MuddyProj_Specials_List.xls

XLS spreadsheet 39 KB Posted

Attached to
Culvert Replacement Two Phases Federal contract opportunity
Solicitation number
AG-82D7-S-16-0007
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

MUDDY - PROJECT SPECIALS LIST

View the file

Other files for this federal contract opportunity

Other files attached to Culvert Replacement Two Phases, newest first.
File Type Posted
11_-_geotech_report.pdf PDF
EFE-Muddy_B-M_Clauses.pdf PDF
davisbacon_CO13_CO23.pdf PDF
Culvert_Replacements_Pre-bid.pdf PDF
Revised_AG-82D7-S-16-0007.pdf PDF
EFE_SOI.xls XLS spreadsheet
Muddy_Schedule_of_Items.xls XLS spreadsheet
AG-82D7-S-16-0007_Solicitation.pdf PDF
SectionMEvaluationCriteria.docx DOCX document
MuddyPlansMaps.pdf PDF
EFE_UE-50_SOW_Specs_All.pdf PDF
EFE_UE-50_drawings.pdf PDF
EFE_UE-50_Proj_Specials_List.xls XLS spreadsheet
Muddy_SOW_Specs_All.pdf PDF
AG-82D7-S-16-0007_Solicitation.pdf PDF
AG-82D7-S-16-0007_PreSolicitation.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES
ON FEDERAL HIGHWAY PROJECTS
Specification List
Project Name:Muddy Crk Culvert Replacement, White River National ForestTitleDate Prepared: 5/12 (Latest Revision Date)
Specification Number:
101Terms, Format, and Definitions2003
FSSS 101Terms, Format, and Definitions05/121
102Bid, Award, and Execution of Contract2003
FSSS 102Bid, Award, and Execution of Contract05/121
103Scope of Work2003
FSSS 103Scope of Work05/121
104Control of Work2003
FSSS 104Control of Work05/121
105Control of Material2003
FSSS 105Control of Material05/121
106Acceptance of Work2003
FSSS 106Acceptance of Work05/121
107Legal Relations and Responsibilities to the Public2003
FSSS 107Legal Relations and Responsibilities to the Public05/121
108Prosecution and Progress2003
FSSS 108Prosecution and Progress05/121
109Measurement and Payment2003
FSSS 109Measurement and Payment05/121
151Mobilization2003
152Construction Survey and Staking2003
153Contractor Quality Control2003
FSSS 153Contractor Quality Control05/121
FSSS 154Contractor Sampling and Testing05/121
155Schedules for Construction Contracts2003
FSSS 155Schedules for Construction Contracts05/121
156Public Traffic2003
FSSS 156Public Traffic05/121
157Soil Erosion Control2003
FSSS 157Soil Erosion Control05/121
201Clearing and Grubbing2003
FSSS 201Clearing and Grubbing05/121
203Removal of Structures and Obstructions2003
FSSS 203Removal of Structures and Obstructions05/121
204Excavation and Embankment2003
FSSS 204Excavation and Embankment05/121
208Structure Excavation and Backfill for Selected Major Structures2003
FSSS 208Structure Excavation and Backfill for Selected Major Structures05/121
209Structure Excavation and Backfill2003
301Untreated Aggregate Courses2003
FSSS 301Untreated Aggregate Courses05/121
552Structural Concrete2003
FSSS 552Structural Concrete05/121
554Reinforcing Steel2003
FSSS 554Reinforcing Steel05/121
FSSS 590Precast Concrete Structures05/121
603Structural Plate Structures2003
FSSS 603Structural Plate Structures05/121
619Fences, Gates, and Cattle Guards2003
624Topsoil2003
FSSS 624Topsoil05/121
625Turf Establishment2003
FSSS 625Turf Establishment05/121
629Rolled Erosion Control Products and Cellular Confinement Systems2003
FSSS 629Rolled Erosion Control Products and Cellular Confinement Systems05/121
633Permanent Traffic Control2003
635Temporary Traffic Control2003
FSSS 635Temporary Traffic Control05/121
FSSS 648Stream Simulation05/121
FSSS 703Aggregate05/121
FSSS 704Soil05/121
FSSS 705Rock05/121
FSSS 709Reinforcing Steel and Wire Rope05/121
712Joint Material2003
FSSS 714Geotextile and Geocomposite Drain Material05/121
FSSS 717Structural Metal05/121
3426
Note: All of the specifications cited are applicable to this project. The Forest Service Supplemental Specifications (FSSS)
are included with this solicitation. The other specifications are within the 2003 Standard Specifications for
Construction of Roads and Bridges on Federal Highway Projects. Other specifications referred to
within these specifications (even though not specifically listed herein) are also fully applicable to this project.