NE FTFW FTNI 205(1), Buffalo Bridge

Awarded Award Notice Posted

Solicitation number
6982AF19B00001
Agency
Federal Highway Administration Department of Transportation
Awarded
to Fuller Construction Holding Company, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
6982AF19C000015 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Fort Niobrara National Wildlife Refuge, Nebraska, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Awarded Vendors: Fuller Construction Co. Inc.. Contract Award Dollar Amount: $321,753.00. Contract Award Date: 2019-04-11.

Update #2 ·

PROJECT NUMBER: NE FTFW FTNI 205(1)


PROJECT NAME: Buffalo Bridge


PROJECT DESCRIPTION:
The project may consist of the following:



Piers: There is spalling between 2" and 6" deep near the waterline on the piers. The height of the spalls appears to be 4' to 5'. The suggested repair is to remove the loose and delaminated concrete at the bottom of the pier walls and patch the areas either with shotcrete or concrete repairs. It may be necessary to install a temporary water diversion at the base of the piers in order to perform the work. This will require an environmental evaluation and may require the need for additional permits and restrictions while working in the stream channel.



Abutments: There are hairline cracks in the bearing seats, backwalls and columns of abutment possibly caused by leaking expansion joints. The suggested repair is to repair or replace the existing expansion joints.



Abutments: There is erosion at the base of west abutment, exposing the columns. The suggested repair includes in the placement of rip‐rap around the base of the west abutment to direct flow and protect against scour. The slab on top of the west abutment is cracked. Since the slab is a structural element, we will analyze the slab to determine what type of repair is necessary to ensure its structural integrity and prepare the necessary repair details.



Concrete deck: There are numerous transverse cracks on underside of deck at 2' to 4' on centers. The suggested repair is to seal concrete deck with epoxy sealer to prevent moisture penetration. There were no photos of the cracking so a sealer may work.



Girders: There is light rust with minor section loss in some areas of steel girders, mostly at the top flange near the east abutment where wetted by expansion joint drainage. The gap between girder and concrete deck is likely caused by rust pack. The steel expansion bearings at the east abutment are off center.



Expansion joints: There is a filled expansion joint at the west (fixed) end and a sliding plate expansion on east end. Suggested repair is to clean and seal joints at the east and west abutments.


SIGNIFICANT QUANTITIES:


Item
Unit Estimated Quantity
Structure Excavation CUYD 40
Soil Erosion Control, Stabilized Construction Exit Each 2
Soil Erosion Control, Filter Bag Each 5
Cofferdams LPSM All
Dewatering LPSM All
Placed Riprap, Method A, Class 6 CUYD 50
Repair Concrete SQYD 65
Seal Concrete Surface SQYD 300
Clean and Reseal Joints LNFT 24
Concrete Color Finish SQYD 90
Expansion Joint Repair LPSM All
Structural Steel, Furnished, Fabricated, And Erected LB 500
Structural Concrete Injection and Crack Repair LNFT 12


ESTIMATED DOLLAR AMOUNT INCLUDING OPTIONS: $200,000 - $400,000


CONSTRUCTION DURATION: Estimated from May 2019 thru June 2019



ADDITIONAL INFORMATION FOR NOTICE


Anticipated advertisement in December 2018


Anticipated bid opening in January 2019


Anticipated Award in January 2019


Anticipated Notice to Proceed in May 2019


This is a total small business set-aside.

.

Update #1 ·

THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.


PROJECT NUMBER: NE FTFW FTNI 205(1)


PROJECT NAME: Buffalo Bridge


PROJECT DESCRIPTION:
The project may consist of the following:



Piers: There is spalling between 2" and 6" deep near the waterline on the piers. The height of the spalls appears to be 4' to 5'. The suggested repair is to remove the loose and delaminated concrete at the bottom of the pier walls and patch the areas either with shotcrete or concrete repairs. It may be necessary to install a temporary water diversion at the base of the piers in order to perform the work. This will require an environmental evaluation and may require the need for additional permits and restrictions while working in the stream channel.



Abutments: There are hairline cracks in the bearing seats, backwalls and columns of abutment possibly caused by leaking expansion joints. The suggested repair is to repair or replace the existing expansion joints.



Abutments: There is erosion at the base of west abutment, exposing the columns. The suggested repair includes in the placement of rip‐rap around the base of the west abutment to direct flow and protect against scour. The slab on top of the west abutment is cracked. Since the slab is a structural element, we will analyze the slab to determine what type of repair is necessary to ensure its structural integrity and prepare the necessary repair details.



Concrete deck: There are numerous transverse cracks on underside of deck at 2' to 4' on centers. The suggested repair is to seal concrete deck with epoxy sealer to prevent moisture penetration. There were no photos of the cracking so a sealer may work.



Girders: There is light rust with minor section loss in some areas of steel girders, mostly at the top flange near the east abutment where wetted by expansion joint drainage. The gap between girder and concrete deck is likely caused by rust pack. The steel expansion bearings at the east abutment are off center.



Expansion joints: There is a filled expansion joint at the west (fixed) end and a sliding plate expansion on east end. Suggested repair is to clean and seal joints at the east and west abutments.


SIGNIFICANT QUANTITIES:


Item
Unit Estimated Quantity
Structure Excavation CUYD 40
Soil Erosion Control, Stabilized Construction Exit Each 2
Soil Erosion Control, Filter Bag Each 5
Cofferdams LPSM All
Dewatering LPSM All
Placed Riprap, Method A, Class 6 CUYD 50
Repair Concrete SQYD 65
Seal Concrete Surface SQYD 300
Clean and Reseal Joints LNFT 24
Concrete Color Finish SQYD 90
Expansion Joint Repair LPSM All
Structural Steel, Furnished, Fabricated, And Erected LB 500
Structural Concrete Injection and Crack Repair LNFT 12


ESTIMATED DOLLAR AMOUNT INCLUDING OPTIONS: $200,000 - $400,000


CONSTRUCTION DURATION: Estimated from May 2019 thru June 2019



ADDITIONAL INFORMATION FOR NOTICE


Anticipated advertisement in December 2018


Anticipated bid opening in January 2019


Anticipated Award in January 2019


Anticipated Notice to Proceed in May 2019


This is a total small business set-aside.

.

Attachments

Files attached to this notice, newest first
File Type Posted
Bid_Tabs.pdf PDF
Bid_Opening_Summary_NE_FTFW_FTNI_205(1).pdf PDF
QnA_3.19.19.pdf PDF
Buffalo_Bridge_Inspection_Report_2016.pdf PDF
NE_FTFW_FTNI_205(1)_Signed.pdf PDF
6982AF19B000001.pdf PDF