Place of performance
The East Fork Eagle culvert is located on the Eagle/Holy Cross District on the White River National Forest approximately 16.3 miles south of Minturn, CO on National Forest System Road 714. Second phase option Muddy Creek Culvert is located on the Eagle/Holy Cross District approximately 4 mile north of Wolcott, CO. Glenwood Springs, Colorado 81601, United States

Notice details come from SAM.gov. Updated .

Notice text

7 versions

Update #7 · Latest ·

Added: May 05, 2016 3:22 pm Modified: Jun 20, 2016 11:49 amTrack Changes BID PACKAGE SUBMISSION:

Bid Packages MUST be marked AG-82D7-S-16-0007 and submitted in writing and addressed to Lonnie D. Root, Contracting Officer either by email to lroot@fs.fed.us, or hard copy to the address below.

Lonnie D. Root
Contracting Officer
White River National Forest
900 Grand Ave
Glenwood Springs, CO 81601

*******************************************************************
SOLICITATION PERIOD: 05/19/16 - 06/20/16
BID DUE DATE: 06/20/2016 5:00PM MT

*******************************************************************

East Fork Eagle Culvert Replacement with an Optional Second Phase for Muddy Creek Culvert Replacement contingent on funding

Purpose: The intent of the project is to replace undersized culverts on National Forest System Roads with aquatic organism passages for the purposes of habitat restoration, flood capacity and resiliency, road reconstruction, and to upgrade aging infrastructure to current forest standards.

Scope of Work: The work shall consist of what is shown on the plans and stated in the specifications for East Fork Eagle Road and second phase option Muddy Pass/Red Sandstone road. Work includes, but is not limited to: traffic control signs, install stream flow diversion system at existing culvert, remove existing culvert, excavation, construction or placement of footings, construction of stream channel and banks, erect plate box culvert, structural backfill and embankment, surface aggregate placement, seeding, planting, and final site work.


 

Update #6 ·

Added: May 05, 2016 3:22 pm Modified: Jun 17, 2016 3:58 pmTrack Changes BID PACKAGE SUBMISSION:

Bid Packages MUST be marked AG-82D7-S-16-0007 and submitted in writing and addressed to Lonnie D. Root, Contracting Officer either by email to lroot@fs.fed.us, or hard copy to the address below.

Lonnie D. Root
Contracting Officer
White River National Forest
900 Grand Ave
Glenwood Springs, CO 81601

*******************************************************************
SOLICITATION PERIOD: 05/19/16 - 06/20/16
BID DUE DATE: 06/20/2016 5:00am MT

*******************************************************************

East Fork Eagle Culvert Replacement with an Optional Second Phase for Muddy Creek Culvert Replacement contingent on funding

Purpose: The intent of the project is to replace undersized culverts on National Forest System Roads with aquatic organism passages for the purposes of habitat restoration, flood capacity and resiliency, road reconstruction, and to upgrade aging infrastructure to current forest standards.

Scope of Work: The work shall consist of what is shown on the plans and stated in the specifications for East Fork Eagle Road and second phase option Muddy Pass/Red Sandstone road. Work includes, but is not limited to: traffic control signs, install stream flow diversion system at existing culvert, remove existing culvert, excavation, construction or placement of footings, construction of stream channel and banks, erect plate box culvert, structural backfill and embankment, surface aggregate placement, seeding, planting, and final site work.


 

Update #5 ·

Added: May 05, 2016 3:22 pm Modified: Jun 15, 2016 3:50 pmTrack Changes BID PACKAGE SUBMISSION:

Bid Packages MUST be marked AG-82D7-S-16-0010 and submitted in writing and addressed to Lonnie D. Root, Contracting Officer either by email to lroot@fs.fed.us, or hard copy to the address below.

Lonnie D. Root
Contracting Officer
White River National Forest
900 Grand Ave
Glenwood Springs, CO 81601

*******************************************************************
SOLICITATION PERIOD: 05/19/16 - 06/20/16
BID DUE DATE: 06/20/2016 5:00am MT

*******************************************************************

East Fork Eagle Culvert Replacement with an Optional Second Phase for Muddy Creek Culvert Replacement contingent on funding

Purpose: The intent of the project is to replace undersized culverts on National Forest System Roads with aquatic organism passages for the purposes of habitat restoration, flood capacity and resiliency, road reconstruction, and to upgrade aging infrastructure to current forest standards.

Scope of Work: The work shall consist of what is shown on the plans and stated in the specifications for East Fork Eagle Road and second phase option Muddy Pass/Red Sandstone road. Work includes, but is not limited to: traffic control signs, install stream flow diversion system at existing culvert, remove existing culvert, excavation, construction or placement of footings, construction of stream channel and banks, erect plate box culvert, structural backfill and embankment, surface aggregate placement, seeding, planting, and final site work.


 

Update #4 ·

Added: Jun 03, 2016 3:14 pm Modificaiton: 06/03

Includes the following documents:
Corrected SOW Package
Q&A from Pre-Bid Meeting
Davis Bacon Act Wage Determination

Mod also includes Price Range of $200,000 - $350,000 for both projects combined
also includes details on process for completing each phase/project as sited on revised OF1442 AG-82D7-S-16-0007
 
**************************************************************

Update #3 ·

Added: May 24, 2016 1:35 pm PRE-BID & SITE VISIT MEETING

Date/Time:
    June 1st, 2016 10:00am Mountain Standard Time

Location:
    Minturn Ranger District Office
    24747 US Hwy 24
    Minturn, Colorado  81645

Meeting POC:
    Erica Borum
    970-945-3277
    eborum@fs.fed.us

Update #2 ·

Added: May 05, 2016 3:22 pm Modified: May 19, 2016 11:58 amTrack Changes SOLICITATION PERIOD: 05/19/16 - 06/20/16
BID DUE DATE: 06/20/2016 5:00am MT

*******************************************************************

East Fork Eagle Culvert Replacement with an Optional Second Phase for Muddy Creek Culvert Replacement contingent on funding

Purpose: The intent of the project is to replace undersized culverts on National Forest System Roads with aquatic organism passages for the purposes of habitat restoration, flood capacity and resiliency, road reconstruction, and to upgrade aging infrastructure to current forest standards.

Scope of Work: The work shall consist of what is shown on the plans and stated in the specifications for East Fork Eagle Road and second phase option Muddy Pass/Red Sandstone road. Work includes, but is not limited to: traffic control signs, install stream flow diversion system at existing culvert, remove existing culvert, excavation, construction or placement of footings, construction of stream channel and banks, erect plate box culvert, structural backfill and embankment, surface aggregate placement, seeding, planting, and final site work.


 

Update #1 ·

Added: May 05, 2016 3:22 pm East Fork Eagle Culvert Replacement with an Optional Second Phase for Muddy Creek Culvert Replacement contingent on funding

Purpose: The intent of the project is to replace undersized culverts on National Forest System Roads with aquatic organism passages for the purposes of habitat restoration, flood capacity and resiliency, road reconstruction, and to upgrade aging infrastructure to current forest standards.

Scope of Work: The work shall consist of what is shown on the plans and stated in the specifications for East Fork Eagle Road and second phase option Muddy Pass/Red Sandstone road. Work includes, but is not limited to: traffic control signs, install stream flow diversion system at existing culvert, remove existing culvert, excavation, construction or placement of footings, construction of stream channel and banks, erect plate box culvert, structural backfill and embankment, surface aggregate placement, seeding, planting, and final site work.


 

Attachments

Files attached to this notice, newest first
File Type Posted
Culvert_Replacements_Pre-bid.pdf PDF
Revised_AG-82D7-S-16-0007.pdf PDF
11_-_geotech_report.pdf PDF
EFE-Muddy_B-M_Clauses.pdf PDF
davisbacon_CO13_CO23.pdf PDF
EFE_SOI.xls XLS spreadsheet
Muddy_Schedule_of_Items.xls XLS spreadsheet
AG-82D7-S-16-0007_Solicitation.pdf PDF
SectionMEvaluationCriteria.docx DOCX document
MuddyPlansMaps.pdf PDF
EFE_UE-50_Proj_Specials_List.xls XLS spreadsheet
MuddyProj_Specials_List.xls XLS spreadsheet
EFE_UE-50_SOW_Specs_All.pdf PDF
EFE_UE-50_drawings.pdf PDF
Muddy_SOW_Specs_All.pdf PDF
AG-82D7-S-16-0007_Solicitation.pdf PDF
AG-82D7-S-16-0007_PreSolicitation.pdf PDF
Show all 17

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity