MuddyProj_Specials_List.xls
XLS spreadsheet 39 KB Posted
- Attached to
- Culvert Replacement Two Phases Federal contract opportunity
- Solicitation number
- AG-82D7-S-16-0007
About this file
MUDDY - PROJECT SPECIALS LIST
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 11_-_geotech_report.pdf | ||
| EFE-Muddy_B-M_Clauses.pdf | ||
| davisbacon_CO13_CO23.pdf | ||
| Culvert_Replacements_Pre-bid.pdf | ||
| Revised_AG-82D7-S-16-0007.pdf | ||
| EFE_SOI.xls | XLS spreadsheet | |
| Muddy_Schedule_of_Items.xls | XLS spreadsheet | |
| AG-82D7-S-16-0007_Solicitation.pdf | ||
| SectionMEvaluationCriteria.docx | DOCX document | |
| MuddyPlansMaps.pdf | ||
| EFE_UE-50_SOW_Specs_All.pdf | ||
| EFE_UE-50_drawings.pdf | ||
| EFE_UE-50_Proj_Specials_List.xls | XLS spreadsheet | |
| Muddy_SOW_Specs_All.pdf | ||
| AG-82D7-S-16-0007_Solicitation.pdf | ||
| AG-82D7-S-16-0007_PreSolicitation.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES | ||||
| ON FEDERAL HIGHWAY PROJECTS | ||||
| Specification List | ||||
| Project Name:Muddy Crk Culvert Replacement, White River National Forest | Title | Date Prepared: 5/12 (Latest Revision Date) | ||
| Specification Number: | ||||
| 101 | Terms, Format, and Definitions | 2003 | ||
| FSSS 101 | Terms, Format, and Definitions | 05/12 | 1 | |
| 102 | Bid, Award, and Execution of Contract | 2003 | ||
| FSSS 102 | Bid, Award, and Execution of Contract | 05/12 | 1 | |
| 103 | Scope of Work | 2003 | ||
| FSSS 103 | Scope of Work | 05/12 | 1 | |
| 104 | Control of Work | 2003 | ||
| FSSS 104 | Control of Work | 05/12 | 1 | |
| 105 | Control of Material | 2003 | ||
| FSSS 105 | Control of Material | 05/12 | 1 | |
| 106 | Acceptance of Work | 2003 | ||
| FSSS 106 | Acceptance of Work | 05/12 | 1 | |
| 107 | Legal Relations and Responsibilities to the Public | 2003 | ||
| FSSS 107 | Legal Relations and Responsibilities to the Public | 05/12 | 1 | |
| 108 | Prosecution and Progress | 2003 | ||
| FSSS 108 | Prosecution and Progress | 05/12 | 1 | |
| 109 | Measurement and Payment | 2003 | ||
| FSSS 109 | Measurement and Payment | 05/12 | 1 | |
| 151 | Mobilization | 2003 | ||
| 152 | Construction Survey and Staking | 2003 | ||
| 153 | Contractor Quality Control | 2003 | ||
| FSSS 153 | Contractor Quality Control | 05/12 | 1 | |
| FSSS 154 | Contractor Sampling and Testing | 05/12 | 1 | |
| 155 | Schedules for Construction Contracts | 2003 | ||
| FSSS 155 | Schedules for Construction Contracts | 05/12 | 1 | |
| 156 | Public Traffic | 2003 | ||
| FSSS 156 | Public Traffic | 05/12 | 1 | |
| 157 | Soil Erosion Control | 2003 | ||
| FSSS 157 | Soil Erosion Control | 05/12 | 1 | |
| 201 | Clearing and Grubbing | 2003 | ||
| FSSS 201 | Clearing and Grubbing | 05/12 | 1 | |
| 203 | Removal of Structures and Obstructions | 2003 | ||
| FSSS 203 | Removal of Structures and Obstructions | 05/12 | 1 | |
| 204 | Excavation and Embankment | 2003 | ||
| FSSS 204 | Excavation and Embankment | 05/12 | 1 | |
| 208 | Structure Excavation and Backfill for Selected Major Structures | 2003 | ||
| FSSS 208 | Structure Excavation and Backfill for Selected Major Structures | 05/12 | 1 | |
| 209 | Structure Excavation and Backfill | 2003 | ||
| 301 | Untreated Aggregate Courses | 2003 | ||
| FSSS 301 | Untreated Aggregate Courses | 05/12 | 1 | |
| 552 | Structural Concrete | 2003 | ||
| FSSS 552 | Structural Concrete | 05/12 | 1 | |
| 554 | Reinforcing Steel | 2003 | ||
| FSSS 554 | Reinforcing Steel | 05/12 | 1 | |
| FSSS 590 | Precast Concrete Structures | 05/12 | 1 | |
| 603 | Structural Plate Structures | 2003 | ||
| FSSS 603 | Structural Plate Structures | 05/12 | 1 | |
| 619 | Fences, Gates, and Cattle Guards | 2003 | ||
| 624 | Topsoil | 2003 | ||
| FSSS 624 | Topsoil | 05/12 | 1 | |
| 625 | Turf Establishment | 2003 | ||
| FSSS 625 | Turf Establishment | 05/12 | 1 | |
| 629 | Rolled Erosion Control Products and Cellular Confinement Systems | 2003 | ||
| FSSS 629 | Rolled Erosion Control Products and Cellular Confinement Systems | 05/12 | 1 | |
| 633 | Permanent Traffic Control | 2003 | ||
| 635 | Temporary Traffic Control | 2003 | ||
| FSSS 635 | Temporary Traffic Control | 05/12 | 1 | |
| FSSS 648 | Stream Simulation | 05/12 | 1 | |
| FSSS 703 | Aggregate | 05/12 | 1 | |
| FSSS 704 | Soil | 05/12 | 1 | |
| FSSS 705 | Rock | 05/12 | 1 | |
| FSSS 709 | Reinforcing Steel and Wire Rope | 05/12 | 1 | |
| 712 | Joint Material | 2003 | ||
| FSSS 714 | Geotextile and Geocomposite Drain Material | 05/12 | 1 | |
| FSSS 717 | Structural Metal | 05/12 | 1 | |
| 34 | 26 | |||
| Note: All of the specifications cited are applicable to this project. The Forest Service Supplemental Specifications (FSSS) | ||||
| are included with this solicitation. The other specifications are within the 2003 Standard Specifications for | ||||
| Construction of Roads and Bridges on Federal Highway Projects. Other specifications referred to | ||||
| within these specifications (even though not specifically listed herein) are also fully applicable to this project. |
Page &P of &N