Mobile Harbor Marine Lift Boat
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912HN20Q5021
- Agency
-
ENDIST Savannah
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 483212 Inland Water Passenger Transportation
- Place of performance
- Mobile Al Usa
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District Savannah seeks to procure a self-propelled marine lift boat capable of operating in up to 50 feet of water to serve as a stable work platform for drilling crews in Mobile Harbor, Alabama. The vessel must support drilling operations for 28 to 39 days, potentially longer, while transporting personnel and supplies via a supplied crew boat. Quotes are due by June 24, 2020 and will be evaluated based on commercial items and past performance.
This total small business set-aside has a place of performance in Mobile, Alabama. The solicitation incorporates key clauses and seeks a lift vessel, crew boat, and crane capable of lifting 50,000 pounds to support an estimated 28 day drilling mission with potential extension to 39 days. Details include operating in waters up to 50 feet deep to serve as a work platform for drilling depths below that level.
Notice text
The Contractor shall provide a self-propelled lift-vessel capable of operating within 50-feet of water in order to support drilling operations within Mobile Alabama Harbor. The purpose for using a lift-vessel is to provide a safe, stable, work platform for USACE drilling crews while drilling operations are underway. The lift-vessel shall be fully manned and capable of supporting drilling operations within the Mobile Harbor. The estimated number of days to complete the drilling mission, including weather delays, is 28 days; this does not include the time to mobilize the vessel to Mobile Harbor. The number of days could extend to a total of 39 days if the optional CPT borings are executed. The estimated number of days may change depending on customer needs. The Contractor shall also supply a crew boat to transport the drilling crew and any supplemental supplies to and from the lift-vessel; a crane capable of lifting up to 50,000lbs to load and unload drill rig and supplies. The Contractor will supply adequate dock space to load and unload necessary supplies and equipment for use in the proposed contract.
The contractor shall be responsible for securing the drilling rig to the vessel which meets the approval of the Government, if needed. There is to be sufficient room on deck to accommodate 20’ drill string lay-downs during drilling operations; if not, a rod-trough that extends outside of the deck footprint may need to be constructed at the cost of the contractor. The contractor shall provide sufficient working area around the drill rig to allow the crew to safely conduct drilling operations; this may require construction of additional deck space.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Mobile Harbor Marine Lift Boat | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity