DOCX document
STATEMENT_OF_WORK_003_PR_No._309-17-04578.docx DOCX document
W912GY-17-R-0016.pdf PDF
Wage_Determination_-_Construction_(SIAD).pdf PDF
STATEMENT_OF_WORK_004_PR_No._310-17-04579.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- 8' LED Light Fixture

LEGEND:

- Task Lighting Locations

TYPICAL "TASK" LIGHTING LAYOUT DETAIL:

- Motion Sensor Activated

9' 8-1/4"

"Task" Layout Fixtures

48" to center of fixture from inside edge of post between fixtures

Not A Part

Not A Part

Scale: 1"=40'

20 40 80 120

Herlong California Scale: Date: Drawn By: Sheet:

Plotted Date:

Sierra Army Depot

Lighting Layout Warehouse Upgrade

Project #306-17-_____ Mission

1"=40' 02/13/2017 TLW 1 Of 1

Heather.M.Cowley Typewritten Text DISTRIBUTION A: Approved for public release: distribution unlimited

Heather.M.Cowley Typewritten Text

- MAIN DISTRIBUTION PANEL (MDP)

- SUBPANEL

LEGEND:

Scale: 1"=40'

20 40 80 120

Herlong California Scale: Date: Drawn By: Sheet:

Plotted Date:

Sierra Army Depot

Electric Warehouse Upgrade

Project #306-17-_____ Mission

1"=40' 03/9/2017 TLW 1 Of 1DISTRIBUTION A: Approved for public release: distribution unlimited

File details come from the government source that posted it. Updated .