NE_FTFW_FTNI_205(1)_Signed.pdf

PDF 2 MB Posted

Attached to
NE FTFW FTNI 205(1), Buffalo Bridge Federal contract opportunity
Solicitation number
6982AF19B00001
Issued by
Department of Transportation Federal Highway Administration

About this file

Plans

View the file

Other files for this federal contract opportunity

Other files attached to NE FTFW FTNI 205(1), Buffalo Bridge, newest first.
File Type Posted
Bid_Tabs.pdf PDF
Bid_Opening_Summary_NE_FTFW_FTNI_205(1).pdf PDF
QnA_3.19.19.pdf PDF
Buffalo_Bridge_Inspection_Report_2016.pdf PDF
6982AF19B000001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NE FTFW FTNI 205{l}

•_lO'fil).

MISSOURI

I - - - - - - - - KANSAS - - - - - - - - --.....:

KEY MAP OF NEBRASKA

TYPE OF CONSTRUCTION:

Bridge repair

U.S. CUSTOMARY DIMENSIONS:

Slopes are expressed as RISE:RUN

SPECIFICATIONS:

"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS

AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14,

U.S. CUSTOMARY UNITS"

CO■■IT■IIIT TO EICEWNCI

Know wtiars below.

Call before you dig.

www.a.al1t.c:an1

LE� DESIG l'i:R

CH2M HILL

u.� t-•1�1,11. Wll.ltl,11-'t':

SEHVK.li

U.S. DEPARTMENT OF THE INTERIOR

FISH AND WILDLIFE SERVICE

PLANS FOR PROPOSED

NE FrFW FrNI 205(1)

BUFFALO BRIDGE

FORT NIOBRARA NATIONAL WILDLIFE REFUGE

CHERRY COUNTY

N

I

I • •

,�1,' ::I I ; I

I I

I

I

LENGTH 0.05 miles

Begin Project

- ,, j NE FTFW FTNI 205(1)

I

I

,,,--:::::::;::ot,,, ,:

•••• ---�,;, /(1,,_ ••

I I /

I

,, -1

End Project ,, ', NE FTFW FTNI 205(1)

, , ,, --" \ , t -•1--

I I

I )1---... I , __ I

Rd _,. _ - -l C. --1 1 ) - \/ coun� - -

/ -- \,._ _ I "- -. I ----

I � - .. ---r ,\

_,,._ - - - -A,.

r--

' --�1 I ',, I / I / \ I \

I \ I \

\ I \ I I \ \ ,- - -· I \

0.5 1

Scale in Miles

SHEET

A1

�-A3 M

B1

S1-SS

STATE PROJECT

NE NE FrFW FrNI 205(1)

INDEX TO SHEETS

DESCRIPTION

TITLE SHEET

CONVENTIONJIJ... PLAN SYMBOLS AND ABBREVIATIONS

SITE MAP

SUMM.ARY OF QUANTITIES

BUFFALO BRIDGE SHEETS

PLANS PREPARED BY

FOR

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

DENVER, COLORADO

SHEET

NUMBER

Al

APPR�LU/

-·· -��--.-�c� .- -� - ., . ' . DATE: I 2 5£PI&

EF OF ENGINEERING

TRAL FEDERAL LANDS HIGHWAY DMSION

Sheet and Description

BRIDGE

S2 Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0060 15401-0000 CONTRACTOR TESTING LPSM ALL

A0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0100 15706-2200 SOIL EROSION CONTROL, FILTER

BAG EACH 5 5

A0120 20801-0000 STRUCTURE EXCAVATION CUYD 30 10 40

A0140 20815-0000 COFFERDAMS LPSM ALL

A0160 20820-0000 DEWATERING LPSM ALL

A0180 25101-0600 PLACED RIPRAP, METHOD A,

CLASS 6 CUYD 40 10 50

A0200 55220-0000 REPAIR CONCRETE SQYD 65 65

A0220 55224-0000 SEAL CONCRETE SURFACE SQYD 284 16 300

A0240 55225-0000 CLEAN AND RESEAL JOINTS (EAST

ABUTMENT) LNFT 12 12

A0260 55225-0000 CLEAN AND RESEAL JOINTS (WEST Contract Quantity

ABUTMENT) LNFT 12 12

A0280 55230-0000 CONCRETE COLOR FINISH SQYD 89 1 90

A0300 55236-0000 EXPANSION JOINT REPAIR LPSM ALL

A0320 55502-0000 STRUCTURAL STEEL, FURNISHED, Contract Quantity

FABRICATED, AND ERECTED LB 500 500

A0340 56101-0000 STRUCTURAL CONCRETE INJECTION Contract Quantity

AND CRACK REPAIR LNFT 12 12

A0360 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

ALLOWANCE

Contract Quantity Includes cost of beam seats and bearings.

MileStone: 100% Estimate Date Completed: 09/13/18 Report Date: 09/13/18

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

-S ep

-2

:0

A M

Remarks and/or Determination of Estimated QuantityPay Item Description Unit

Estimated Quantities

C

U se rs \e ki tz m il\

D ow nl oa ds su m m ar y.

xl sm ]S he et

STATE PROJECT

B1NE FTFW FTNI 205(1)NE

SHEET

NUMBER

File details come from the government source that posted it.