CO_COLM10(3)_FINAL.pdf
PDF 24 MB Posted
- Attached to
- CO FTNP COLM 10(3), Rim Rock Drive
- Solicitation number
- DTFH6817B00018
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_A001.pdf | ||
| CO.FTNP.COLM.10(3).Rim_Rock_Drive_Spot_Repairs.2017.pdf | ||
| CO_FTNP_COLM_10(3)_Pavement_Report.pdf | ||
| DTFH6817B00018_IFB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M
C O
L M .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3
Subexcavation
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M
C O
L M .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
A4
SURVEY CONTROL
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts A G e n s h t\
C O
L M
C o n tr o lS h e e t.
d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
West Entrance
Visitor Center
Rim Rock Drive
C o lu m b u s C a n y o n
Entrance
Junction)
East (Grand
Sheet 1 of 2
SITE MAP
Devils Kitchen
Dogs Tooth
Cold Shivers Point
Devils Kitchen Picnic Area
Tunnel
A5 liarT ne hcti
K sli v e
D li a r
T n o y n a
C o h c
E
NO SCALE
E a s t
G la d e
Pa rk
R oa d
S e r p e n ts
Trail
14.2 miles
To Park Headquarters
5 miles
To East Glade Park
4 miles
To Grand Junction
E = 2102398.723
N = 1447415.008
East Glade Park - 011
Sta. 1000+00
Begin Option Y
CO FTNP COLM 10(3)
E = 2102821.666
N = 1450276.086
Rim Rock Drive - 010
Sta. 20+00
Begin Schedule A
CO FTNP COLM 10(3)
E = 2103130.379
N = 1450436.898
East Glade Park - 011
Sta. 1038+30
End Option Y
CO FTNP COLM 10(3)
E = 211019.980
N = 1453329.679
Rim Rock Drive - 010
Sta. 225+47
End Option X
CO FTNP COLM 10(3)
CO FTNP COLM 10(3)
End Schedule A
Begin Option X
Sta. 188+00
Rim Rock Drive - 010
Potential Staging Area
9 miles
& Guardrails locations
2000+50, 3001+00
To Sites:
Schedule A
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts A G e n s h t\
S T
E
C O
L M .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
Fruita Canyon
Kodels Canyon
Wedding Canyon Trail
Park Headquarters
Visitor Center
West (Fruita) Entrance
SITE MAP
Sheet 2 of 2
A6
U p p e r
M o n u m e n t
Ca n y on
Tra il
CCC T
ra il
Black
Trail
Ridge
C o k e O v e n s
Tr ail li a r
T s' o tt
O
Window
Rock Trail
C a n y o n R im T ra il
NO SCALE
9 miles
20+00
To Begin Project To Fruita and I-70 Exit
2 miles
E = 2082682.463
N = 1464365.163
Sta. 2000+50
Schedule A
BEGIN PROJECT
CO FTNP COLM 10(3)
E = 2083540.431
N = 1465383.845
Sta. 3003+50
Schedule A
END PROJECT
CO FTNP COLM 10(3)
E = 2083581.821
N = 1465141.617
Sta. 3001+00
Schedule A
BEGIN PROJECT
CO FTNP COLM 10(3)
E = 2082831.647
N = 1464482.924
Sta. 2002+50
Schedule A
END PROJECT
CO FTNP COLM 10(3)
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts A G e n s h t\
S T
E
C O
L M .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
MAINLINE
TYPICAL SECTIONS
NO SCALE
NOTE:
Average Existing Width
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
2.
1.
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
See Detail A
Shldr
1'
Shldr
1'
Construction Limits
Shoulder
Pulverized Width
Traveled way structural section details
See mainline typical section for
Foreslope
DETAIL A
Fog sealPrime coat
Tack coat (between lifts)
22'
10'10'
A7
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
See Detail A
Shldr
1'
Shldr
1'
Construction Limits
Fog sealPrime coat
Tack coat (between lifts)
10'10' pavement placed in two lifts
3" asphalt concrete pavement placed in two lifts
4" asphalt concrete varies from 3" to 12" - Route 11.
varies from 3" to 14" - Route 10, Existing aggregate base depth varies from 4" to 6.5" - Route 11.
varies from 2.75" to 7" - Route 10, Existing asphalt pavement depth
Varies and left sides of roadway) for drainage and appearance. (Detail applies to both right concrete pavement. Shape and compact as necessary
(pay item 30202-2000) after placement of asphalt section. Shoulder up with Roadway Aggregate, Method 2
Incorporate pulverized material into the mainline base
Remove all pulverized asphalt material from this section.
4.
4.
3.
of roadway)
(safety edge both sides pavement edge
30° - 35°
Construct
EXISTING TYPICAL SECTION
Sta. 20+00 to Sta. 225+47
Sta. 1000+00 to Sta. 1038+30
1'
1:3 to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:3 foreslope unless otherwise directed by the CO.
Pavements Report.
Pulverize to a depth of 6". For existing pavement depths see
Pulverize the existing paved width or as directed by the CO.
6" Full Depth Reclamation
6" Full Depth Reclamation
East Glade Park Road - 011
Option Y
TYPICAL SECTION
Schedule A & Option X
Rim Rock Drive - 010
TYPICAL SECTION
Sta. 1000+00 to Sta. 1038+30 - East Glade Park Road - 011 Option Y
Sta. 20+00 to Sta. 225+47 - Rim Rock Drive - 010 Schedule A & Option X
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
C O
L M .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
NOTE:
Existing ground paved ditch
Existing asphalt
Tack coat
Fog seal
Ditch width variesShoulder
4' average for Structural Section
See Mainline Typical Section
2.
NO SCALE
Traveled WayTraveled Way
Match existing Match existing
10'10' placed in two lifts
3" asphalt concrete pavement
Shldr 1'
3-inch depth
Removal of pavement, asphalt placed in two lifts
3" asphalt concrete pavement
Prime coat
Fog seal
(between lifts)
Tack coat curb and gutter
Protect existing curb and gutter
Protect existing
Width varies (32' to 40')
Match existing gutter elevation
2" asphalt concrete pavement
TYPICAL SECTION
HISTORIC STONE WALL
TYPICAL SECTION
PARKING AREAS
TYPICAL SECTION
PAVED DITCH
Existing ground
MISCELLANEOUS
TYPICAL SECTIONS
Match existing
2.
1.Shldr 1' paved ditch before overlay.
Clean and crack seal the existing existing paved ditch after placement of overlay.
spread, compact, and maintain the shape of the
Provide equipment necessary to
See Paved Ditch Summary for Locations existing stone wall Do not disturb
Existing ground Va ria ble
Ex ist ing Sl op e
Construction Limits
Prime coat Fog seal
A8
6-inch depth
Removal of pavement, asphalt
Rim Rock Drive - 010
Sta. 62+55 to Sta. 67+36
(between lifts)
Tack coat
224+00 East Entrance Sign
220+00 East Entrance
Sta. 209+00 Lowers Serpent's Trail (Devil's Kitchen)
Sta. 86+50 Upper Serpent's Trail
Sta. 41+00 Cold Shivers Point
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
C O
L M .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
CL
24" (typ.)
NO SCALE
1'
RSS
TYPICAL SECTION
A9
2.
1.
3. Construct according to Section 261 of the FP-14.
Existing ground
Ditch reconditioning
Special 204-A at each bench, see
Geocomposite drains
See Typical Section Site Repairs
L=20' min.
Type II (geogrid)
Reinforcement geosynthetic
L=4'
Type I (geotextile)
Reinforcement geosynthetic geogrid to full width
Extend top 2 layers of m in m in m in m in
1:1.5 (m ax.)
RSS and Riprap limits are to be verified by the CO.
Remove all existing material from roadway, deep excavation, and riprap section.
4.
4.
Cover with 6" min. topsoil
Rim Rock Drive - 010
TYPICAL SECTION
RSS
Select borrow
Va rie s
Remove existing Riprap from slope and incorporate or waste it as directed by the CO.
20' min.
Sta. 2001+50 to Sta. 2002+50
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
C O
L M R
G S w o r k in g .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
NO SCALE
2.
1.
Shoulder
Traveled way structural section details
See mainline typical section for
Foreslope
DETAIL A
Varies
3.
of roadway)
(safety edge both sides pavement edge
30° - 35°
Construct
1'
SITE REPAIRS
TYPICAL SECTIONS
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
See Detail A
10'10'Shldr.
1'
Shldr.
1'
Remove existing pavement and base course pavement placed in two lifts
3" Asphalt concrete
2%2% to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:3 foreslope unless otherwise directed by the CO.
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
3.
and left sides of roadway) for drainage and appearance. (Detail applies to both right concrete pavement. Shape and compact as necessary
(pay item 30202-2000) after placement of asphalt
Shoulder up with Roadway Aggregate, Method 2
A10
1:3
6" Roadway Aggregate, Method 2
3001+00 to 3003+50
2000+50 to 2002+50
SCHEDULE A
TYPICAL SECTION
Fog SealPrime Coat
Tack coat (between lifts)
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
C O
L M
S it e
R e p a ir s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
Variable
W
Variable
3' minimum
4' (typ.)
4' (typ.)
APPROACH ROADS
TYPICAL SECTIONS
CLASSTYPE
APPLICATION
SAMPLE
Paved apron
ADT ≥ 200
100 ≤ ADT < 199
25 ≤ ADT < 100
ADT < 25
Minimum 2-Way Use
Logging Truck Use
Farm Equipment
Minimum 1-Way Use
Field Access
A
E
D
C
B
A
D
C
B
A
* Match existing
(ft)
W
WIDTH
MIN.
(ft)
R
RADIUS
MIN.
N/A
4' (typ.)
U s e r r o x a n n ie .g o n z a le z
A
V a ria b le
TYPICAL SYMBOL
M a in li e
A
SECTION A-A
NO SCALE
TYPICAL PLAN
TYPE 3
APPROACH ROAD
REMARKS
APPROACH ROAD SUMMARY
base edge
Aggregate b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
Approach Road road connection on plan and profile sheet
Example of symbol showing standard approach shown may be varied ±20°.
Under special conditions, the approach road angle
3.
1.
6.
2.
6.
2.
6.
End Section A-A
Total length
Paved length
Subgrade edge
90° W
Type
Class
Mainline stationing
Aggregate base edge with mainline roadway construction.
Construct cut and fill slopes for approach roads to match locations to be field verified.
Stations shown are approximate locations. Actual
5. 5.
pavement edge
Asphalt concrete roads with widths greater than 15 feet.
Apply the normal mainline crown section to approach
(ft)
LENGTH
PAVED
CLASS
TYPE
STATION
(ft)
W
219+22 Rt.
210+70 Lt.
3A
3A
4'
4'
22'
26'
1:3 1:3
A11
Standard Drawing 602-9).
roadway, use safety end sections (see placed within the clear zone of the mainline mainline recovery area. When a culvert must be radius to provide a flatter foreslope and increased
Place culverts at the end of the approach road thicknesses and foreslopes.
Refer to mainline typical sections for structural section maximum.
0% to -2% grade. Under special conditions, use 6% grades within ±2%. In snowy regions restrict this to a
Construct approach roads with landing areas having approach road centeline.
existing radii or widths. R1 is on the left side of the
Vary radii to fit unusual field conditions. Do not reduce 8.
7.
6.
5.
4.
3.
2.
1.
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
C O
L M
A
P .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
Sheet and Description
B8 B9 B10 B11 B12
Surfacing Summary
Riprap Summary
Miscellaneous Summary
Miscellaneous Summary
Permanent Signs
Summary ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 400 20 420
A0140 15706-1000 SOIL EROSION CONTROL, INLET
PROTECTION EACH 6 6
A0160 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0180 20301-0700 REMOVAL OF DELINEATOR EACH 194 6 200
A0200 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0220 20301-2400 REMOVAL OF SIGN EACH 25 5 30
A0240 20302-0400 REMOVAL OF CURB, ASPHALT LNFT 2,866 134 3,000
A0260 20302-1200 REMOVAL OF GUARDRAIL LNFT 4,757 93 4,850
A0280 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 4,731 239 4,970
A0300 20402-0000 SUBEXCAVATION CUYD 1,210 60 1,270
A0320 20410-0000 SELECT BORROW CUYD 4,787 313 5,100
A0340 20420-0000 EMBANKMENT CONSTRUCTION CUYD 3,745 255 4,000
A0360 20720-0100 REINFORCEMENT GEOSYNTHETIC,
TYPE 1 SQYD 1,213 62 1,275
A0380 20720-0200 REINFORCEMENT GEOSYNTHETIC,
TYPE 2 SQYD 3,413 187 3,600
A0400 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 104 50 6 160
A0420 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,069 165 66 1,300
A0440 30302-1000 DITCH RECONDITIONING LNFT 46 4 50
A0460 30401-5300 FULL DEPTH RECLAMATION,
METHOD 2, 6-INCH DEPTH MILE 3.064 3.064
A0480 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL TON 7,914 186 8,100
A0500 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 79 6 85
A0520 40301-0200 ASPHALT CONCRETE PAVEMENT, Temporary Pavement
TYPE 2 Quantities are
TON 508 22 530 included
A0540 40601-0000 FOG SEAL TON 18 1 1 20
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A ug -2
2:
P M
N
C O
\c ol m
0( 3)
\R oa dw ay
\E st im at es _S ch ed ul es
\E ng in ee r Es tim at es \1
_E st im at es
Es tim at e-
_S ch ed
A
F
IN
A L.
xl sx
]S he et
STATE PROJECT
B1CO FTNP COLM10(3)CO
SHEET
NUMBER
NPS PMIS No. 187947, 187951, 187951 NPS Drwg No. 119-130017
B8 B9 B10 B11 B12 B13
Surfacing Summary
Riprap Summary
Miscellaneo us
Summary
Miscellaneou s Summary
Permanent Signs
Summary
Pavement Markings Summary
ALLOWANCE Bid Schedule
A0560 41102-1000 PRIME COAT, METHOD 1 SQYD 49,331 2,369 51,700
A0580 41105-0000 BLOTTER TON 72
A0600 41201-0000 TACK COAT TON 21 1 3 25
A0620 60103-0180 CONCRETE, HEADWALL FOR
36-INCH PIPE CULVERT EACH 1 1
A0640 60201-1000 36-INCH PIPE CULVERT LNFT 73 7 80
A0660 60210-1000 END SECTION FOR 36-INCH PIPE
CULVERT EACH 1 1
A0680 60901-0400 CURB, CONCRETE, 6-INCH DEPTH LNFT 2,866 134 3,000
A0700 61701-4350 GUARDRAIL SYSTEM CRG, TYPE 4,
CLASS B LNFT 62 62
A0720 61701-5100 GUARDRAIL SYSTEM MGS, TYPE 4,
CLASS B STEEL POSTS LNFT 350 5 355
A0740 61701-5150 GUARDRAIL SYSTEM MGS, TYPE 4,
CLASS B WOOD POSTS LNFT 3,666 74 3,740
A0760 61702-0400 TERMINAL SECTION, TYPE G4-CRT EACH 1 1
A0780 61702-1500 TERMINAL SECTION, TYPE MGS
TANGENT EACH 26 4 30
A0800 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 60
A0820 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 60
A0840 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 30
A0860 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 60
A0880 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 20
A0900 62301-0000 GENERAL LABOR HOUR 60
A0920 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 40
A0940 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 40
A0960 62405-0400 PLACING CONSERVED TOPSOIL,
6-INCH DEPTH SQYD 300 15 315
A0980 63301-0000 SIGN SYSTEM EACH 21 1 22
A1000 63309-0000 DELINEATOR EACH 320 25 345
A1020 63401-0700 PAVEMENT MARKINGS, TYPE D,
SOLID LNFT 143,032 2,768 145,800
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A ug -2
2:
P M
N
C O
\c ol m
0( 3)
\R oa dw ay
\E st im at es _S ch ed ul es
\E ng in ee r Es tim at es \1
_E st im at es
Es tim at e-
_S ch ed
A
F
IN
A L.
xl sx
]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B2CO FTNP COLM10(3)CO
SHEET
NUMBER
Surfacing Summary
Riprap Summary
Miscellaneous Summary
Miscellaneous Summary
Permanent Signs
Summary
Pavement Markings Summary
ALLOWANCE Bid Schedule
A1040 63401-0800 PAVEMENT MARKINGS, TYPE D,
BROKEN LNFT 2,390 50 2,440
A1060 63405-1650 PAVEMENT MARKINGS, TYPE D,
ACCESSIBILITY SYMBOL EACH 1 1
A1080 63501-1000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR LPSM ALL
A1100 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 90
A1120 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 40
A1140 63503-0300 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 LNFT 4 20
A1160 63503-0400 TEMPORARY TRAFFIC CONTROL,
CONCRETE BARRIER LNFT 70
A1180 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 383 17 400
A1200 63505-1000 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS MILE 3.361
A1220 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 3,000
A1240 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 1,500
A1260 63602-6020 SYSTEM INSTALLATION, TRAFFIC
DETECTOR WIRE LOOP EACH 2
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A ug -2
2:
P M
N
C O
\c ol m
0( 3)
\R oa dw ay
\E st im at es _S ch ed ul es
\E ng in ee r Es tim at es \1
_E st im at es
Es tim at e-
_S ch ed
A
F
IN
A L.
xl sx
]S he et
3)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B3CO FTNP COLM10(3)CO
SHEET
NUMBER
Surfacing Summary
Riprap Summary
Miscellaneous Summary
Miscellaneous Summary
Permanent Sign Summary
Pavement Markings Summary
ALLOWANCE Bid Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
X0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0080 15401-0000 CONTRACTOR TESTING LPSM ALL
X0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 100 10 110
X0140 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
X0160 20301-1900 REMOVAL OF PIPE CULVERT EACH 2 2
X0180 20301-2400 REMOVAL OF SIGN EACH 19 1 20
X0200 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 204 11 215
X0220 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 16 2 18
X0240 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 54 6 60
X0260 30401-5300 FULL DEPTH RECLAMATION,
METHOD 2, 6-INCH DEPTH MILE 0.710 0.710
X0280 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL TON 1,573 47 1,620
X0300 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 16 4 20
X0320 40601-0000 FOG SEAL TON 4 1 5
X0340 41102-1000 PRIME COAT, METHOD 1 SQYD 9,787 413 10,200
X0360 41105-0000 BLOTTER TON 14
X0380 41201-0000 TACK COAT TON 4 1 5
X0400 50101-1000 MINOR CONCRETE PAVEMENT,
REINFORCED, 10-INCH DEPTH SQYD 204 6 210
X0420 60201-0600 18-INCH PIPE CULVERT LNFT 42 3 45
X0440 60201-1000 36-INCH PIPE CULVERT LNFT 100 100 As directed by CO.
X0460 60210-0600 END SECTION FOR 18-INCH PIPE
CULVERT EACH 2 2
X0480 60210-1000 END SECTION FOR 36-INCH PIPE As directed by CO.
CULVERT EACH 2 2
X0500 60212-1000 ELBOW, 36-INCH EACH 1 1 As directed by CO.
X0520 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 20
-A ug -2
2:
P M
N
C O
\c ol m
0( 3)
\R oa dw ay
\E st im at es _S ch ed ul es
\E ng in ee r Es tim at es \1
_E st im at es
Es tim at e-
_O pt X
F
IN
A L.
xl sx
]S he et
SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B4CO FTNP COLM 10(3)CO
SHEET
NUMBER
NPS PMIS No. 187947,187950,187951 Drawing No. 119-130017
Surfacing Summary
Riprap Summary
Miscellaneous Summary
Miscellaneous Summary
Permanent Sign Summary
Pavement Markings Summary
ALLOWANCE Bid Schedule
X0540 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 20
X0560 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 10
X0580 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 10
X0600 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 10
X0620 62301-0000 GENERAL LABOR HOUR 20
X0640 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 10
X0660 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 10
X0680 63301-0000 SIGN SYSTEM EACH 18 2 20
X0700 63313-0000 RUMBLE STRIP LNFT 200 20 220
X0720 63401-0700 PAVEMENT MARKINGS, TYPE D,
SOLID LNFT 29,122 878 30,000
X0740 63401-0800 PAVEMENT MARKINGS, TYPE D,
BROKEN LNFT 728 2 730
X0760 63501-1000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR LPSM ALL
X0780 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 20
X0800 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 6
X0820 63505-1000 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS MILE 0.7
X0840 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 530
X0860 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 250
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
-A ug -2
2:
P M
N
C O
\c ol m
0( 3)
\R oa dw ay
\E st im at es _S ch ed ul es
\E ng in ee r Es tim at es \1
_E st im at es
Es tim at e-
_O pt X
F
IN
A L.
xl sx
]S he et
2)
SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B5CO FTNP COLM 10(3)CO
SHEET
NUMBER
Surfacing Summary
Riprap Summary
Miscellaneous Summary
Miscellaneous Summary
Permanent Sign Summary
Pavement Markings Summary
ALLOWANCE Bid Schedule
Y0020 15101-0000 MOBILIZATION LPSM ALL
Y0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
Y0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Y0080 15401-0000 CONTRACTOR TESTING LPSM ALL
Y0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
Y0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 50 5 55
Y0140 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
Y0160 20301-0700 REMOVAL OF DELINEATOR EACH 14 1 15
Y0180 20301-2400 REMOVAL OF SIGN EACH 9 1 10
Y0200 20302-0400 REMOVAL OF CURB, ASPHALT LNFT 344 16 360
Y0220 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 9 1 10
Y0240 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 88 20 12 120
Y0260 30401-5300 FULL DEPTH RECLAMATION,
METHOD 2, 6-INCH DEPTH MILE 0.725 0.725
Y0280 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL TON 2,088 102 2,190
Y0300 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 21 1 22
Y0320 40601-0000 FOG SEAL TON 4 1 5
Y0340 41102-1000 PRIME COAT, METHOD 1 SQYD 10,083 517 10,600
Y0360 41105-0000 BLOTTER TON 15
Y0380 41201-0000 TACK COAT TON 4 1 5
Y0400 60901-0400 CURB, CONCRETE, 6-INCH DEPTH LNFT 344 16 360
Y0420 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 10
Y0440 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 10
Y0460 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 10
Y0480 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 10
Y0500 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 10
Y0520 62301-0000 GENERAL LABOR HOUR 20
-A ug -2
2:
P M
N
C O
\c ol m
0( 3)
\R oa dw ay
\E st im at es _S ch ed ul es
\E ng in ee r Es tim at es \1
_E st im at es
Es tim at e-
O pt
Y
FI
N
A L.
xl sx
]S he et SUMMARY OF QUANTITIES - Option Y
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B6CO FTNP COLM 10(3)CO
SHEET
NUMBER
Surfacing Summary
Riprap Summary
Miscellaneous Summary
Miscellaneous Summary
Permanent Sign Summary
Pavement Markings Summary
ALLOWANCE Bid Schedule
Y0540 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 10
Y0560 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 10
Y0580 63301-0000 SIGN SYSTEM EACH 16 2 18
Y0600 63309-0000 DELINEATOR EACH 18 2 20
Y0620 63401-0700 PAVEMENT MARKINGS, TYPE D,
SOLID LNFT 30,684 1,536 32,220
Y0640 63501-1000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR LPSM ALL
Y0660 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 15
Y0680 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 4 10
Y0700 63505-1000 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS MILE 0.7
Y0720 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 630
Y0740 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 270
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A ug -2
2:
P M
N
C O
\c ol m
0( 3)
\R oa dw ay
\E st im at es _S ch ed ul es
\E ng in ee r Es tim at es \1
_E st im at es
Es tim at e-
O pt
Y
FI
N
A L.
xl sx
]S he et
2)
SUMMARY OF QUANTITIES - Option Y
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B7CO FTNP COLM 10(3)CO
SHEET
NUMBER
Sheet 1 of 4
B8
SUMMARIES
SURFACING
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts B S u m m S
U M
C
O L
M .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
Sheet 2 of 4
B9
SUMMARIES
RIPRAP
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts B S u m m S
U M
C
O L
M .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
SUMMARIES
MISCELLANEOUS
Sheet 3 of 4
B10
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts B S u m m S
U M
C
O L
M .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
SUMMARIES
MISCELLANEOUS
Sheet 4 of 4
B11
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts B S u m m S
U M
C
O L
M .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
SUMMARY
PERMANENT SIGN
B12
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts B S u m m S
U M
C
O L
M .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
SUMMARY
PERMANENT MARKINGS
B13
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts B S u m m S
U M
C
O L
M .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
.9
C
M P
.2
D I61
.5
2X3
.7
P
V C
.7
.7
.3
C
M P
.7
D I6189.02X3
.1
P
V C
STOP
STOP
61856
T R A S H
C
M P
.6
.5
D I
2X3
.2
06125
06130
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C1
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Begin paved ditch
23+65 Rt.
End paved ditch
26+23 Rt.
Begin paved ditch
31+14 Rt.
End paved ditch
31+58 Rt.
Cold Shivers Parking
Route 0915
EAST G
LAD
E PARK RO
AD
NOTE:
existing drop inlet
Do not disturb existing drop inlet
Do not disturb existing drop inlet
Do not disturb existing concrete curb
Do not disturb
Install Riprap Class 2
Install Riprap Class 2
See Special 609-A
2. Place Riprap at the end of the ditch before inlet culverts.
1. Do not disturb existing culverts.
Install Riprap Class 2
Guardrail
Remove and Replace
Install Riprap Class 2
Install Riprap Class 2
E: 2102821.666
N: 1450276.086
Sta. 20+00
Schedule A
Rim Rock Drive
Begin Route 010
Install Riprap Class 2
SCHEDULE A
20+00 to 48+00
PLAN SHEET
RIM ROCK DRIVE
Temporary Inlet Protection
Temporary Inlet Protection
See Detail C204-51
Subexcavation
Guardrail 21+22 to 25+22
Remove and Replace by Pay Item 40301-0200
Temporary Asphalt Concrete Pavement quantities will be paid
Removal of guardrail will be monitored by an archaelogist.
Inlet Protection
Install Temporary
.9
" C
M P
.2
DI59
.6
2X3
EDGE O
F S
TONE
3.2
18"
CMP
0.4
.7
C
M P
60+
60+
D
IR
E C
T
IO
N O
N L
Y
.4
.4
" C
M P
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
.9
" C
M P
.2
D I
5992.6
2X
85+
85+
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C2
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Begin paved ditch
54+94 Rt.
End paved ditch
58+81 Rt.
Begin paved ditch
59+93 Lt.
End paved ditch
62+79 Lt.
Begin paved ditch
61+40 Rt.
End paved ditch
62+73 Rt.
Begin paved ditch
65+86 Lt.
End paved ditch
68+15 Lt.
Begin paved ditch
76+38 Rt.
Typical Section
See Historic Stone Wall
62+55 to 67+36
NOTE:
Do not disturb boulders existing drop inlet
Do not disturb
2.
1.
See Special 609-A
Place Riprap at the end of the ditch before inlet culverts.
Do not disturb existing culverts.
48+00 to 76+00
SCHEDULE A
PLAN SHEET
RIM ROCK DRIVE
Install Riprap Class 2
Install Riprap Class 2
Do not disturb existing drop inlet
Install Riprap Class 2
Install Riprap, Class 2
Install fiber logs at the outlet pipe inlet pipe
Install fiber logs at the
Install Riprap Class 2
Install Temporary Inlet Protection
.1
.1
C M P
0 M
A G N
A
IL
O C
R W
A L L
C
M P
.7
D I
5818.3 42"
D I R
E C
T I O
N O
N L
Y
.2
C
M P
.7
D I 2
X
.3
X
X
X
X
X
X
C
M P
5810 5815 5
5905 5
2 S
P
IK
E
.9
C
M P
.6
S P
IK
E
R E S
E X
.1
C M P
C
M P
.7
.2
X
X
X
X
X
X
57305735
5 5955
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C3
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Begin paved ditch
76+38 Rt.
Trail Parking
Upper Serpent's
Route 0916
Begin 6" concrete curb
Begin removal of asphalt curb
84+00 Lt.
End 6" concrete curb
End removal of asphalt curb
87+25 Lt.
Begin 6" concrete curb
Begin removal of asphalt curb
88+81 Rt.
End 6" concrete curb
End removal of asphalt curb
92+48 Rt.
Begin 6" concrete curb
Begin removal of asphalt curb
94+30 Lt. & Rt.
End 6" concrete curb
End removal of asphalt curb
99+50 Lt. & Rt.
Begin paved ditch
100+92 Lt.
End paved ditch
77+87 Rt.
End paved ditch
102+67 Lt.
NOTE:
inlet (typ.)
existing drop
Do not disturb
Do not disturb boulders
2.
1.
76+00 to 104+00
SCHEDULE A
PLAN SHEETS
RIM ROCK DRIVE
See Special 609-A
Place Riprap at the end of the ditch before inlet culverts.
Do not disturb existing culverts.
Install Riprap Class 2
Temporary Inlet Protection
Install Riprap Class 2
Temporary Inlet Protection
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2 existing guardrail (typ.)
Remove and replace existing guardrail
Remove and replace
.2
C M
P .9
2 S
P I K
E
0 5
5 5
5 5
5655 566056
56705675
05680
5700 5
.5
C
M P
.7
.4
C
M P
X
D I R O
N L
Y
.8
.2
C
M P
S A N
D C
A N
D
IR
O
N L
Y
.9
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C4
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Begin paved ditch
108+82 Lt.
End paved ditch
113+62 Lt.
End 6" concrete curb
End removal of asphalt curb
118+26 Rt.
Begin 6" concrete curb
Begin removal of asphalt curb
121+87 Lt.
End 6" concrete curb
End removal of asphalt curb
125+69 Lt.
Begin 6" concrete curb
Begin removal of asphalt curb
113+79 Rt.
NOTE:
2.
1.
See Special 609-A
Place Riprap at the end of the ditch before inlet culverts.
Do not disturb existing culverts.
Guardrail
Remove and Replace
Install Riprap Class 2 Install Riprap Class 2Guardrail
Remove and Replace
Guardrail
Remove and Replace
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2 of the pipe.
Install Fiber Logs at the inlet of the pipe.
Install Fiber Logs at the inlet
104+00 to 132+00
SCHEDULE A
PLAN SHEETS
RIM ROCK DRIVE
Class 2
Install Riprap Class 2
Install Riprap of the pipe.
Install fiber logs at the outlet by Pay Item 40301-0200.
Temporary Asphalt Concrete Pavement will be paid
See Detail C204-51
Subexcavation
" C
MP
.3
.5
.4
.2
C
M P
.8
.2
C M P
X
X
X
X X X
X
.7
X
.5
C
M P
.5
C
M P
.7
54105
55430
145+00
.7
.1
" C
M P
5305.4
24" C M P
.1
" PV
C
D
IR
O
N
LY S
ILTE
D
IN
D
IR
O
N
LY N
O O
U
TLET FN
D
3 2 1
.9
.9
" C
M P
" C
M P
.3
.5
55390
0 1
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C5
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Begin paved ditch
141+71 Lt.
End paved ditch
145+76 Lt.
Begin paved ditch
146+82 Lt.
End paved ditch
148+29 Lt.
Begin paved ditch
153+12 Rt.
End paved ditch
158+32 Rt.
Begin 6" concrete curb
Begin removal of asphalt curb
157+10 Rt.
End 6" concrete curb
End removal of asphalt curb
158+17 Rt.
Do not disturb boulders
Install Riprap Class 2
132+00 to 160+00
SCHEDULE A
PLAN SHEETS
RIM ROCK DRIVE
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2 existing guardrail
Remove and replace of the pipe.
Install Fiber Logs at the inlet of the pipe.
Install fiber logs at the inlet of the pipe.
Install Fiber Logs at the inlet of the pipe.
Install Fiber Logs at the inlet of the pipe.
Install Fiber Logs at the inlet
Install Riprap Class 2 Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Do not disturb paved ditch with sidewalk outlet of the pipe.
Install fiber logs at the
Install fiber logs at the outlet of the pipe.
of the pipe.
Install fiber logs at the outlet
Install fiber logs at the outlet of the pipe.
the outlet of the pipe
Install fiber logs at
65'x10'x1'
Sta. 155+20 to 156+18
Place Riprap at this location
NOTE:
4. Removal of paved ditch will be by Pay Item 20303-1600.
3. Remove existing river rocks from ditches as directed by the CO.
2. Place Riprap at the end of the ditch before inlet culverts.
1. Do not disturb existing culverts.
Remove paved ditch
.5
" C
M P
.6
.9
C
M P
.9
C
M P
.8
.6
.5
C
M P
.7
5170 5
05225
05240
165+00
175+00
165+00
175+00
.5
.2
.1
C
M P
.6
" C
MP
.5
" C
M P
.6
.6
.5
" C
M P
C
M P
.8
52351
175+00
175+00
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C6
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Begin 6" concrete curb
Begin removal asphalt curb
164+29 Lt.
End 6" concrete curb
End removal asphalt curb
167+60 Lt.
Begin 6" concrete curb
Begin removal asphalt curb
172+39 Rt.
Begin paved ditch
End 6" concrete curb
End removal asphalt curb
173+08 Rt.
Begin 6" concrete curb
Begin removal asphalt curb
175+88 Rt.
End 6" concrete curb
End removal asphalt curb
End paved ditch
176+82 Rt.
Begin paved ditch
178+13 Lt.
End paved ditch
182+75 Lt.
NOTE:
2.
1.
160+00 to 188+00
SCHEDULE A
PLAN SHEETS
RIM ROCK DRIVE
Install Riprap Class 2 existing guardrail
Remove and Replace
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2 existing guardrail
Remove and replace
See Special 609-A
Place Riprap at the end of the ditch before inlet culverts.
Do not disturb existing culverts.
Install fiber logs at the inlet of the pipe.
Install fiber logs at the outlet of the pipe outlet of the pipe
Install fiber logs at the
P O S S
IB
L E O
U T L E T N
O P
IP
E S
E E
N
.9
C
M P
.4
P O S S
IB
L E N
O P
IP
E S
E E
N
D I R O
N L
Y N
O P I P E F
N D
.5
" C
M P
10X15
.2
15X15
.6
C
M P
5090 5
C
M P
.3
.3
.0
.3
C
M P
5024.6
CRUSHED
5027.4
18" CMP
5028.4
S T
O P
5032.5
24" CM
P
5039.1 5039.9
10" CMP
3 2 1
5055505
0+
0+
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C7
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Begin paved ditch
190+62 Lt.
End paved ditch
195+92 Lt.
Area Road
Devil's Kitchen Picnic
Route 0202
NOTE:
A
2.
1.
Sta. 188+00
Begin Option X
End Shedule A
188+00 to 216+00
OPTION X
PLAN SHEETS
RIM ROCK DRIVE
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
See Special 609-A.
Place Riprap at the end of the ditch before the culverts.
Remove existing culverts.
Remove and replace culvert
Install fiber logs at the inlet of the pipe
Install fiber logs at the outlet of the pipe inlet of the pipe
Install fiber logs at the outlet of the pipe
Install fiber logs at the
Install Riprap Class 2
Trail Parking (Devil's Kitchen)
Lower Serpent's
Route 0917
S T
O N
E S I G
N B
A S
E S
T O
N E S I G
N B
A S
E
T
4950.6
15" CMP
4951.6 S
T
O P L
IG
H T
A I R C
O N
D I T I O
N E
R
S T
O P L
IG
H T
F L A
G P
O L E
STONE SIGN BASE
4959.1
F L A
G P
O L
EF
L A
G P
O L E
4962.0
21" CMP
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C8
200'100'0
Scale in Feet
Sheet D1
See East Entrance Plan
Pay Station
East Entrance
East Shop Road
Route 0402
East Entrance Parking
Route 0928
East Entrance Sign Parking
Route 0933
NOTE:
A
2.
1.
Potential Staging Area
E: 2111019.980
N: 1453329.679
Sta. 225+47
Option X
Rim Rock Drive
End Route 010
Place Riprap at the end of the ditch before inlet culverts. See Special 609-A.
Do not disturb existing culverts.
216+00 to 225+47
OPTION X
PLAN SHEETS
RIM ROCK DRIVE
Install Riprap Class 2
.0
.5
C
M P
.2
.5
C
M P
.4
.0
C
M P
U P6 .4
U
S W
E S
T C
O M
M U
N I C
A T I O
N S
63706375
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C9
200'100'0
Scale in Feet
200'100'0
Scale in Feet
NOTE:
2.
1.
1000+00 to 1028+00
OPTION Y
PLAN SHEET
EAST GLADE PARK ROAD
See Special 609-A
Place Riprap at the end of the ditch before inlet culverts.
Do not disturb existing culverts.
Begin Option Y
E: 2102398.723
N: 1447415.008
Sta. 1000+00
East Glade Park Road
Begin Route 011 of the pipe.
Install fiber logs at the inlet
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2 outlet of the pipe
Install fiber logs at the
STOP
STOP
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C10
200'100'0
Scale in Feet
Begin 6" concrete curb
Begin removal asphalt curb
1031+08 Lt.
End 6" concrete curb
End removal asphalt curb
1034+92 Lt.
1037+00 to 1038+30 included with
Quantities
1028+00 to 1038+30
OPTION Y
PLAN SHEET
EAST GLADE PARK ROAD
End Option Y
E: 2103130.379
N: 1450436.898
Sta. 1038+30
East Glade Park Road
End Route 011
Schedule A
Install Riprap Class 2
Schedule A
Subexcavation
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P la n
.d g n
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
.9
BU
M P
.2
C
M P
B U
M P
P O
T
.0
P O
T
.6
-4.889%
,4
.2
,4
.4
Elev= 6405.282
Sta= 2001+70.000
Elev= 6410.282
Sta= 2001+60.000
Elev= 6415.282
Sta= 2001+50.000
Elev= 6420.282
Sta= 2001+40.000
Elev= 6425.282
Sta= 2001+30.000
Elev= 6430.282
Sta= 2001+20.000
Elev= 6435.282
Sta= 2001+10.000
Elev= 6405.282
Sta= 2002+00.000
Elev= 6410.282
Sta= 2002+10.000
Elev= 6415.282
Sta= 2002+20.000
Elev= 6420.282
Sta= 2002+30.000
Elev= 6425.282
Sta= 2002+40.000
Elev= 6430.282
Sta= 2002+50.000
100'50'0
Scale in Feet
C11
2000+00 2001+00 2002+00 2003+00 2004+00 2005+00
Existing ground
Profile grade pavement elevation
Match existing pavement elevation
Match existing
Ditch reconditioning E = 2082831.647
N = 1464482.924
SCHEDULE A
Sta. 2002+50
END RSS & SITE REPAIR
E = 2082682.463
N = 1464365.163
SCHEDULE A
Sta. 2000+50
BEGIN SITE REPAIR
E = 2082760.939
N = 1464427.142
SCHEDULE A
Sta. 2001+50
BEGIN RSS REPAIR
Install Riprap Class 2
Remove existing culvert
Cut and Fill Limits
RSS limits
3. Do not work in stream.
incorporate or waste it as directed by the CO.
2. Remove existing Riprap from slope and
1. Remove existing culvert
NOTE:
Centerline elevation= 6426.70 Refer to the Cross sections
Riprap Class 2, Rt.
End section, Rt.
Headwall, Lt.
Install 36"x73' pipe culvert
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P la n
.d g n
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
6348.9
6355.0
27" C M P
C O
N C
636063
P O
T
.0
P C
.4
P T
.9
P C
.9
P T 3004+59.60
+0
P O T
5+ .4
,3
.5
V P I
E L
,3
.9
-4.637%
-5.405%
150' VC
V P I
E L
,3
.4
-5.405%
-4.424%
200' VC
,3
.2
100'50'0
Scale in Feet
C12
See sheet F1 subexcavation
Full width
3000+00 3001+003000+50 3001+50 3002+00 3002+50 3003+00 3003+50 3004+00 3004+50 3005+00 3005+50
Profile grade
Existing ground
E = 2083581.821
N = 1465141.617
3001+00
Schedule A
BEGIN SITE REPAIR
E= 2083540.431
N= 1465383.845
Schedule A
3003+50
END SITE REPAIR
Subexcavation limits
50'25'0
Scale in Feet monument sign, do not disturb
Existing Rim Rock Drive existing asphalt pavement
Saw cut and remove surround of entry station to existing concrete curb
Tie concrete drive pad
D1 do not disturb
Existing entry station, NOTE:
Utilities present around entry station, locations and depths unknown.1.
OPTION X
PLAN
EAST ENTRANCE
see Standards 501-1 and 501-2
Concrete drive pad, 10" depth
70'
TYPICAL SECTION CONCRETE PAD
See Special 636-A. Exact location as directed by the CO.
Install Inductive Traffic Loop
Roadway Aggregate, Method 2
Minor Concrete Pavement, Reinforced
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts D
M in o r P
P P
L N
E a s tE n tr a n c e S ta ti o n .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
T
F L A
G P
O L E
STONE SIGN BASE
F L A
G P
O L E
DROP INLET PROTECTION (TYPE C)
PREFABRICATED FILTER INSERTDROP INLET PROTECTION (TYPE A)
SEDIMENT LOG
Back of curb
Face of curb
1-bag high
Spillway
PLAN VIEW - INLET AT SAG
high
1-bag
Spillway
B
B
SECTION A-A
Sediment log in full contact with the ground
Drop inlet grate
PLAN VIEW - INLET ON GRADE
Flow
Face of curb
Back of curb
Flow
1-bag high
Spillway basin
Catch
SECTION B-B
onto curb bags overlap
Gravel filled
A
A Drop inlet grate
PLAN
Drop inlet
DROP INLET PROTECTION (TYPE B)
GRAVEL BAG BERM
Flow
(stacked tightly)
Gravel filled bags
Spillway (beyond)
Drop inlet
Flow Flow
Drop inlet grate
See Note 5
2-bags high
Gravel filled bags
See Note 5
2-bags high
Gravel filled bags
See Note 6
Accumulated sediment
Accumulated sediment
Sediment log
Drop inlet grate
Expansion restraint
Prefabricated filter insert
Dump straps (2 each)
Lifting loops (2 each)
Drop inlet
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts E C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
U.S. DEPARTMENT OF TRANSPORTATION
REVISED:
DETAIL
U.S. CUSTOMARY DETAIL
DETAIL APPROVED FOR USE
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
Sheet 1 of 2
NOTE:
9" ø min. sediment log
1" x 1" or 1" ø wood stake. See Note 2.
5.
4.
3.
2.
1.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAILDETAIL APPROVED FOR USE
REVISED: 08/2014
3" in diameter.
with clean, silt-free coarse aggregate between 2" and bags. Cover geotextile fabric to the top of the fabric geotextile fabric a minimum of 18" upstream of the the next layer of bags on top of it. Extend the to the spillway elevation. Anchor the fabric by placing face of the bags. Place fabric over the top of the bags geotextile filter, class 2, type C along the upstream bags. Where tight fit is unachievable, install ensure no sediment flows between or underneath the
Pack gravel filled bags tightly together end to end to of curb minus 1".
Maximum top of gravel bag spillway elevation = Top
12" x 18".
Approximate finished dimension of gravel bags is undisturbed soil.
than 24" on center. Drive stakes 12" (min.) into
Install sediment logs with stakes spaced no more as approved by the CO.
Select the inlet protection device to fit field conditions
PROTECTION
TEMPORARY INLET
C157-51
E1
SECTION C-C
Overflow water
Filtered
DROP INLET PROTECTION (TYPE D1)
BLOCK AND GRAVEL
E
E
SECTION E-E
Curb and gutter
Filtered water
Accumulated sediment
Curb inlet See Note 2 Inlet protection device
PLAN
See Note 1
Wire mesh
Drop inlet with grate
Filtered water
Sediment laden runoff
Accumulated sediment
Curb inlet
Curb inlet
Sediment laden runoff
Accumulated sediment
Overflow
Curb inlet
SECTION D-D
D
D
CURB INLET PROTECTION (TYPE D2)
BLOCK AND GRAVEL
See Note 1
Gravel filter
See Note 1
Wire mesh
CURB INLET PROTECTION (TYPE E)
INLET PROTECTION DEVICE
CC
Wire mesh
See Note 2 Inlet protection device
See Note 1
Gravel filter
Wire mesh
STATE PROJECT
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts E C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
REVISED:
DETAIL APPROVED FOR USE
U s e r r o x a n n ie .g o n z a le z
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
PROTECTION
TEMPORARY INLET
Sheet 2 of 2
C157-51
E2
12" min.
FIBER ROLL
Maximum spacing (ft)
9" Ø Fiber Roll
2" min.
Trench
Flow
12" min.
C le a r in g
L im it
S lo p ta k e
INSTALLATION DETAIL
FIBER ROLL AS PERIMETER CONTROL
Trench 2" min.
uphill side of fiber roll
Place excavated material on
STATE PROJECT
NUMBER
SHEET
P
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts E C .d g n
U s e r r o x a n n ie .g o n z a le z
AT CULVERT OUTLET
FIBER ROLL
See Note 3 outlets fiber rolls around culvert
Install 2 - 9" Ø min. x 10'
See no te 3 flared end section
Culvert inlet with
See no te 3
AT CULVERT INLET
FIBER ROLL
flared end section
Culvert outlet with inlets fiber rolls around culvert
Install 3 - 9" Ø min. x 10'
E3
157-A fiber roll rather than under it.
roll to ensure storm water is forced to flow through
Tamp soil backfill against upstream side of fiber continuous contact with trench bottom and sides.
parallel to the contour. Place fiber rolls in
For fiber rolls on bare soil, construct trenches of fiber roll.
12" deep. Expose stakes 2" above top
Drive stakes into undisturbed soil at least
Stake fiber rolls at each end.
1" Ø wood stakes. Space stakes 4' o.c. max.
Stake fiber rolls in place with 1" x 1" or roll to vary more than 5% from level.
20' section of fiber roll, do not allow the fiber
Install fiber rolls along slope contours. For any prior to installation.
Repair all rills or gullies and properly compact
5.
4.
3.
2.
1.
Flow
D ire c tio n o f ru n o ff
Flow
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
FIBER ROLL JOINT DETAIL
FIBER ROLL SLOPE…