Muddy_Schedule_of_Items.xls
XLS spreadsheet 29 KB Posted
- Attached to
- Culvert Replacement Two Phases Federal contract opportunity
- Solicitation number
- AG-82D7-S-16-0007
About this file
Muddy Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 11_-_geotech_report.pdf | ||
| EFE-Muddy_B-M_Clauses.pdf | ||
| davisbacon_CO13_CO23.pdf | ||
| Culvert_Replacements_Pre-bid.pdf | ||
| Revised_AG-82D7-S-16-0007.pdf | ||
| EFE_SOI.xls | XLS spreadsheet | |
| AG-82D7-S-16-0007_Solicitation.pdf | ||
| MuddyPlansMaps.pdf | ||
| SectionMEvaluationCriteria.docx | DOCX document | |
| EFE_UE-50_drawings.pdf | ||
| MuddyProj_Specials_List.xls | XLS spreadsheet | |
| EFE_UE-50_SOW_Specs_All.pdf | ||
| Muddy_SOW_Specs_All.pdf | ||
| AG-82D7-S-16-0007_Solicitation.pdf | ||
| EFE_UE-50_Proj_Specials_List.xls | XLS spreadsheet | |
| AG-82D7-S-16-0007_PreSolicitation.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI-Bid Tab
| SECTION B - SCHEDULE OF ITEMS | ||||||
| Muddy Creek | ||||||
| White River NF Culvert Replacement | ||||||
| Pay Item | Description | Method of | Pay | Estimated | Unit | |
| No. | Measurement | Unit | Quantity | Price | Amount | |
| 15101 | Mobilization | LSQ | LS | 1 | $ | $ |
| 15201 | Construction survey and staking; method I, tolerance A | LSQ | LS | 1 | $ | $ |
| 15713 | Soil erosion and pollution control | LSQ | LS | 1 | $ | $ |
| 20102 | Clearing and grubbing | LSQ | LS | 1 | $ | $ |
| 20305 | Removal of structures and obstructions | LSQ | LS | 1 | $ | $ |
| 20422 | Topsoil (stockpiled) | CQ | CY | 11 | $ | $ |
| 20455 | Embankment construction | CQ | CY | 31 | $ | $ |
| 20801 | Structure excavation | CQ | CY | 305 | $ | $ |
| 20802 | Foundation Fill | CQ | CY | 28 | $ | $ |
| 20803 | Structural backfill | CQ | CY | 272 | $ | $ |
| 30109 | Aggregate surface course, grading F, compaction method B | CQ | CY | 31 | $ | $ |
| 59052 | Precast concrete member, spread footing and stem wall | CQ | FT | 69 | $ | $ |
| 60351 | Prefabricated metal headwalls & wingwalls | CQ | FT | 65.5 | $ | $ |
| 60358 | 17'-9" span, 3'-10" rise, structural plate box culvert | CQ | FT | 34 | $ | $ |
| 61901 | Fence, 4-wire | AQ | FT | 122.4 | $ | $ |
| 61904 | Brace panel | AQ | EA | 4 | $ | $ |
| 61951 | Removal of fence | AQ | FT | 122.4 | $ | $ |
| 62406 | Placing conserved topsoil | CQ | CY | 11 | $ | $ |
| 62502 | Seeding, dry method | CQ | SY | 133 | $ | $ |
| 62901 | Erosion control mat, type 3.B | CQ | SY | 133 | $ | $ |
| 63306 | Object markers, Type III | CQ | EA | 4 | $ | $ |
| 63501 | Temporary traffic control | LSQ | LS | 1 | $ | $ |
| 64867 | Placed streambed simulation rock, bed class 2, method A | CQ | CY | 54 | $ | $ |
| 64868 | Placed streambed channel rock, rock size 1, method A | CQ | CY | 55 | $ | $ |
| TOTAL BID PRICE | $ |