Bid_Tabs.pdf

PDF 20 KB Posted

Attached to
HI STP SR99(1) ROOSEVELT (KIPAPA STREAM ) BRIDGE
Solicitation number
DTFH6816B00028
Issued by

View the file

Other files

File Type Posted
Roosevelt_Bid_Opening_Summary.pdf PDF
Roosevelt_Bridge_Q_A.pdf PDF
A003.pdf PDF
Roosevelt_Bridge_Q_A.pdf PDF
Pre-Bid_Meeting_Sign-In_Sheets.pdf PDF
Pre-Bid_Questions_Roosevelt.pdf PDF
Amendment_A002.pdf PDF
Amendment_A001.pdf PDF
HI_STP_SR99(1)_100per.pdf PDF
RO_100per_Final_Geotechnical_Report_(1).pdf PDF
RO_100per_Final_Hydraulics_Report.pdf PDF
DTFH6816B00028.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T A B U L A T I O N O F B I D S

Schedule A Total of Bid Items: 9,325,980.00$ 60.0% 14,920,000.00$ 64.7% 15,359,275.00$

Project No: Hawaii HI STP SR99(1)

Project Name: ROOSEVELT (KIPAPA STREAM) BRIDGE

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount

15101-0000

Line A0020 ALL LPSM 1,101,336.00$ 1,101,336.00$ 920,451.00$ 1,146,000.00$

15214-1000

Line A0040 ALL LPSM 55,000.00$ 55,000.00$ 68,000.00$ 100,000.00$

15301-0000

Line A0060 ALL LPSM 250,000.00$ 250,000.00$ 431,000.00$ 250,000.00$

15401-0000

Line A0080 ALL LPSM 180,000.00$ 180,000.00$ 383,000.00$ 250,000.00$

15501-0000

Line A0100 ALL LPSM 45,000.00$ 45,000.00$ 69,000.00$ 50,000.00$

15705-0100

Line A0120 650 LNFT 10.00$ 6,500.00$ 52,000.00$ 6,500.00$

15706-1600

Line A0140 2 EACH 6,000.00$ 12,000.00$ 15,000.00$ 20,000.00$

15802-0000

Line A0160 ALL LPSM 115,000.00$ 115,000.00$ 404,000.00$ 120,000.00$

20301-1500

Line A0180 3 EACH 5,000.00$ 15,000.00$ 42,000.00$ 6,000.00$

20302-2200

Line A0200 480 LNFT 110.00$ 52,800.00$ 19,200.00$ 19,200.00$

20304-1000

Line A0220 ALL LPSM 465,000.00$ 465,000.00$ 1,000,000.00$ 1,000,000.00$

20304-7000

Line A0240 ALL LPSM 50,000.00$ 50,000.00$ 15,000.00$ 5,000.00$

20401-0000

Line A0260 270 CUYD 125.00$ 33,750.00$ 52,650.00$ 54,000.00$

25110-0100

Line A0280 18 CUYD 500.00$ 9,000.00$ 22,500.00$ 4,500.00$

30202-2000

Line A0300 375 TON 120.00$ 45,000.00$ 82,500.00$ 26,250.00$

40301-0000

Engineer's Estimate

220.00$ 70.00$

1,250.00$ 250.00$

195.00$ 200.00$

15,000.00$ 5,000.00$

1,000,000.00$ 1,000,000.00$

40.00$ 40.00$

14,000.00$ 2,000.00$

404,000.00$ 120,000.00$

7,500.00$ 10,000.00$

80.00$ 10.00$

69,000.00$ 50,000.00$

100,000.00$

431,000.00$ 250,000.00$ awaiian Dredging Construction Compa Kiewit Infrastructure West Co.

68,000.00$

920,451.00$ 1,146,000.00$

MOBILIZATION

SURVEY AND STAKING, BRIDGE

CONTRACTOR QUALITY CONTROL

ASPHALT CONCRETE PAVEMENT

SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

WATERING FOR DUST CONTROL

REMOVAL OF LIGHT POLE(BRIDGE)

REMOVAL OF SEWERLINE(BRIDGE)

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

REMOVAL OF UTILITY CONDUITS(BRIDGE)

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

ROADWAY EXCAVATION

GROUTED RIPRAP, METHOD A, CLASS 1

ROADWAY AGGREGATE, METHOD 2

CONTRACTOR TESTING

383,000.00$ 250,000.00$

12/14/2016 Page 1 of 5

Project No: Hawaii HI STP SR99(1)

Project Name: ROOSEVELT (KIPAPA STREAM) BRIDGE

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount

Engineer's Estimate awaiian Dredging Construction Compa Kiewit Infrastructure West Co.

Line A0320 135 TON 355.00$ 47,925.00$ 57,375.00$ 48,600.00$

55201-1500

Line A0340 13 CUYD (CQ) 2,200.00$ 28,600.00$ 228,800.00$ 130,000.00$

55201-1500

Line A0360 214 CUYD (CQ) 1,750.00$ 374,500.00$ 2,033,000.00$ 2,889,000.00$

55210-0000

Line A0380 35 CUYD (CQ) 4,500.00$ 157,500.00$ 290,500.00$ 525,000.00$

55220-0000

Line A0400 15 SQYD 2,200.00$ 33,000.00$ 37,500.00$ 37,500.00$

55236-0000

Line A0420 ALL LPSM 40,000.00$ 40,000.00$ 22,000.00$ 45,000.00$

55401-1000

Line A0440 40,085 LB (CQ) 3.40$ 136,289.00$ 232,493.00$ 120,255.00$

55401-4000

Line A0460 39,100 LB (CQ) 8.00$ 312,800.00$ 107,525.00$ 195,500.00$

55506-0000

Line A0480 1 EACH 125,000.00$ 125,000.00$ 77,000.00$ 25,000.00$

55601-0500

Line A0500 1,050 LNFT (CQ) 875.00$ 918,750.00$ 1,050,000.00$ 1,260,000.00$

56101-0000

Line A0520 1,100 LNFT 110.00$ 121,000.00$ 96,800.00$ 27,500.00$

56202-0000

Line A0540 ALL LPSM 500,000.00$ 500,000.00$ 3,000,000.00$ 1,750,000.00$

56901-2000

Line A0560 2,080 SQYD (CQ) 500.00$ 1,040,000.00$ 561,600.00$ 2,400,320.00$

57705-0200

Line A0580 14,500 SQFT 50.00$ 725,000.00$ 565,500.00$ 870,000.00$

58401-0000

Line A0600 8,940 LB (CQ) 12.00$ 107,280.00$ 75,096.00$ 178,800.00$

60409-0000

Line A0620 11 EACH 3,000.00$ 33,000.00$ 55,000.00$ 55,000.00$ 5,000.00$ 5,000.00$

8.40$ 20.00$

39.00$ 60.00$

270.00$ 1,154.00$

3,000,000.00$ 1,750,000.00$

88.00$ 25.00$

1,000.00$ 1,200.00$

77,000.00$ 25,000.00$

2.75$ 5.00$

5.80$ 3.00$

22,000.00$ 45,000.00$

2,500.00$ 2,500.00$

8,300.00$ 15,000.00$

9,500.00$ 13,500.00$

17,600.00$ 10,000.00$

425.00$ 360.00$

STRUCTURAL CONCRETE, CLASS STATEDOT(CLASS D)

STRUCTURAL CONCRETE, CLASS STATEDOT(CLASS E)

BRIDGE RAILING, CONCRETE

STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR

TEMPORARY SUPPORT STRUCTURE(WORK PLATFORM SCAFFOLDING)

CONCRETE OVERLAY, CLASS VERY EARLY STRENGTH LATEX MODIFIED CONCRETE (VESLMC)

FIBER REINFORCED POLYMER (FRP), STRENGTHENING SYSTEM

PRECAST STRUCTURAL CONCRETE(CLASS D, END POST SLAB PANELS)

REPAIR CONCRETE

EXPANSION JOINT REPAIR

REINFORCING STEEL

REINFORCING STEEL, UNCOATED, SPECIALTY HIGH-STRENGTH, CORROSION RESISTANT

MISCELLANEOUS STEEL(CABLE RESTRAINERS)

GLASS FIBER REINFORCED POLYMER (GFRP) REINFORCING BARS

INLET TOP, METAL FRAME AND GRATE

12/14/2016 Page 2 of 5

Project No: Hawaii HI STP SR99(1)

Project Name: ROOSEVELT (KIPAPA STREAM) BRIDGE

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount

Engineer's Estimate awaiian Dredging Construction Compa Kiewit Infrastructure West Co.

60801-0400

Line A0640 40 SQYD 125.00$ 5,000.00$ 19,200.00$ 24,000.00$

61102-3750

Line A0660 480 LNFT 500.00$ 240,000.00$ 528,000.00$ 432,000.00$

61104-0200

Line A0680 1 EACH 1,000.00$ 1,000.00$ 4,000.00$ 1,400.00$

61114-1000

Line A0700 1 EACH 1,000.00$ 1,000.00$ 2,000.00$ 2,400.00$

61701-2100

Line A0720 50 LNFT 120.00$ 6,000.00$ 35,000.00$ 3,500.00$

61707-0000

Line A0740 100 LNFT (CQ) 300.00$ 30,000.00$ 40,000.00$ 40,000.00$

62201-0200

Line A0760 20 HOUR 150.00$ 3,000.00$ 2,840.00$ 3,000.00$

62201-0900

Line A0780 20 HOUR 180.00$ 3,600.00$ 3,280.00$ 3,600.00$

62201-3000

Line A0800 20 HOUR 275.00$ 5,500.00$ 6,800.00$ 5,500.00$

62301-0000

Line A0820 20 HOUR 75.00$ 1,500.00$ 1,760.00$ 1,600.00$

62302-1000

Line A0840 80 HOUR 225.00$ 18,000.00$ 13,840.00$ 18,000.00$

62302-1100

Line A0860 80 HOUR 275.00$ 22,000.00$ 17,920.00$ 22,000.00$

62510-1000

Line A0880 0.1 ACRE 25,000.00$ 2,500.00$ 1,200.00$ 200.00$

62515-1000

Line A0900 0.1 ACRE 10,000.00$ 1,000.00$ 1,200.00$ 1,100.00$

62902-1100

Line A0920 0.1 ACRE 40,000.00$ 4,000.00$ 7,000.00$ 2,000.00$

63301-0000

70,000.00$ 20,000.00$

12,000.00$ 11,000.00$

12,000.00$ 2,000.00$

224.00$ 275.00$

173.00$ 225.00$

88.00$ 80.00$

340.00$ 275.00$

164.00$ 180.00$

142.00$ 150.00$

400.00$ 400.00$

700.00$ 70.00$

2,000.00$ 2,400.00$

4,000.00$ 1,400.00$

1,100.00$ 900.00$

480.00$ 600.00$

SPECIAL LABOR, HIRED SURVEY SERVICES

SEEDING, DRY METHOD

MULCHING, DRY METHOD

ROLLED EROSION CONTROL PRODUCT, TYPE 4

SIGN SYSTEM

STRUCTURE TRANSITION RAILING

DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY

HYDRAULIC EXCAVATOR

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

PAVED WATERWAY, TYPE 4

12-INCH WATERLINE, DUCTILE IRON

VALVE, AIR RELEASE

WATER SYSTEM ACCESSORY, BEND

GUARDRAIL SYSTEM G9, TYPE 2, CLASS A STEEL POSTS

12/14/2016 Page 3 of 5

Project No: Hawaii HI STP SR99(1)

Project Name: ROOSEVELT (KIPAPA STREAM) BRIDGE

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount

Engineer's Estimate awaiian Dredging Construction Compa Kiewit Infrastructure West Co.

Line A0940 13 EACH 1,000.00$ 13,000.00$ 10,400.00$ 6,500.00$

63401-1500

Line A0960 2,600 LNFT 2.50$ 6,500.00$ 18,200.00$ 10,400.00$

63406-0200

Line A0980 40 EACH 25.00$ 1,000.00$ 520.00$ 200.00$

63501-4000

Line A1000 ALL LPSM 500,000.00$ 500,000.00$ 350,000.00$ 350,000.00$

63502-0600

Line A1020 8 EACH 500.00$ 4,000.00$ 160,000.00$ 3,200.00$

63502-1300

Line A1040 40 EACH 175.00$ 7,000.00$ 120,000.00$ 1,400.00$

63502-2000

Line A1060 5 EACH 15,000.00$ 75,000.00$ 320,000.00$ 125,000.00$

63502-2100

Line A1080 4 EACH 10,000.00$ 40,000.00$ 4,000.00$ 40,000.00$

63503-0400

Line A1100 800 LNFT 125.00$ 100,000.00$ 160,000.00$ 64,000.00$

63503-0700

Line A1120 2,250 LNFT 3.00$ 6,750.00$ 11,250.00$ 11,250.00$

63504-1000

Line A1140 600 SQFT 50.00$ 30,000.00$ 24,000.00$ 24,000.00$

63506-0400

Line A1160 360 HOUR 100.00$ 36,000.00$ 22,500.00$ 18,000.00$

63506-0500

Line A1180 2,000 HOUR 70.00$ 140,000.00$ 280,000.00$ 200,000.00$

63510-0100

Line A1200 64 WEEK 3,500.00$ 224,000.00$ 204,800.00$ 64,000.00$

63610-1600

Line A1220 220 LNFT 80.00$ 17,600.00$ 23,100.00$ 4,400.00$

63610-2800

Line A1240 3,400 LNFT 100.00$ 340,000.00$ 221,000.00$ 119,000.00$

105.00$ 20.00$

3,200.00$ 1,000.00$

140.00$ 100.00$

62.50$ 50.00$

40.00$ 40.00$

5.00$ 5.00$

200.00$ 80.00$

1,000.00$ 10,000.00$

64,000.00$ 25,000.00$

3,000.00$ 35.00$

20,000.00$ 400.00$

350,000.00$ 350,000.00$

13.00$ 5.00$

7.00$ 4.00$

800.00$ 500.00$

TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER

TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

TEMPORARY TRAFFIC CONTROL, POLICE OFFICER

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

RAISED PAVEMENT MARKER, NON-PLOWABLE, BI-DIRECTIONAL REFLECTIVE

TEMPORARY TRAFFIC CONTROL, LANE RENTAL

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN(ELECTRONIC MESSAGE SIGN)

TEMPORARY TRAFFIC CONTROL, CRASH CUSHION

PAVEMENT MARKINGS, TYPE H, SOLID

CONDUIT, 2-INCH, PVC

CONDUIT, 4-INCH, PVC

65.00$ 35.00$

12/14/2016 Page 4 of 5

Project No: Hawaii HI STP SR99(1)

Project Name: ROOSEVELT (KIPAPA STREAM) BRIDGE

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount

Engineer's Estimate awaiian Dredging Construction Compa Kiewit Infrastructure West Co.

63611-0300

Line A1260 800 LNFT 8.00$ 6,400.00$ 960.00$ 2,400.00$

63611-0400

Line A1280 1,600 LNFT 11.00$ 17,600.00$ 3,840.00$ 4,800.00$

63612-0000

Line A1300 4 EACH 30,000.00$ 120,000.00$ 9,200.00$ 2,000.00$

63620-0000

Line A1320 4 EACH 9,000.00$ 36,000.00$ 37,200.00$ 28,000.00$

63621-1000

Line A1340 10 EACH 6,000.00$ 60,000.00$ 39,000.00$ 21,000.00$

63622-0000

Line A1360 650 LNFT 100.00$ 65,000.00$ 149,500.00$ 84,500.00$

POLE

UTILITY BOX, PULLBOX

UTILITY TRENCH

WIRE, ELECTRICAL CONDUCTORS, 10 AWG

WIRE, ELECTRICAL CONDUCTORS, 8 AWG

LUMINAIRE

2.40$ 3.00$

1.20$ 3.00$

9,300.00$ 7,000.00$

2,300.00$ 500.00$

230.00$ 130.00$

3,900.00$ 2,100.00$

12/14/2016 Page 5 of 5