J049--GG100 Heaters
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C24724Q0363
- Agency
- Veterans Integrated Service Network 7 Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Augusta GA 30901
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration is seeking proposals to replace water, pool, and heat exchanger systems at the Charlie Norwood VA Medical Center in Augusta, Georgia under Solicitation #36C24724Q0363. The solicitation requires the contractor to remove and replace two hot water heaters, one pool water heater, two heat exchangers, and related valves and piping. Qualified offerors must have experience performing this type of equipment removal and replacement work and will be evaluated based on their quoted price and other factors. Responses are due by March 25, 2024 at 5:00 PM Eastern Time.
This solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The applicable NAICS code is 238220 and the product service code is J049. The estimated value of the contract is between $100,000 and $250,000, and the work must be completed within 98 days of award at the Augusta, Georgia location.
Notice text
2 versions
Update #2 · Latest ·
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the
offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not,
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter
or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to
the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print)
(Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign)
(Signature of Contracting Officer)
1
6
0001
3/20/2024
509-24-2-5102-0226
Department of Veterans Affairs
Ralph H. Johnson VA Medical Center
109 Bee Street
Charleston SC 29403-5799
Department of Veterans Affairs
Ralph H. Johnson VA Medical Center
109 Bee Street
Charleston SC 29403-5799
To all Offerors/Bidders
36C24724Q0363
03-14-2024
X
X
X
X
1
SUBJECT: WATER/POOL/HEAT EXCHANGER REPLACEMENT
The purpose of amendment 0001 is to post Vendor RFI's.
1. See Vendor RFI's on Continuation Page.
2. See "Statement of Work r1".
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
David Parente
Contracting Officer
CONTINUATION PAGE
VENDOR REQUEST FOR INFORMATION (RFI)
36C24724Q0363 GG100 Heaters
The RFP references (4) control valves but on the job walk we saw a total of (7) control valves between the heat exchangers and the water heaters... the job walk representative said he thought the (4) CV's was a typo and that all of them should be changed out. Is this correct? Yes, needs to be 7 control valves. Statement of work has been revised, See Statement of Work r1 .
Â
Can you provide a spec for all equipment, valves, piping material, gaskets, etc. so that we know what to price? If the vendor goes back with the same style valves (150psi), piping material, and gaskets for steam valves (150psi)and made in the USA is suitable.
Is installing new insulation included in our scope? If so, could you provide your insulation spec for this service? New insulation should be including because the system is currently insulated.
The scope document references "various lengths of pipe." but is not clear as to what piping to actually replace. Can you provide a more clear scope as to what gets replaced so that we can estimate more accurately? The piping that needs to be replace is from the header valves to the equipment.
Hours of operation are 7-3:30, but will it be possible to work 7-5:30?
Yes, these hours of operations is correct and if would be possible to work until 5:30 as long as it schedule 2 to 3 weeks in advance.
Which (5) gate valves are being replaced?
On the heat exchangers. This was pointed out in the walk thru.
Which (2) Y-strainers are being replaced?
On the heat exchangers. This was pointed out in the walk thru.
Which (4) Control valves are being replaced?
On the heat exchangers and heaters. This was pointed out in the walk thru.
Can we reuse all other fully functional valves, fittings, steam traps, etc..?
No, old or refurbish material. New and American made material.
How far back does the VA want to replace the insulation?
Replace the insulation you remove piping, exchangers, and etc.
What type and thickness insulation is needed on the new HX, and what type of finish is desired? (paper back, canvas with mastic, aluminum jacket)
Going back with the same style insulation that s currently onsite but new. 1 to 1-1/2 Fiberglass Pipe Insulation tube style.
STATEMENT OF WORK
Charlie Norwood VA Medical Center (CNVAMC)
Augusta, Georgia
WATER/POOL/HEAT EXCHANGER REPLACEMENT
1. General
1.1. Services:
The contractor shall provide replacement services for GG100-110 water/pool/heat exchanger. The contractor shall remove (2) existing AERCO Hot water heaters, (1) AERCO Pool water heater, (2) Heat Exchangers, (5) Gate valves, (2) Y-strainers, (7) Control valves and various lengths of piping located at the Charlie Norwood VA Medical Center, 1 Freedom Way, Augusta GA 30901 (CNVAMC) (Uptown).
1.2 Place Performance:
Charlie Norwood VA Medical Center
1 Freedom Way
Augusta, GA 30901
1.3 Background:
Age of the existing equipment have exceeded their life expectancy. The necessity of these water heater(s), pool heater and heat exchanger(s) provide hot water to over 700,000 sq ft of building with over 5,000 points of water at 110 degrees, maintains a 60,000 gallon pool at 96 degrees and returns condensate back into the system for energy efficiency.
2. Hours of Operation
2.1. Business Hours
7:00am 3:30pm, Monday Friday, excluding Federal Holidays. If work is needed after hours the contractor shall provide a 2week notice. This will allow engineering to inform the facility and make the necessary adjustments.
Federal Holidays
New Year s Day January 1st
Martin Luther King s Birthday 3rd Monday in January
President s Day 3rd Monday in February
Memorial Day Last Monday in May
Juneteenth June 19th
Independence Day July 4th
Labor Day 1st Monday in September
Columbus Day 2nd Monday in October
Veteran s Day November 11th
Thanksgiving Day Last Thursday in November
Christmas Day December 25th
2.1.2. Work schedule
The Contractor shall complete the repairs within 98 days after award of the contract and work within the set times annotated on Paragraph 2. Hours of Operation (2.1)
3. Contractors Responsibilities
3.1. The contractor shall remove (2) AERCO hot water heaters, (1) AERCO Pool Heater, (2) Heat Exchangers and various piping associated and dispose of materials. Removal and installation will be done so to not interrupt hot water service within the building.
3.2. The contractor shall install (2) AERCO hot water heaters, (1) AERCO Pool Heater, (2) Heat Exchangers and piping from the header valves to the equipment associated and dispose of materials.
3.3. Provide all labor, tools, equipment and supervision necessary to remove/(2) AERCO hot water heaters, (1) AERCO Pool Heater, (2) Heat Exchangers and piping from the header valves to the equipment associated and dispose of materials in GG100-110 Uptown VA.
3.4 Must have qualified personnel that have performed Removal of (2) AERCO hot water heaters, (1) AERCO Pool Heater, (2) Heat Exchangers and piping from the header valves to the equipment associated and dispose of materials.
3.5 Must have to perform the task of Removing and replacing (2) AERCO hot water heaters, (1) AERCO Pool Heater, (2) Heat Exchangers and piping from the header valves to the equipment associated and dispose of materials.
3.6 The contractor shall provide all resources necessary to accomplish the deliverables described in the statement of work (SOW), except as may otherwise be specified. Remove and replace existing (2) AERCO hot water heaters, (1) AERCO Pool Heater, (2) Heat Exchangers and piping from the header valves to the equipment associated and dispose of materials. The existing equipment has surpassed its life expectance and is beyond economical repair. Vendor will provide qualified technician(s), to provide, removal/installation and commission all parts needed to replace (2) AERCO hot water heaters, (1) AERCO Pool Heater, (2) Heat Exchangers and piping from the header valves to the equipment.
3.7 Vendor should remove (2) AERCO hot water heaters, (1) AERCO Pool Heater, (2) Heat Exchangers and piping from the header valves to the equipment associated and dispose of materials.
3.8 The contractor shall complete the work required under this SOW in 98 day or less from date after award, unless otherwise directed by the Contracting Officer (CO). If the contractor proposes an earlier completion date, and the Government accepts the contractor s proposal, the contractor s proposed completion date shall prevail. Contractor shall comply with all requirements set forth by National Fire Protection Association (NFPA), Occupational Safety and Health Administration (OSHA) and the Joint Commission, to include NFPA 70: National Electric Code and NFPA 101; Life Safety Code. Further, the contractor shall follow safety precautions including the use of personal protective equipment (i.e. proper attire, masks, gloves, hardhat and eye protection).
3.9 The contractor is to clean up and leave the work area clean daily. There shall be no tools left unattended in the work area.
4. Government Responsibilities
4.1. The Government will provide a list of points of contact and authorized personnel to place requests for delivery and pick up.
4.2. The Government will designate a Contracting Officers Representative (COR) who will furnish technical guidance and advice or generally monitor the work to be performed under this contract.
5. Invoicing
5.1 Payment will be made monthly in arrears upon receipt of a properly prepared detailed invoice and validated by the COR. Invoices must be sent electronically through OB10 Payment System in Austin, Texas.
5.1.1. A properly prepared invoice shall contain:
Invoice Number and Date services were provided
Contractor s Name and Address
Accurate Purchase Order Number
Description of Supply or Service provided
Total amount due
6. Special Contract Requirements
GENERAL
Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.
Update #1 ·
See attached RFQ# 36C24724Q0363 (PDF), and attached Site Visit Map .
Attachments
| File | Type | Posted |
|---|---|---|
| 36C24724Q0363_3.docx | DOCX document | |
| Site Visit Map.pdf | ||
| 36C24724Q0363_2.docx | DOCX document | |
| 36C24724Q0363.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| J049--GG100 Heaters | Award Notice | |
| J049--GG100 Heaters | Solicitation | |
| J049--Pre Solicitation Notice WATER/POOL/HEAT EXCHANGER REPLACEMENT | Pre-Solicitation |