Replace Automated Temperature Controls B116

Closed Solicitation Posted

Solicitation number
FA449720R0017
Agency
Air Mobility Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
J041 Maint/Repair/Rebuild Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
Place of performance
Dover Afb De 19902 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks to replace automated temperature controls at Building B116 located at Dover Air Force Base in Dover, Delaware. The Department of the Air Force Air Mobility Command requires the contractor to upgrade the facility's HVAC control system panels and components supporting various air handling units, duct heaters, heating and chilled water systems, power monitoring systems, unit heaters, and boiler room components. The contractor must also furnish new variable air volume units to improve the HVAC direct digital control system's remote functionality, reliability, and serviceability for this mission-critical facility. The evaluation criteria will use the Lowest Price Technically Acceptable process. Questions are due by June 5, 2020 and proposals are due by that same date.

The set-aside designation for this opportunity is total small business. The NAICS code is 238210 and PSC code R499. The potential award value is unspecified. The contractor shall have the systems upgrades completed within 180 calendar days of award at the place of performance of Building B116 located at Dover Air Force Base in Dover, Delaware. The contractor must provide all labor, materials, tools, and equipment necessary to complete the project.

Notice text

4 versions

Update #4 · Latest ·

11 June 2020: Clarification response attached.

5 June 2020 Update: Attached amendment to solicitation. Changes made to section M- Evaluation Factors for Award.

24 May 2020 Update: Attached repsonses to questions post site visit. 

The contractor shall provide all labor, materials, tools, and equipment to upgrade facility heating, ventilation, and air conditioning (HVAC) control system panels/components supporting facility air handling units, duct heaters, heating hot water system, chilled water system, power monitoring system, unit heaters, cabinet unit heaters, boiler room components and furnish new variable air volume units. Improvements are intended to increase HVAC Direct Digital Control (DDC) system remote functionality, reliability and serviceability of this mission-critical facility.

Please Note: Face coverings will be required at the site visit in accordance with the state/local guidance.

Update #3 ·

5 June 2020 Update: Attached amendment to solicitation. Changes made to section M- Evaluation Factors for Award.

24 May 2020 Update: Attached repsonses to questions post site visit. 

The contractor shall provide all labor, materials, tools, and equipment to upgrade facility heating, ventilation, and air conditioning (HVAC) control system panels/components supporting facility air handling units, duct heaters, heating hot water system, chilled water system, power monitoring system, unit heaters, cabinet unit heaters, boiler room components and furnish new variable air volume units. Improvements are intended to increase HVAC Direct Digital Control (DDC) system remote functionality, reliability and serviceability of this mission-critical facility.

Please Note: Face coverings will be required at the site visit in accordance with the state/local guidance.

Update #2 ·

24 May 2020 Update: Attached repsonses to questions post site visit. 

The contractor shall provide all labor, materials, tools, and equipment to upgrade facility heating, ventilation, and air conditioning (HVAC) control system panels/components supporting facility air handling units, duct heaters, heating hot water system, chilled water system, power monitoring system, unit heaters, cabinet unit heaters, boiler room components and furnish new variable air volume units. Improvements are intended to increase HVAC Direct Digital Control (DDC) system remote functionality, reliability and serviceability of this mission-critical facility.

Please Note: Face coverings will be required at the site visit in accordance with the state/local guidance.

Update #1 ·

The contractor shall provide all labor, materials, tools, and equipment to upgrade facility heating, ventilation, and air conditioning (HVAC) control system panels/components supporting facility air handling units, duct heaters, heating hot water system, chilled water system, power monitoring system, unit heaters, cabinet unit heaters, boiler room components and furnish new variable air volume units. Improvements are intended to increase HVAC Direct Digital Control (DDC) system remote functionality, reliability and serviceability of this mission-critical facility.

Please Note: Face coverings will be required at the site visit in accordance with the state/local guidance.

Attachments

Show all 11

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Replace Automated Temperature Controls B116 This notice · Latest solicitation Solicitation
Replace Automated Temperature Controls B116 Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity