High Flux Isotope Reactor (HFIR) Cold Source Refrigeration System
Closed Solicitation Posted
- Solicitation number
- ColdSourceRefSystem
- Agency
-
Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 325120 Industrial Gas Manufacturing
- PSC
- 4470 Nuclear Reactors
- Place of performance
- Oak Ridge, Tennessee 37830, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Energy is seeking to procure a replacement helium refrigeration system for the High Flux Isotope Reactor (HFIR) cold source at the Oak Ridge National Laboratory. The solicitation requires the seller to provide replacements for the current helium refrigerator, helium compressors, inventory control system, oil removal system, helium transfer module, and the associated control system components. The proposed system must interface with the existing helium storage vessel, liquid nitrogen supply, and distributed control system, and fit within the existing HFIR cold source building. Installation of gas piping will be the responsibility of ORNL. The procurement includes all systems necessary for proper fabrication, installation, testing, operation, and maintenance of the proposed components.
This solicitation is not set-aside, and the government has not identified any potential incumbents or current contractors. The award value or budget range has not been specified. The replacement system must have a refrigeration capacity of 4-4.5 kW to support continued HFIR operation. The place of performance is Oak Ridge, TN 37830, USA. Proposals are due by August 27, 2024.
Notice text
A helium refrigeration system for the Oak Ridge Laboratory's High Flux Isotope Reactor (HFIR). Seller shall provide replacements for the current helium refrigerator, the helium compressors, the inventory control system, the oil removal system, the helium transfer module, and the portion of the control system associated with these components. The helium storage vessel, liquid nitrogen supply, and main components of the DCS are to remain as currently installed. The replacement components noted above must interface with these components. Installation of gas piping will be under the responsibility of ORNL. This procurement is to include all systems requisite for the proper fabrication, installation, testing, operation, and maintenance of the proposed components. The proposed system shall be able to fit within the existing HFIR Cold Source building.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 5W Pulse Tube CryoCooler | Fermi National Accelerator Laboratory | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity