CO FTNP COLM 10(3), Rim Rock Drive
Award Notice Posted
- Solicitation number
- DTFH6817B00018
- Agency
-
Federal Highway Administration
Department of Transportation
- Awarded
- to Oldcastle SW Group, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- 6982AF18C000006 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Colorado National Monument, Mesa County Fruita, Colorado 81521, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATION ARE AVAILABLE.
PROJECT DETAILS: This project in includes reconstruction of a 4.7 miles of the Rim Rock Drive in Colorado National Monument.
Type of Construction: grading, culverts, concrete headwalls, and riprap, aggregate base course, asphalt pulverizing and paving, traffic control, public information.
This project consists of:
Schedule A: Phased Construction of 3.7 miles of roadway reconstruction and paving.
Significant Items for Schedule A Include: 500 LF of fiber rolls; 4,000 CY of roadway embankment; 1,500 sub excavation; 300 cuyd of riprap; 2,000 tons of aggregate base; 8,500 tons of hot asphalt paving; 120 LF of pipe culvert placement; 500 LF of guardrail; 150,000 linear feet of pavement markings; 1,500 flagger hours
Option X: Phased Construction of .5 miles of roadway reconstruction and paving.
Significant Items for Option X Include: 100 LF of fiber rolls; 2,000 CY of roadway excavation; 400 cuyd excavation waste; 50 cuyd of riprap; 2,000 tons of aggregate base; 2,300 tons of hot asphalt paving; 50 LF of pipe culvert placement; .05 miles of pavement markings; 200 flagger hours.
Option Y: Phased Construction of .4 miles of roadway reconstruction and paving.
Significant Items for Option Y Include: 50 LF of fiber rolls; 1,000 CY of roadway excavation; 400 cuyd excavation waste; 50 cuyd of riprap; 2,000 tons of aggregate base; 2,000 tons of hot asphalt paving; 30 LF of pipe culvert placement; .04 miles of pavement markings; 200 flagger hours.
Estimated total cost is $4 million to $6 million, depending on the Schedule and Options awarded.
Update #1 ·
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATION ARE NOT AVAILABLE.
PROJECT DETAILS: This project in includes reconstruction of a 4.7 miles of the Rim Rock Drive in Colorado National Monument.
Type of Construction: grading, culverts, concrete headwalls, and riprap, aggregate base course, asphalt pulverizing and paving, traffic control, public information.
This project consists of:
Schedule A: Phased Construction of 3.7 miles of roadway reconstruction and paving.
Significant Items for Schedule A Include: 500 LF of fiber rolls; 4,000 CY of roadway embankment; 1,500 sub excavation; 300 cuyd of riprap; 2,000 tons of aggregate base; 8,500 tons of hot asphalt paving; 120 LF of pipe culvert placement; 500 LF of guardrail; 150,000 linear feet of pavement markings; 1,500 flagger hours
Option X: Phased Construction of .5 miles of roadway reconstruction and paving.
Significant Items for Option X Include: 100 LF of fiber rolls; 2,000 CY of roadway excavation; 400 cuyd excavation waste; 50 cuyd of riprap; 2,000 tons of aggregate base; 2,300 tons of hot asphalt paving; 50 LF of pipe culvert placement; .05 miles of pavement markings; 200 flagger hours.
Option Y: Phased Construction of .4 miles of roadway reconstruction and paving.
Significant Items for Option Y Include: 50 LF of fiber rolls; 1,000 CY of roadway excavation; 400 cuyd excavation waste; 50 cuyd of riprap; 2,000 tons of aggregate base; 2,000 tons of hot asphalt paving; 30 LF of pipe culvert placement; .04 miles of pavement markings; 200 flagger hours.
It is anticipated this project will be advertised in October, 2017 with construction beginning in December 2017 and extending through September 2018.
Estimated total cost is $4 million to $6 million, depending on the Schedule and Options awarded.
Files
| File | Type | Posted |
|---|---|---|
| Amendment_A001.pdf | ||
| DTFH6817B00018_IFB.pdf | ||
| CO.FTNP.COLM.10(3).Rim_Rock_Drive_Spot_Repairs.2017.pdf | ||
| CO_FTNP_COLM_10(3)_Pavement_Report.pdf | ||
| CO_COLM10(3)_FINAL.pdf |