RECOVERY - Eagle Lake Sewer Ponds

Awarded Award Notice Posted

Solicitation number
AG-9702-S-10-0164
Agency
Operations Center Southwest Economic Recovery Operations, Department of Agriculture
Awarded
to Erick Ammon, Incorporated
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
AG-9702-C-10-0211 Federal contract award
NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Not on record
Place of performance
Lassen National Forest 2550 Riverside Drive Susanville, California 96130, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: May 19, 2010 4:08 pm .

Update #1 ·

Added: Apr 02, 2010 12:08 pm RECOVERY This project is funded by the American Recovery and reinvestment Act of 2009 (ARRA) and is subject to the requirements of the act. Solicitation will be posted at fedbizopps.gov on or about 20 Apr 2010. No paper copies will be sent. Notifications of any changes will be made as modifications to this announcement. To receive an award, vendor must maintain a current registration at www.ccr.gov and meet 8(a) certification eligibility as prescribed in the solicitation.



The Lassen NF is seeking design and construction management services (CMS) to upgrade the existing waste treatment facility by enhancing the biological treatment process and functionality. The current waste discharge permit limits the disposal of treated effluent by evaporation means only not by land application. Therefore, the best biological treatment process and functionality should be reflective in the upgrade design.



The objectives for the upgrade of this treatment facility include:



a. Compliance with State Issued Waste discharge permit

b. Enhancement of Biological Treatment process and functionality

c. Effective communication between project managers

d. Identification and achievement of project goals

e. Planning that maximizes limited construction season

f. Estimate of Construction Project Costs for Alternatives

g. Provide a Schedule of Items.

h. Development of Construction Schedule

i. Construction of new waste system





This acquisition is 100% set-aside as a Competitive 8(a) Acquisition as prescribed in FAR 19.805. This solicitation is limited to eligible 8(a) firms located within the Small Business Administration's (SBA) Sacramento, Fresno, and San Francisco District Offices as required in the SBA's acceptance letter for this project.



This is a Design/Build project and is prepared in accordance with the requirements set forth in FAR 36 and as authorized by section 4105 of the Clinger-Cohen Act and is supplemented with additional information included in the solicitation. The Design-Build process has two distinct phases. The solicitation incorporates both phases.



Phase I is the pre-qualification process, where the Government will select up to THREE contractors on the basis of their qualifications and preliminary proposal(s). ONLY the selected contractors will then qualify for the Phase II process. In Phase II of the procurement procedure Contractors will be given the opportunity to offer their preliminary design and/or technical approach and cost proposals. Final selection and basis for award will be

qualifications, past experience, technical quality, price and other salient factors considered to be the best value to the Government.



Contractors are urged and expected to attend a site visit which will be scheduled when weather permits. The date and time for the visit will be included in the solicitation when posted to this site.



NAICS code: 237110 Magnitude: $1,000,000-$5,000,000

Attachments

Files attached to this notice, newest first
File Type Posted
The Short List.pdf PDF
S-10-0164 Pre-Bid Tour Attentance List.pdf PDF
38_AG_9702_S_10_0164 Amendment 1.pdf PDF
S-10-0164 Attachment 27 Decision Notice and FONSI.pdf PDF
S-10-0164 Attachment 28 Environmental Assessment.pdf PDF
S-10-0164 Attachment 26 Pre-Bid Meeting Minutes.doc DOC document
S-10-0164 Attachment 4 Eagle_Lake_WWTP_1985_engineering drawings.pdf PDF
S-10-0164 Attachment 1 Integrated Design Features - Alternative 1.pdf PDF
S-10-0164 Attachment 10 Eagle_Lake_WWTP_Site_Map.dwg DWG drawing
S-10-0164 Attachment 16 Eagle_Lake_Watershed_Snowpak.pdf PDF
S-10-0164 Attachment 19 lower_pine_creek_snow_survey_data.pdf PDF
S-10-0164 Attachment 22 Eagle Lake WWTP 2009 Wetland Delineation of 40 Acre Federal Parcel.pdf PDF
S-10-0164 Attachment 25 Past Performance Reference Questionnaire 5 Apr 10.doc DOC document
S-10-0164 Attachment 11 Eagle_Lake_WWTP_Site_Map.pdf PDF
S-10-0164 Attachment 7 Eagle_Lake_WWTP_1999_drawings.pdf PDF
S-10-0164 Attachment 3 Eagle_Lake_WWTP_1973_drawings_1-67.pdf PDF
S-10-0164 Attachment 5 Eagle_Lake_WWTP_1993_drawings.pdf PDF
S-10-0164 Attachment 14 Eagle Lake WWTP 2009 Photos.pdf PDF
S-10-0164 Attachment 15 Eagle_Lake_WWTP_Flow_Map.pdf PDF
S-10-0164 Attachment 12 Eagle_Lake_WWTP_Effluent_Sludge_Volume_2008.pdf PDF
38_S10_0164 Eagle Lake project Solicitation.docx DOCX document
S-10-0164 Attachment 13 Eagle Lake WWTP Leak Location Survey and Report.pdf PDF
S-10-0164 Attachment 24 Timber Sale Contract_Sample Wet Weather Haul Agreement.pdf PDF
S-10-0164 Attachment 2 Eagle Lake Sewer Ponds_Identified Alternatives with Maps.pdf PDF
S-10-0164 Attachment 6 Eagle Lake WWTP_1993 Construction Specs.pdf PDF
S-10-0164 Attachment 9 Eagle_Lake_WWTP_Discharge_Permit_1994.pdf PDF
S-10-0164 Attachment 20 upper_pine_creek_snow_survey_data.pdf PDF
S-10-0164 Attachment 21 Eagle Lake WWTP 2009 Draft HydroGeologic Investigation Report.pdf PDF
S-10-0164 Attachment 17 Eagle_Lake_WWTP_Historical_Freeboard.pdf PDF
S-10-0164 Attachment 18 Eagle_Lake_WWTP_Historical_Sewage_Collection.pdf PDF
S-10-0164 Attachment 23 Timber Sale Contract_ Sample 2400-2.pdf PDF
S-10-0164 Attachment 8 Eagle_Lake_WWTP 1999 Construction Specs.pdf PDF
Show all 32

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity