HI STP SR99(1) roosevelt (kipapa stream ) bridge
Award Notice Posted
- Solicitation number
- DTFH6816B00028
- Agency
-
Federal Highway Administration
Department of Transportation
- Awarded
- to Hawaiian Dredging Construction Company, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- DTFH6817C00009 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Mililani, Hawaii 967898, United States
Notice details come from SAM.gov. Updated .
Notice text
THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENATIVE ADVERTISEMENT DATE IS SEPTEMBER 26, 2016. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS.
Project Description:
The Roosevelt (Kipapa Stream) Bridge rehabilitation project is located on Kamehameha Highway (Route 99), southeast of Mililani, at Mile Post 14.4 on the Island of Oahu, Hawaii. The bridge rehabilitation work is to improve structural capacity, seismic retrofit, travel surface widening, and bridge railing replacements, primarily occurring on the bridge superstructure.
This project contains one schedule. Principal work items include 0.12 miles of bridge and approach road survey and staking, lump sum contractor quality control and testing, 897 square yards of bridge and roadway approach asphalt pavement removal, 492 linear foot of sewer line removal, 1,060 linear foot of concrete crack repair, 72,000 pound of reinforcing steel, 39,100 pound of reinforcing steel (uncoated, specialty high strength, corrosion resistant), 8,940 pound of glass fiber reinforcing polymer (GFRP) reinforcing bars, 2080 square yard of concrete overlay (Very Early Strength Latex Modified Concrete), 227 cubic yard of structural concrete, 14,500 square yard of fiber reinforced polymer (FRP), 1050 linear foot of bridge railing, lump sum temporary support structure (work platform scaffolding), 2,405 linear foot of pavement marking (type H), 480 linear foot of 12’ water line (ductile Iron), 64 weeks of traffic control supervisor, Lane Rental (Lump Sum), along with associated erosion control, pavement marking, traffic control, and other incidental work.
On-site project work will be permitted after January 3, 2017. Nighttime construction activities are prohibited from September 15 to December 15. Maximum motorist delays of 10 minutes will be permitted through the project area and a maximum of six weekend, full roadway closures, are permitted specifically for the following items of work:
(a) Removal of the existing bridge deck asphalt overlay material, deck cleaning, and preparation.
(b) Placement of the VESLMC deck overlay and associated preparation work.
(c) Installation of expansion joints and grinding and grooving overlay.
Construction Duration:
Construction is anticipated from late November, 2016 to December, 2017.
The contracting range for this project is $8 to $13 million.