CO FTNP COLM 10(3), Rim Rock Drive

Award Notice Posted

Solicitation number
DTFH6817B00018
Agency
Awarded
to Oldcastle SW Group, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
6982AF18C000006 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Colorado National Monument, Mesa County Fruita, Colorado 81521, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·


THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATION ARE AVAILABLE.



PROJECT DETAILS: This project in includes reconstruction of a 4.7 miles of the Rim Rock Drive in Colorado National Monument.


Type of Construction: grading, culverts, concrete headwalls, and riprap, aggregate base course, asphalt pulverizing and paving, traffic control, public information.


This project consists of:


Schedule A: Phased Construction of 3.7 miles of roadway reconstruction and paving.


Significant Items for Schedule A Include: 500 LF of fiber rolls; 4,000 CY of roadway embankment; 1,500 sub excavation; 300 cuyd of riprap; 2,000 tons of aggregate base; 8,500 tons of hot asphalt paving; 120 LF of pipe culvert placement; 500 LF of guardrail; 150,000 linear feet of pavement markings; 1,500 flagger hours


Option X: Phased Construction of .5 miles of roadway reconstruction and paving.


Significant Items for Option X Include: 100 LF of fiber rolls; 2,000 CY of roadway excavation; 400 cuyd excavation waste; 50 cuyd of riprap; 2,000 tons of aggregate base; 2,300 tons of hot asphalt paving; 50 LF of pipe culvert placement; .05 miles of pavement markings; 200 flagger hours.


Option Y: Phased Construction of .4 miles of roadway reconstruction and paving.


Significant Items for Option Y Include: 50 LF of fiber rolls; 1,000 CY of roadway excavation; 400 cuyd excavation waste; 50 cuyd of riprap; 2,000 tons of aggregate base; 2,000 tons of hot asphalt paving; 30 LF of pipe culvert placement; .04 miles of pavement markings; 200 flagger hours.


Estimated total cost is $4 million to $6 million, depending on the Schedule and Options awarded.

Update #1 ·


THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATION ARE NOT AVAILABLE.



PROJECT DETAILS: This project in includes reconstruction of a 4.7 miles of the Rim Rock Drive in Colorado National Monument.


Type of Construction: grading, culverts, concrete headwalls, and riprap, aggregate base course, asphalt pulverizing and paving, traffic control, public information.


This project consists of:


Schedule A: Phased Construction of 3.7 miles of roadway reconstruction and paving.


Significant Items for Schedule A Include: 500 LF of fiber rolls; 4,000 CY of roadway embankment; 1,500 sub excavation; 300 cuyd of riprap; 2,000 tons of aggregate base; 8,500 tons of hot asphalt paving; 120 LF of pipe culvert placement; 500 LF of guardrail; 150,000 linear feet of pavement markings; 1,500 flagger hours


Option X: Phased Construction of .5 miles of roadway reconstruction and paving.


Significant Items for Option X Include: 100 LF of fiber rolls; 2,000 CY of roadway excavation; 400 cuyd excavation waste; 50 cuyd of riprap; 2,000 tons of aggregate base; 2,300 tons of hot asphalt paving; 50 LF of pipe culvert placement; .05 miles of pavement markings; 200 flagger hours.


Option Y: Phased Construction of .4 miles of roadway reconstruction and paving.


Significant Items for Option Y Include: 50 LF of fiber rolls; 1,000 CY of roadway excavation; 400 cuyd excavation waste; 50 cuyd of riprap; 2,000 tons of aggregate base; 2,000 tons of hot asphalt paving; 30 LF of pipe culvert placement; .04 miles of pavement markings; 200 flagger hours.


It is anticipated this project will be advertised in October, 2017 with construction beginning in December 2017 and extending through September 2018.


Estimated total cost is $4 million to $6 million, depending on the Schedule and Options awarded.

Files

File Type Posted
Amendment_A001.pdf PDF
DTFH6817B00018_IFB.pdf PDF
CO.FTNP.COLM.10(3).Rim_Rock_Drive_Spot_Repairs.2017.pdf PDF
CO_FTNP_COLM_10(3)_Pavement_Report.pdf PDF
CO_COLM10(3)_FINAL.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity