Lakota_Bismarck_Lakes_Dredging_Projects_Black_Hills_NF

Awarded Award Notice Posted

Solicitation number
AG-67T0-S-14-0043_Dredging_Project
Agency
Region 2 - Rocky Mountain Region Forest Service, Department of Agriculture
Awarded
to Feller Enterprises, LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-67T0-C-14-0047 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Bismarck Lake Sediment removal T3S, R5E, S22, located along Highway 16A four miles east of Custer SD. Lakota Lake Sediment Removal T2S, R6E, S27, located along Highway 16A eight miles north of Highway 36 near Hermosa SD., South Dakota, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Oct 22, 2014 6:09 pm A best value award was made after evaluation of proposals in accordance with the criteria of the solicitation.  Five proposals were received.

Update #1 ·

Added: Jun 20, 2014 12:38 pm The Black Hills National Forest has a need for sediment removal from the following sites:
•Site One: Remove an estimated 20,000 C.Y. with an option of an additional 5,000 CY of sediment from Bismarck Lake and hauling sediment to nearby disposal sites to be reshaped at a later date. The lake will be drained in late fall of 2014 with work scheduled to start as soon as ground freezes allowing equipment to operate in the lake basin.
•Site Two: Remove an estimated 15,000 C.Y. with an option of an additional 5,000 CY of sediment from Lakota Lake while diverting water through the lake during construction, and hauling sediment to nearby disposal sites to be reshaped at a later date. The lake will be drained in late fall of 2014 with work scheduled to start as soon as ground freezes allowing equipment to operate in the lake basin.
Bonding will be required for the full amount of the contract(s) awarded. Bid bond will be required for the 20 percent of the total project bid on. The anticipated value of both projects will be between $350,000.00 and $700,000.00.

The use of bio-based products is anticipated in the performance of the contract. Information on Bio-based products can be found at: http://sftool.gov/green-products/8/miscellaneous


*To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.


The solicitation will be posted by July 2, 2014.


The conference will be held:
Date: July 9, 2014
Time: 10:00 AM MDT
Location: Bismarck Lake.


It is the contractor's responsibility to familiarize themselves with the normal terrain. You may Google: Black Hills National Forest - for information on roads, terrain, and other pertinent information.
All questions must be submitted in writing to: Brenda Anderson, USDA Forest Service, Northern Tier RMAST, 1019 N Fifth St, Custer SD 57730, Fax to (605) 673-9286, or via email to bjanderson@fs.fed.us. Questions must be received by the end of business on July 10th in order to be considered, any questions received after this date may not be addressed.

Attachments

Files attached to this notice, newest first
File Type Posted
67T0S140043_Amend-onev1.docx DOCX document
SPECIFICATIONS_bismarck 1 .pdf PDF
bismarck_drawings 1 .pdf PDF
drawings_lakota 1 .pdf PDF
SPECIFICATIONS_lakota 1 .pdf PDF
AG67T0S140043-LakeDredgingfinalv1.docx DOCX document

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity