Construction Manager as Constructor (CMc) Services Modernization of the Arthur J. Altmeyer Building

Award Notice Posted

Solicitation number
GS-03-P-17-DX-C-0006
Agency
Awarded
to Hensel Phelps Construction Co
Set-aside
No set-aside

Opportunity facts

Contract number
47PD02-18-C-0009 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Social Security Administration Complex 6401 Security Boulevard Woodlawn, Maryland 21235, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·


NOTE: AMENDMENTS ARE HIGHLIGHTED BY ITALICS

Procuring Agency
The General Services Administration (GSA), Mid-Atlantic Region 3, Public Building Services (PBS), Acquisition Management Division, intends to issue a Request for Proposal (RFP) for Construction Manager as Constructor (CMc) Services for the Modernization of the Arthur J. Altmeyer at the Social Security Administration Complex in Woodlawn, Maryland.


Project Synopsis

The Arthur J. Altmeyer project scope consists of removal and replacement of the exterior cladding, interior finishes, mechanical, electrical and plumbing (MEP) systems, stairs and elevators, stripping the building down to the existing reinforced concrete frame. The project also consists of Hazmat abatement. The primary shafts (the stairs, elevators and other building systems risers) will be re-configured to suit modern requirements and a revised layout. The modernized building will incorporate sustainable design principles, efficient space planning, innovative technologies, and contemporary interior design to transform the building into a model workplace that is responsive to the existing building architecture. The mechanical plant in the basement will remain operational throughout construction. The project will also consist of modernization of the auditorium connected to the Altmeyer Building.


Project Location
Social Security Administration Complex
6401 Security Boulevard
Woodlawn, MD 21235


Disclosure of Magnitude of Construction Projects
The estimated total construction cost for the project falls within the range of $90,000,000.00 and $100,000,000.00.


Project Delivery Method
The Government intends to deliver this requirement through the CMc project delivery method to manage and execute a construction project utilizing a Guaranteed Maximum Price (GMP) contract with Construction Contingency Allowance (CCA) and shared savings.


The Construction Manager as Constructor (CMc) project delivery method is commonly referred to as the Construction Manager at-Risk project delivery method.


The following phases of work and services will be required as part of the CMc delivery method;


Design Phase
The Design Phase consists of the following three stages: Design Concept, Design Development, and Construction Documents. The following services are typical requirements that the contractor may need to provide throughout the Design Development, and Construction Documents phases:
1. Program Review Meetings;
2. Consultation/Project Progress Meetings/Presentations;
3. Design Submissions and Reviews;
4. Cost Management, Estimating and Reconciliation;
5. Value Engineering;
6. Construction Work Allocation Plan;
7. Historic Preservation and Environmental Compliance;
8. Construction Work Sequence Plan;
9. Design Development Phase; and
10. Construction Document Phase


Construction Phase
The following services are typical requirements that the contractor may need to provide throughout the construction stage
1. Construction Commencement;
2. Early Work Packages;
3. Construction Administration;
4. Construction Excellence Peer Reviews; and
5. As-Built Drawings


Turnover Phase
The following services are typical requirements that the contractor may need to provide throughout the turnover stage
1. Participate in Pre-Final walk-throughs;
2. Prepare Punch-lists;
3. Prepare Operation and Maintenance Manuals;
4. Submit Warranties, Guarantees, and Certificates; and
5. Preparation for Tenant Occupancy


Competitive Procedures
This procurement will be competed utilizing full and open competition in accordance with FAR 6.1. Competitive proposal will be requested in accordance with FAR 15 "Contracting by Negotiations."


Selection Procedures
The award will be made utilizing the tradeoff process prescribed in FAR 15.101-1. The objective of the Source Selection Process is to select a proposal that represents the best value to the Government. The award will be made to the responsible Offeror whose proposal conforms to the solicitation and offers the best value to the Government, considering the price and non-price factors. For this procurement, the technical factors will be significantly more important than price (FAR 15.101-1, Trade Offs). The technical factors will include:


1. Experience
2. Past Performances
3. Cost Accounting Standards (CAS) Compliance*
4. Management Approach
5. Value Engineering
6. Project Labor Agreement**
7. Subcontracting Plan


*The Contractor must demonstrate their compliance with CAS through the submittal of all disclosures in accordance with FAR 52.230-1, Cost Accounting Standards Notice and Certifications and FAR 52.230-7, Proposal Disclosure - Cost Accounting Practice Changes. Cost Accounting Standard (CAS) compliance shall represent a go/no-go evaluation factor. The successful offeror will be required to use an "open book accounting system" which will be subject to periodic government review.


**Offerors will be invited to submit a proposal subject to PLA requirements (a PLA proposal), a proposal not subject to PLA requirements, or both.


A bid guarantee will be required in accordance with FAR 52.228-1 with each offerors proposal.


Performance and Payment Bonds shall be required prior to Notice to Proceed.


CMc Procurement Schedule
Issue Request for Proposal- On July 17, 2017
Technical Proposal Phase I (Factors 1, 2, 3)- Due Date on August 16, 2017
Technical Proposal Phase II(Factors 4, 5, 6, 7)- Due Date on December 15, 2017
Interviews- Will be held on or about the week of January 29, 2018
Price Proposal Phase III- Due Date on or about February 16, 2018
Award Date- On or about March 16, 2018


To be considered for award an offeror shall submit a proposal at each phase of the procurement.


Architect/Engineer Firm
Hammel, Green and Abrahamson, Inc (HGA Architects) is the designer of Record.
420 N 5th Street, Suite 100
Minneapolis, Minnesota 55401


Design Key Milestones
Presentation of 3 Concepts- On or about September 7, 2017
Single Concept Presentation- On November 28, 2017
Final Concept and Program Approval- On or about January 22, 2018
Design Development Submission for Comments- On or about April 18, 2018
75% Construction Document Submission for Comments- On or about July 19, 2018****
95% Construction Document Submission for Comments- On or about October 4, 2018
100% Construction Document Submission/Design Complete- On or about November 29, 2018


****The government may exercise GMP options at this time


Early Work Packages
The government intends to issue two early work packages for the following services;
1. Abatement of Hazardous Material; and
2. Demolition


The early work packages are planned to be issued by amendment before pricing is received and included in the solicitation as options.


Period of Performance
Design phase services are anticipated to commence upon award of the contract on or about March 23, 2018. The Early Work Packages are anticipated to be included in the award with Notice to Proceed (NTP) to given in April 2018. The Optional Construction Phase Work is anticipated to be awarded on or about July 2018, with a performance period of approximately 912 calendar days (30 months).


NAICS Code and Small Business Standard
The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $36.5 million.


Pre-Proposal Conference for Prime Contractors
A pre-proposal conference will be held at the The Dow Building in Philadelphia on July 27, 2017. Final details will be provided within the solicitation. Prior notification of attendance to this conference is mandatory. You will be asked to provide your company's name and all potential attendees' full names (no more than 2 per firm) to james.eckhardt@gsa.gov by a time and date to be determined within the solicitation.


Site Visit/Investigation and Small Business Opportunity


SITE VISIT


A site visit for ONLY the CMc offerors who were invited will be held at the Arthur J. Altmeyer Building in Woodlawn, Maryland on December 5, 2017 @ 9:30 AM. Prior notification of attendance to this conference is mandatory. You will be asked to provide your company's name and all potential attendees' full names (no more than 4 per firm) to james.eckhardt@gsa.gov by a time and date to be determined via amendment.


SMALL BUSINESS MEET AND GREET


Local small businesses are highly encouraged to attend the Small Business Meet and Greet on December 5, 2017 starting at 1:00 PM EST. This meeting will be a brief business card exchange session to provide an opportunity for subcontractors and vendors to introduce themselves to the potential offerors. The primary trade and vendor opportunities for small business for this project include but are not limited to;
1. Mechanical;
2. Electrical;
3. Plumbing;
4. Glazing;
5. Demolition;
6. Abatement;
7. Heavy civil/Site work;
8. Landscaping;
9. Vertical Transportation; and
10. Finishes

For more information and to register for the event please visit https://www.eventbrite.com/e/arthur-j-altmeyer-project-meet-greet-empowering-small-businesses-tickets-40147026838?aff=es2


Interested Parties/How to Offer
The Solicitation will only be available electronically. It will be available on or about June 30, 2017. The solicitation can only be obtained by accessing FedBizOpps, a secure website designed to safeguard sensitive but unclassified (SBU) acquisition material. Potential offerors will be responsible for downloading the solicitation and for monitoring the website for possible amendments and/or additional information. Potential offerors must register on the FedBizOpps website to have access to solicitation material. For additional registration information, visit the FedBizOpps website, www.fbo.gov.


To ensure that you receive all information regarding this solicitation, please register to receive updates at www.fbo.gov, follow the procedures for notification registration.


Request for Information
All inquiries concerning the project shall be directed to the following email address: james.eckhardt@gsa.gov. Further instructions will be provided in the solicitation section 201.

Update #3 ·

Procuring Agency
The General Services Administration (GSA), Mid-Atlantic Region 3, Public Building Services (PBS), Acquisition Management Division, intends to issue a Request for Proposal (RFP) for Construction Manager as Constructor (CMc) Services for the Modernization of the Arthur J. Altmeyer at the Social Security Administration Complex in Woodlawn, Maryland.


Project Synopsis
The Arthur J. Altmeyer project scope consists of removal and replacement of the exterior cladding, interior finishes, mechanical, electrical and plumbing (MEP) systems, stairs and elevators, stripping the building down to the existing reinforced concrete frame. The project also consists of Hazmat abatement. The primary shafts (the stairs, elevators and other building systems risers) will be re-configured to suit modern requirements and a revised layout. The modernized building will incorporate sustainable design principles, efficient space planning, innovative technologies, and contemporary interior design to transform the building into a model workplace that is responsive to the existing building architecture. The mechanical plant in the basement will remain operational throughout construction. The project will also consist of modernization of the auditorium connected to the Altmeyer Building.


Project Location
Social Security Administration Complex
6401 Security Boulevard
Woodlawn, MD 21235


Disclosure of Magnitude of Construction Projects
The estimated total construction cost for the project falls within the range of $95,000,000.00 and $110,000,000.00.


Project Delivery Method
The Government intends to deliver this requirement through the CMc project delivery method to manage and execute a construction project utilizing a Guaranteed Maximum Price (GMP) contract with Construction Contingency Allowance (CCA) and shared savings.


The Construction Manager as Constructor (CMc) project delivery method is commonly referred to as the Construction Manager at-Risk project delivery method.


The following phases of work and services will be required as part of the CMc delivery method;


Design Phase
The Design Phase consists of the following three stages: Design Concept, Design Development, and Construction Documents. The following services are typical requirements that the contractor may need to provide throughout the Design Development, and Construction Documents phases:
1. Program Review Meetings;
2. Consultation/Project Progress Meetings/Presentations;
3. Design Submissions and Reviews;
4. Cost Management, Estimating and Reconciliation;
5. Value Engineering;
6. Construction Work Allocation Plan;
7. Historic Preservation and Environmental Compliance;
8. Construction Work Sequence Plan;
9. Design Development Phase; and
10. Construction Document Phase


Construction Phase
The following services are typical requirements that the contractor may need to provide throughout the construction stage
1. Construction Commencement;
2. Early Work Packages;
3. Construction Administration;
4. Construction Excellence Peer Reviews; and
5. As-Built Drawings


Turnover Phase
The following services are typical requirements that the contractor may need to provide throughout the turnover stage
1. Participate in Pre-Final walk-throughs;
2. Prepare Punch-lists;
3. Prepare Operation and Maintenance Manuals;
4. Submit Warranties, Guarantees, and Certificates; and
5. Preparation for Tenant Occupancy


Competitive Procedures
This procurement will be competed utilizing full and open competition in accordance with FAR 6.1. Competitive proposal will be requested in accordance with FAR 15 "Contracting by Negotiations."


Selection Procedures
The award will be made utilizing the tradeoff process prescribed in FAR 15.101-1. The objective of the Source Selection Process is to select a proposal that represents the best value to the Government. The award will be made to the responsible Offeror whose proposal conforms to the solicitation and offers the best value to the Government, considering the price and non-price factors. For this procurement, the technical factors will be significantly more important than price (FAR 15.101-1, Trade Offs). The technical factors will include:


1. Experience
2. Past Performances
3. Cost Accounting Standards (CAS) Compliance*
4. Management Approach
5. Value Engineering
6. Project Labor Agreement** 
7. Subcontracting Methodology 

*The Contractor must demonstrate their compliance with CAS through the submittal of all disclosures in accordance with FAR 52.230-1, Cost Accounting Standards Notice and Certifications and FAR 52.230-7, Proposal Disclosure - Cost Accounting Practice Changes. Cost Accounting Standard (CAS) compliance shall represent a go/no-go evaluation factor. The successful offeror will be required to use an "open book accounting system" which will be subject to periodic government review.


**Offerors will be invited to submit a proposal subject to PLA requirements (a PLA proposal), a proposal not subject to PLA requirements, or both.


A bid guarantee will be required in accordance with FAR 52.228-1 with each offerors proposal.


Performance and Payment Bonds shall be required prior to Notice to Proceed.


CMc Procurement Schedule
Issue Request for Proposal- On July 17, 2017
Technical Proposal Phase I (Factors 1, 2, 3)- Due Date on August 16, 2017
Technical Proposal Phase II(Factors 4, 5, 6, 7)- Due Date on or about November 17, 2017
Interviews- Will be held on or about the week of December 11, 2017
Price Proposal Phase III- Due Date on or about January 12, 2018
Award Date- On or about February 16, 2018


To be considered for award an offeror shall submit a proposal at each phase of the procurement.


Architect/Enginner Firm
Hammel, Green and Abrahamson, Inc (HGA Architects) is the designer of Record.
420 N 5th Street, Suite 100
Minneapolis, Minnesota 55401


Design Key Milestones
Presentation of 3 Concepts- On or about September 7, 2017
Single Concept Presentation- On or about October 27, 2017
Final Concept and Program Approval- On or about December 24, 2017
Design Development Submission for Comments- On or about March 19, 2018
75% Construction Document Submission for Comments- On or about July 16, 2018****
95% Construction Document Submission for Comments- On or about September 24, 2018
100% Construction Document Submission/Design Complete- On or about November 12, 2018


****The government may exercise GMP options at this time


Early Work Packages
The government intends to issue two early work packages for the following services;
1. Abatement of Hazardous Material; and
2. Demolition


The early work packages are planned to be issued by amendment before pricing is received and included in the solicitation as options.


Period of Performance
Design phase services are anticipated to commence upon award of the contract on or about 21 February 2018. The Early Work Packages are anticipated to be included in the award with Notice to Proceed (NTP) to given in March 2018. The Optional Construction Phase Work is anticipated to be awarded on or about July 2018, with a performance period of approximately 912 calendar days (30 months).


NAICS Code and Small Business Standard
The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $36.5 million.


Pre-Proposal Conference for Prime Contractors
A pre-proposal conference will be held at the The Dow Building in Philadelphia on July 27, 2017. Final details will be provided within the solicitation. Prior notification of attendance to this conference is mandatory. You will be asked to provide your company's name and all potential attendees' full names (no more than 2 per firm) to james.eckhardt@gsa.gov by a time and date to be determined within the solicitation.



Site Visit/Investigation and Small Business Opportunity
A site visit will be held at the Arthur J. Altmeyer Building in Woodlawn, Maryland at a date and time to be determined. Prior notification of attendance to this conference is mandatory. You will be asked to provide your company's name and all potential attendees' full names (no more than 3 per firm) to james.eckhardt@gsa.gov by a time and date to be determined via amendment.


Local small businesses are highly encouraged to attend the conference. A brief business card exchange session will follow the conference to provide an opportunity for subcontractors and vendors to introduce themselves to potential offerors.


Interested Parties/How to Offer
The Solicitation will only be available electronically. It will be available on or about June 30, 2017. The solicitation can only be obtained by accessing FedBizOpps, a secure website designed to safeguard sensitive but unclassified (SBU) acquisition material. Potential offerors will be responsible for downloading the solicitation and for monitoring the website for possible amendments and/or additional information. Potential offerors must register on the FedBizOpps website to have access to solicitation material. For additional registration information, visit the FedBizOpps website, www.fbo.gov.


To ensure that you receive all information regarding this solicitation, please register to receive updates at www.fbo.gov, follow the procedures for notification registration.


Request for Information
All inquiries concerning the project shall be directed to the following email address: james.eckhardt@gsa.gov. Further instructions will be provided in the solicitation section 201.

Update #2 ·

Procuring Agency
The General Services Administration (GSA), Mid-Atlantic Region 3, Public Building Services (PBS), Acquisition Management Division, intends to issue a Request for Proposal (RFP) for Construction Manager as Constructor (CMc) Services for the Modernization of the Arthur J. Altmeyer at the Social Security Administration Complex in Woodlawn, Maryland.


Project Synopsis
The Arthur J. Altmeyer project scope consists of removal and replacement of the exterior cladding, interior finishes, mechanical, electrical and plumbing (MEP) systems, stairs and elevators, stripping the building down to the existing reinforced concrete frame. The project also consists of Hazmat abatement. The primary shafts (the stairs, elevators and other building systems risers) will be re-configured to suit modern requirements and a revised layout. The modernized building will incorporate sustainable design principles, efficient space planning, innovative technologies, and contemporary interior design to transform the building into a model workplace that is responsive to the existing building architecture. The mechanical plant in the basement will remain operational throughout construction. The project will also consist of modernization of the auditorium connected to the Altmeyer Building.


Project Location
Social Security Administration Complex
6401 Security Boulevard
Woodlawn, MD 21235


Disclosure of Magnitude of Construction Projects
The estimated total construction cost for the project falls within the range of $95,000,000.00 and $110,000,000.00.


Project Delivery Method
The Government intends to deliver this requirement through the CMc project delivery method to manage and execute a construction project utilizing a Guaranteed Maximum Price (GMP) contract with Construction Contingency Allowance (CCA) and shared savings.


The Construction Manager as Constructor (CMc) project delivery method is commonly referred to as the Construction Manager at-Risk project delivery method.


The following phases of work and services will be required as part of the CMc delivery method;


Design Phase
The Design Phase consists of the following three stages: Design Concept, Design Development, and Construction Documents. The following services are typical requirements that the contractor may need to provide throughout the Design Development, and Construction Documents phases:
1. Program Review Meetings;
2. Consultation/Project Progress Meetings/Presentations;
3. Design Submissions and Reviews;
4. Cost Management, Estimating and Reconciliation;
5. Value Engineering;
6. Construction Work Allocation Plan;
7. Historic Preservation and Environmental Compliance;
8. Construction Work Sequence Plan;
9. Design Development Phase; and
10. Construction Document Phase


Construction Phase
The following services are typical requirements that the contractor may need to provide throughout the construction stage
1. Construction Commencement;
2. Early Work Packages;
3. Construction Administration;
4. Construction Excellence Peer Reviews; and
5. As-Built Drawings


Turnover Phase
The following services are typical requirements that the contractor may need to provide throughout the turnover stage
1. Participate in Pre-Final walk-throughs;
2. Prepare Punch-lists;
3. Prepare Operation and Maintenance Manuals;
4. Submit Warranties, Guarantees, and Certificates; and
5. Preparation for Tenant Occupancy


Competitive Procedures
This procurement will be competed utilizing full and open competition in accordance with FAR 6.1. Competitive proposal will be requested in accordance with FAR 15 "Contracting by Negotiations."


Selection Procedures
The award will be made utilizing the tradeoff process prescribed in FAR 15.101-1. The objective of the Source Selection Process is to select a proposal that represents the best value to the Government. The award will be made to the responsible Offeror whose proposal conforms to the solicitation and offers the best value to the Government, considering the price and non-price factors. For this procurement, the technical factors will be significantly more important than price (FAR 15.101-1, Trade Offs). The technical factors will include:


1. Experience
2. Past Performances
3. Cost Accounting Standards (CAS) Compliance*
4. Management Approach
5. Value Engineering
6. Project Labor Agreement** 
7. Subcontracting Methodology 

*The Contractor must demonstrate their compliance with CAS through the submittal of all disclosures in accordance with FAR 52.230-1, Cost Accounting Standards Notice and Certifications and FAR 52.230-7, Proposal Disclosure - Cost Accounting Practice Changes. Cost Accounting Standard (CAS) compliance shall represent a go/no-go evaluation factor. The successful offeror will be required to use an "open book accounting system" which will be subject to periodic government review.


**Offerors will be invited to submit a proposal subject to PLA requirements (a PLA proposal), a proposal not subject to PLA requirements, or both.


A bid guarantee will be required in accordance with FAR 52.228-1 with each offerors proposal.


Performance and Payment Bonds shall be required prior to Notice to Proceed.


CMc Procurement Schedule
Issue Request for Proposal- On July 17, 2017
Technical Proposal Phase I (Factors 1, 2, 3)- Due Date on August 16, 2017
Technical Proposal Phase II(Factors 4, 5, 6, 7)- Due Date on or about November 17, 2017
Interviews- Will be held on or about the week of December 11, 2017
Price Proposal Phase III- Due Date on or about January 12, 2018
Award Date- On or about February 16, 2018


To be considered for award an offeror shall submit a proposal at each phase of the procurement.


Architect/Enginner Firm
Hammel, Green and Abrahamson, Inc (HGA Architects) is the designer of Record.
420 N 5th Street, Suite 100
Minneapolis, Minnesota 55401


Design Key Milestones
Presentation of 3 Concepts- On or about September 7, 2017
Single Concept Presentation- On or about October 27, 2017
Final Concept and Program Approval- On or about December 24, 2017
Design Development Submission for Comments- On or about March 19, 2018
75% Construction Document Submission for Comments- On or about July 16, 2018****
95% Construction Document Submission for Comments- On or about September 24, 2018
100% Construction Document Submission/Design Complete- On or about November 12, 2018


****The government may exercise GMP options at this time


Early Work Packages
The government intends to issue two early work packages for the following services;
1. Abatement of Hazardous Material; and
2. Demolition


The early work packages are planned to be issued by amendment before pricing is received and included in the solicitation as options.


Period of Performance
Design phase services are anticipated to commence upon award of the contract on or about 21 February 2018. The Early Work Packages are anticipated to be included in the award with Notice to Proceed (NTP) to given in March 2018. The Optional Construction Phase Work is anticipated to be awarded on or about July 2018, with a performance period of approximately 912 calendar days (30 months).


NAICS Code and Small Business Standard
The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $36.5 million.


Pre-Proposal Conference for Prime Contractors
A pre-proposal conference will be held at the The Dow Building in Philadelphia on July 27, 2017. Final details will be provided within the solicitation. Prior notification of attendance to this conference is mandatory. You will be asked to provide your company's name and all potential attendees' full names (no more than 2 per firm) to james.eckhardt@gsa.gov by a time and date to be determined within the solicitation.



Site Visit/Investigation and Small Business Opportunity
A site visit will be held at the Arthur J. Altmeyer Building in Woodlawn, Maryland at a date and time to be determined. Prior notification of attendance to this conference is mandatory. You will be asked to provide your company's name and all potential attendees' full names (no more than 3 per firm) to james.eckhardt@gsa.gov by a time and date to be determined via amendment.


Local small businesses are highly encouraged to attend the conference. A brief business card exchange session will follow the conference to provide an opportunity for subcontractors and vendors to introduce themselves to potential offerors.


Interested Parties/How to Offer
The Solicitation will only be available electronically. It will be available on or about June 30, 2017. The solicitation can only be obtained by accessing FedBizOpps, a secure website designed to safeguard sensitive but unclassified (SBU) acquisition material. Potential offerors will be responsible for downloading the solicitation and for monitoring the website for possible amendments and/or additional information. Potential offerors must register on the FedBizOpps website to have access to solicitation material. For additional registration information, visit the FedBizOpps website, www.fbo.gov.


To ensure that you receive all information regarding this solicitation, please register to receive updates at www.fbo.gov, follow the procedures for notification registration.


Request for Information
All inquiries concerning the project shall be directed to the following email address: james.eckhardt@gsa.gov. Further instructions will be provided in the solicitation section 201.


***This is NOT a request for proposals and does not constitute any commitment by the Government.***

Update #1 ·

Procuring Agency
The General Services Administration (GSA), Mid-Atlantic Region 3, Public Building Services (PBS), Acquisition Management Division, intends to issue a Request for Proposal (RFP) for Construction Manager as Constructor (CMc) Services for the Modernization of the Arthur J. Altmeyer at the Social Security Administration Complex in Woodlawn, Maryland.


Project Synopsis
The Arthur J. Altmeyer project scope consists of removal and replacement of the exterior cladding, interior finishes, mechanical, electrical and plumbing (MEP) systems, stairs and elevators, stripping the building down to the existing reinforced concrete frame. The project also consists of Hazmat abatement. The primary shafts (the stairs, elevators and other building systems risers) will be re-configured to suit modern requirements and a revised layout. The modernized building will incorporate sustainable design principles, efficient space planning, innovative technologies, and contemporary interior design to transform the building into a model workplace that is responsive to the existing building architecture. The mechanical plant in the basement will remain operational throughout construction. The project will also consist of modernization of the auditorium connected to the Altmeyer Building.


Project Location
Social Security Administration Complex
6401 Security Boulevard
Woodlawn, MD 21235


Disclosure of Magnitude of Construction Projects
The estimated total construction cost for the project falls within the range of $95,000,000.00 and $110,000,000.00.


Project Delivery Method
The Government intends to deliver this requirement through the CMc project delivery method to manage and execute a construction project utilizing a Guaranteed Maximum Price (GMP) contract with Construction Contingency Allowance (CCA) and shared savings.


The Construction Manager as Constructor (CMc) project delivery method is commonly referred to as the Construction Manager at-Risk project delivery method.


The following phases of work and services will be required as part of the CMc delivery method;


Design Phase
The Design Phase consists of the following three stages: Design Concept, Design Development, and Construction Documents. The following services are typical requirements that the contractor may need to provide throughout the Design Development, and Construction Documents phases:
1. Program Review Meetings;
2. Consultation/Project Progress Meetings/Presentations;
3. Design Submissions and Reviews;
4. Cost Management, Estimating and Reconciliation;
5. Value Engineering;
6. Construction Work Allocation Plan;
7. Historic Preservation and Environmental Compliance;
8. Construction Work Sequence Plan;
9. Design Development Phase; and
10. Construction Document Phase


Construction Phase
The following services are typical requirements that the contractor may need to provide throughout the construction stage
1. Construction Commencement;
2. Early Work Packages;
3. Construction Administration;
4. Construction Excellence Peer Reviews; and
5. As-Built Drawings


Turnover Phase
The following services are typical requirements that the contractor may need to provide throughout the turnover stage
1. Participate in Pre-Final walk-throughs;
2. Prepare Punch-lists;
3. Prepare Operation and Maintenance Manuals;
4. Submit Warranties, Guarantees, and Certificates; and
5. Preparation for Tenant Occupancy


Competitive Procedures
This procurement will be competed utilizing full and open competition in accordance with FAR 6.1. Competitive proposal will be requested in accordance with FAR 15 "Contracting by Negotiations."


Selection Procedures
The award will be made utilizing the tradeoff process prescribed in FAR 15.101-1. The objective of the Source Selection Process is to select a proposal that represents the best value to the Government. The award will be made to the responsible Offeror whose proposal conforms to the solicitation and offers the best value to the Government, considering the price and non-price factors. For this procurement, the technical factors will be significantly more important than price (FAR 15.101-1, Trade Offs). The technical factors will include:


1. Experience
2. Past Performances
3. Cost Accounting Standards (CAS) Compliance*
4. Management Approach
5. Value Engineering
6. Subcontracting Plan
7. Project Labor Agreement**
8. Interviews


*The Contractor must demonstrate their compliance with CAS through the submittal of all disclosures in accordance with FAR 52.230-1, Cost Accounting Standards Notice and Certifications and FAR 52.230-7, Proposal Disclosure - Cost Accounting Practice Changes. Cost Accounting Standard (CAS) compliance shall represent a go/no-go evaluation factor. The successful offeror will be required to use an "open book accounting system" which will be subject to periodic government review.


**Offerors will be invited to submit a proposal subject to PLA requirements (a PLA proposal), a proposal not subject to PLA requirements, or both.


A bid guarantee will be required in accordance with FAR 52.228-1 with each offerors proposal.


Performance and Payment Bonds shall be required prior to Notice to Proceed.


Procurement Schedule
Issue Request for Proposal- On or about July 7, 2017
Technical Proposal Phase I (Factors 1, 2, 3)- Due Date on or about August 7, 2017
Technical Proposal Phase II(Factors 4, 5, 6, 7)- Due Date on or about November 17, 2017
Interviews (Factor 8)- Will be held on or about the week of December 11, 2017
Price Proposal Phase III- Due Date on or about January 12, 2018
Award Date- On or about February 16, 2018


To be considered for award an offeror shall submit a proposal at each phase of the procurement.


Design Schedule
Design Charrette- On or about June 29, 2017
Presentation of 3 Concepts- On or about September 7, 2017
Single Concept Presentation- On or about October 27, 2017
Final Concept and Program Approval- On or about December 24, 2017
Design Development Submission for Comments- On or about March 19, 2018
75% Construction Document Submission for Comments- On or about July 16, 2018****
95% Construction Document Submission for Comments- On or about September 24, 2018
100% Construction Document Submission/Design Complete- On or about November 12, 2018


****The government may exercise GMP options at this time


Early Work Packages
The government intends to issue two early work packages for the following services;
1. Abatement of Hazardous Material; and
2. Demolition


The early work packages are planned to be issued by amendment before pricing is received and included in the solicitation as Firm Fixed Price line items.


Period of Performance
Design phase services are anticipated to commence upon award of the contract on or about 16 February 2018. The Early Work Packages are anticipated to be included in the award with Notice to Proceed (NTP) to given in March 2018. The Optional Construction Phase Work is anticipated to be awarded on or about July 2018, with a performance period of approximately 912 calendar days (30 months).


NAICS Code and Small Business Standard
The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $36.5 million.


Pre-Proposal Conference and Small Business Opportunity


A pre-proposal conference will be held at the Altmeyer Building at a date and time to be determined. Final details will be provided within the solicitation. Prior notification of attendance to this conference is mandatory. You will be asked to provide your company's name and all potential attendees' full names (no more than 3 per firm) to james.eckhardt@gsa.gov by a time and date to be determined within the solicitation.


Local small businesses are highly encouraged to attend the conference. A brief business card exchange session will follow the conference to provide an opportunity for subcontractors and vendors to introduce themselves to potential offerors.


Interested Parties/How to Offer
The Solicitation will only be available electronically. It will be available on or about June 30, 2017. The solicitation can only be obtained by accessing FedBizOpps, a secure website designed to safeguard sensitive but unclassified (SBU) acquisition material. Potential offerors will be responsible for downloading the solicitation and for monitoring the website for possible amendments and/or additional information. Potential offerors must register on the FedBizOpps website to have access to solicitation material. For additional registration information, visit the FedBizOpps website, www.fbo.gov.


To ensure that you receive all information regarding this solicitation, please register to receive updates at www.fbo.gov, follow the procedures for notification registration.


Request for Information
All inquiries concerning the project shall be directed to the following email address: james.eckhardt@gsa.gov. Further instructions will be provided in the solicitation section 201.


***This is NOT a request for proposals and does not constitute any commitment by the Government.***

Files

File Type Posted
Visting_Woodlawn_Instructions.pdf PDF
Salt_Dome.png PNG image

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity