Amendment_A001.pdf
PDF 5 MB Posted
- Attached to
- CO FTNP COLM 10(3), Rim Rock Drive
- Solicitation number
- DTFH6817B00018
About this file
Amendment A001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CO.FTNP.COLM.10(3).Rim_Rock_Drive_Spot_Repairs.2017.pdf | ||
| CO_FTNP_COLM_10(3)_Pavement_Report.pdf | ||
| CO_COLM10(3)_FINAL.pdf | ||
| DTFH6817B00018_IFB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force a nd effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
1 11
A001 10/23/2017 CO FTNP COLM
6905001
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENU, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENU, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION:
DTFH6817B00018
09/28/2017
0*
* See Below
Invitation for Bid Delete Pages A-7 & A-14, replace with Pages A-7 & A-14 dated 10/23/17.
Plan Sheets Delete Sheets B2, B6, B10, C3, C4, C5, C6 and C10, replace with Sheets B2, B6, B10, C3, C4, C5, C6 and C10 dated 10/23/17.
NOTE: When printing revised sheets, turn on 'Document and Markups' in the Print Properties menu to illustrate changes on hard copy print.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO SF-1442, PAGE A-2, OF THE SOLICITATION)
B I D S C H E D U L E Schedule A Account: ALL
Project No: CO CO FTNP COLM10(3)
Name: Rim Rock Drive CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
20720-0100
Line A0360 1,275 SQYD $ $
20720-0200
Line A0380 3,600 SQYD $ $
25101-0200
Line A0400 160 CUYD $ $
30202-2000
Line A0420 1,300 TON $ $
30302-1000
Line A0440 50 LNFT $ $
30401-5300
Line A0460 3.064 MILE $ $
40101-5600
Line A0480 8,100 TON $ $
40105-3000
Line A0500 85 TON $ $
40301-0200
Line A0520 530 TON $ $
40601-0000
Line A0540 20 TON $ $
41102-1000
Line A0560 51,700 SQYD $ $
41105-0000
Line A0580 72 TON $ $
41201-0000
Line A0600 25 TON $ $
60103-0180
Line A0620 1 EACH $ $
60201-1000
Line A0640 80 LNFT $ $
60210-1000
Line A0660 1 EACH $ $
60901-1000
Line A0680 3,000 LNFT $ $
CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT
36-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
REINFORCEMENT GEOSYNTHETIC, TYPE 2
PLACED RIPRAP, METHOD A, CLASS 2
ROADWAY AGGREGATE, METHOD 2
ANTISTRIP ADDITIVE, TYPE 3
ASPHALT CONCRETE PAVEMENT, TYPE 2
FOG SEAL
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
DITCH RECONDITIONING
FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
REINFORCEMENT GEOSYNTHETIC, TYPE 1
CURB, CONCRETE, 12-INCH DEPTH
Amendment A001 10/23/2017
B I D S C H E D U L E Option Y Account: ALL
Project No: CO CO FTNP COLM 10(3)
Name: RIM ROCK DRIVE CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
Line Y0360 15 TON $ $
41201-0000
Line Y0380 5 TON $ $
60901-1000
Line Y0400 360 LNFT $ $
62201-0200
Line Y0420 10 HOUR $ $
62201-0550
Line Y0440 10 HOUR $ $
62201-0950
Line Y0460 10 HOUR $ $
62201-2850
Line Y0480 10 HOUR $ $
62201-3350
Line Y0500 10 HOUR $ $
62301-0000
Line Y0520 20 HOUR $ $
62302-1000
Line Y0540 10 HOUR $ $
62302-1100
Line Y0560 10 HOUR $ $
63301-0000
Line Y0580 18 EACH $ $
63309-0000
Line Y0600 20 EACH $ $
63401-0700
Line Y0620 32,220 LNFT $ $
63501-1000
Line Y0640 ALL LPSM $
63502-0700
Line Y0660 15 EACH $ $
63502-1300
Line Y0680 10 EACH $ $
63505-1000
Line Y0700 0.73 MILE $ $
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
SPECIAL LABOR, HIRED SURVEY SERVICES
SIGN SYSTEM
DELINEATOR
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 12 FOOT MINIMUM BLADE
PAVEMENT MARKINGS, TYPE D, SOLID
TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
TEMPORARY TRAFFIC CONTROL, CONE
TACK COAT
CURB, CONCRETE, 12-INCH DEPTH
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
Sheet and Description
B8 B9 B10 B11 B12 B13
Surfacing Summary
Riprap Summary
Miscellaneo us
Summary
Miscellaneo us
Summary
Permanent Signs
Summary
Pavement Markings Summary
ALLOWANCE Bid Schedule
A0560 41102-1000 PRIME COAT, METHOD 1 SQYD 49,331 2,369 51,700
A0580 41105-0000 BLOTTER TON 72
A0600 41201-0000 TACK COAT TON 21 1 3 25
A0620 60103-0180 CONCRETE, HEADWALL FOR
36-INCH PIPE CULVERT EACH 1 1
A0640 60201-1000 36-INCH PIPE CULVERT LNFT 73 7 80
A0660 60210-1000 END SECTION FOR 36-INCH PIPE
CULVERT EACH 1 1
A001 A0680 60901-1000 CURB, CONCRETE, 12-INCH DEPTH LNFT 2,866 134 3,000
A0700 61701-4350 GUARDRAIL SYSTEM CRG, TYPE 4,
CLASS B LNFT 62 62
A0720 61701-5100 GUARDRAIL SYSTEM MGS, TYPE 4,
CLASS B STEEL POSTS LNFT 350 5 355
A0740 61701-5150 GUARDRAIL SYSTEM MGS, TYPE 4,
CLASS B WOOD POSTS LNFT 3,666 74 3,740
A0760 61702-0400 TERMINAL SECTION, TYPE G4-CRT EACH 1 1
A0780 61702-1500 TERMINAL SECTION, TYPE MGS
TANGENT EACH 26 4 30
A0800 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 60
A0820 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 60
A0840 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 30
A0860 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 60
A0880 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 20
A0900 62301-0000 GENERAL LABOR HOUR 60
A0920 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 40
A0940 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 40
A0960 62405-0400 PLACING CONSERVED TOPSOIL,
6-INCH DEPTH SQYD 300 15 315
A0980 63301-0000 SIGN SYSTEM EACH 21 1 22
A1000 63309-0000 DELINEATOR EACH 320 25 345
A1020 63401-0700 PAVEMENT MARKINGS, TYPE D,
SOLID LNFT 143,032 2,768 145,800
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-O ct -2
9:
A M
N
C O
\c ol m
0( 3)
\P ro je ct
M an ag er s\
A dv er tis em en t\
.2 E
E (S ch ed ul es
O pt io ns
A m ou nt s)
Es tim at e-
_S ch ed
A
F
IN
A L
A
1.
xl sx ]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B2CO FTNP COLM10(3)CO
SHEET
NUMBER
NPS PMIS No. 187947, 187951, 187951 NPS Drwg No. 119-130017
Sheet and Description
B8 B9 B10 B11 B12 B13
Surfacing Summary
Riprap Summary
Miscellaneous Summary
Miscellaneous Summary
Permanent Sign Summary
Pavement Markings Summary
ALLOWANCE Bid Schedule
Y0020 15101-0000 MOBILIZATION LPSM ALL
Y0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
Y0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Y0080 15401-0000 CONTRACTOR TESTING LPSM ALL
Y0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
Y0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 50 5 55
Y0140 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
Y0160 20301-0700 REMOVAL OF DELINEATOR EACH 14 1 15
Y0180 20301-2400 REMOVAL OF SIGN EACH 9 1 10
Y0200 20302-0400 REMOVAL OF CURB, ASPHALT LNFT 344 16 360
Y0220 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 9 1 10
Y0240 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 88 20 12 120
Y0260 30401-5300 FULL DEPTH RECLAMATION,
METHOD 2, 6-INCH DEPTH MILE 0.725 0.725
Y0280 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL TON 2,088 102 2,190
Y0300 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 21 1 22
Y0320 40601-0000 FOG SEAL TON 4 1 5
Y0340 41102-1000 PRIME COAT, METHOD 1 SQYD 10,083 517 10,600
Y0360 41105-0000 BLOTTER TON 15
Y0380 41201-0000 TACK COAT TON 4 1 5
A001 Y0400 60901-1000 CURB, CONCRETE, 12-INCH DEPTH LNFT 344 16 360
Y0420 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 10
Y0440 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 10
Y0460 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 10
Y0480 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 10
Y0500 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 10
Y0520 62301-0000 GENERAL LABOR HOUR 20
-O ct -2
9:
A M
N
C O
\c ol m
0( 3)
\P ro je ct
M an ag er s\
A dv er tis em en t\
.2 E
E (S ch ed ul es
O pt io ns
A m ou nt s)
Es tim at e-
O pt
Y
FI
N
A L
A
1.
xl sx ]S he et
SUMMARY OF QUANTITIES - Option Y
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B6CO FTNP COLM 10(3)CO
SHEET
NUMBER
NPS PMIS No. 187947,187950,187951 Drawing No. 119-130017
SUMMARIES
MISCELLANEOUS
Sheet 3 of 4
B10
AMENDMENT A001
1 10/23/17 Changed pay item to 60901-1000 Curb Concrete, 12-Inch Depth
REVISED 10/23/17
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts B S u m m S
U M
C
O L
M .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
.1
.1
C M P
0 M
A G N
A
IL
O C
R W
A L L
C
M P
.7
D I
5818.3 42"
D I R
E C
T I O
N O
N L
Y
.2
C
M P
.7
D I 2
X
.3
X
X
X
X
X
X
C
M P
5810 5815 5
5905 5
2 S
P
IK
E
.9
C
M P
.6
S P
IK
E
R E S
E X
.1
C M P
C
M P
.7
.2
X
X
X
X
X
X
57305735
5 5955
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C3
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Begin paved ditch
76+38 Rt.
Trail Parking
Upper Serpent's
Route 0916
Begin paved ditch
100+92 Lt.
End paved ditch
77+87 Rt.
End paved ditch
102+67 Lt.
NOTE:
inlet (typ.)
existing drop
Do not disturb
Do not disturb boulders
2.
1.
76+00 to 104+00
SCHEDULE A
PLAN SHEETS
RIM ROCK DRIVE
See Special 609-A
Place Riprap at the end of the ditch before inlet culverts.
Do not disturb existing culverts.
Install Riprap Class 2
Temporary Inlet Protection
Install Riprap Class 2
Temporary Inlet Protection
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2 existing guardrail (typ.)
Remove and replace existing guardrail
Remove and replace
Begin 12" concrete curb
Begin removal of asphalt curb
84+00 Lt.
End 12" concrete curb
End removal of asphalt curb
87+25 Lt.
End 12" concrete curb
End removal of asphalt curb
92+48 Rt.
Begin 12" concrete curb
Begin removal of asphalt curb
88+81 Rt.
AMENDMENT A001
REVISED 10/23/17
10/23/17 Changed callout to 12" concrete curb
Begin 12" concrete curb
Begin removal of asphalt curb
94+30 Lt. & Rt.
End 12" concrete curb
End removal of asphalt curb
99+50 Lt. & Rt.
.2
C M
P .9
2 S
P I K
E
0 5
5 5
5 5
5655 566056
56705675
05680
5700 5
.5
C
M P
.7
.4
C
M P
X
D I R O
N L
Y
.8
.2
C
M P
S A N
D C
A N
D
IR
O
N L
Y
.9
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C4
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Begin paved ditch
108+82 Lt.
End paved ditch
113+62 Lt.
NOTE:
2.
1.
See Special 609-A
Place Riprap at the end of the ditch before inlet culverts.
Do not disturb existing culverts.
Guardrail
Remove and Replace
Install Riprap Class 2 Install Riprap Class 2Guardrail
Remove and Replace
Guardrail
Remove and Replace
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2 of the pipe.
Install Fiber Logs at the inlet of the pipe.
Install Fiber Logs at the inlet
104+00 to 132+00
SCHEDULE A
PLAN SHEETS
RIM ROCK DRIVE
Class 2
Install Riprap Class 2
Install Riprap of the pipe.
Install fiber logs at the outlet by Pay Item 40301-0200.
Temporary Asphalt Concrete Pavement will be paid
See Detail C204-51
Subexcavation
Begin 12" concrete curb
Begin removal of asphalt curb
113+79 Rt.
End 12" concrete curb
End removal of asphalt curb
118+26 Rt.
Begin 12" concrete curb
Begin removal of asphalt curb
121+87 Lt.
End 12" concrete curb
End removal of asphalt curb
125+69 Lt.
AMENDMENT A001
10/23/17 Changed callout to 12" concrete curb1
REVISED 10/23/17
" C
MP
.3
.5
.4
.2
C
M P
.8
.2
C M P
X
X
X
X X X
X
.7
X
.5
C
M P
.5
C
M P
.7
54105
55430
145+00
.7
.1
" C
M P
5305.4
24" C M P
.1
" PV
C
D
IR
O
N
LY S
ILTE
D
IN
D
IR
O
N
LY N
O O
U
TLET FN
D
3 2 1
.9
.9
" C
M P
" C
M P
.3
.5
55390
0 1
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C5
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Begin paved ditch
141+71 Lt.
End paved ditch
145+76 Lt.
Begin paved ditch
146+82 Lt.
End paved ditch
148+29 Lt.
Begin paved ditch
153+12 Rt.
End paved ditch
158+32 Rt.
Do not disturb boulders
Install Riprap Class 2
132+00 to 160+00
SCHEDULE A
PLAN SHEETS
RIM ROCK DRIVE
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2 existing guardrail
Remove and replace of the pipe.
Install Fiber Logs at the inlet of the pipe.
Install fiber logs at the inlet of the pipe.
Install Fiber Logs at the inlet of the pipe.
Install Fiber Logs at the inlet of the pipe.
Install Fiber Logs at the inlet
Install Riprap Class 2 Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Do not disturb paved ditch with sidewalk outlet of the pipe.
Install fiber logs at the
Install fiber logs at the outlet of the pipe.
of the pipe.
Install fiber logs at the outlet
Install fiber logs at the outlet of the pipe.
the outlet of the pipe
Install fiber logs at
65'x10'x1'
Sta. 155+20 to 156+18
Place Riprap at this location
NOTE:
4. Removal of paved ditch will be by Pay Item 20303-1600.
3. Remove existing river rocks from ditches as directed by the CO.
2. Place Riprap at the end of the ditch before inlet culverts.
1. Do not disturb existing culverts.
Remove paved ditch
Begin 12" concrete curb
Begin removal of asphalt curb
157+10 Rt.
End 12" concrete curb
End removal of asphalt curb
158+17 Rt.
AMENDMENT A001
1 10/23/17 Changed callout to 12" concrete curb
REVISED 10/23/17
.5
" C
M P
.6
.9
C
M P
.9
C
M P
.8
.6
.5
C
M P
.7
5170 5
05225
05240
165+00
175+00
165+00
175+00
.5
.2
.1
C
M P
.6
" C
MP
.5
" C
M P
.6
.6
.5
" C
M P
C
M P
.8
52351
175+00
175+00
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C6
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Begin paved ditch
178+13 Lt.
End paved ditch
182+75 Lt.
NOTE:
2.
1.
160+00 to 188+00
SCHEDULE A
PLAN SHEETS
RIM ROCK DRIVE
Install Riprap Class 2 existing guardrail
Remove and Replace
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2
Install Riprap Class 2 existing guardrail
Remove and replace
See Special 609-A
Place Riprap at the end of the ditch before inlet culverts.
Do not disturb existing culverts.
Install fiber logs at the inlet of the pipe.
Install fiber logs at the outlet of the pipe outlet of the pipe
Install fiber logs at the
Begin 12" concrete curb
Begin removal asphalt curb
164+29 Lt.
End 12" concrete curb
End removal asphalt curb
167+60 Lt.
Begin 12" concrete curb
Begin removal asphalt curb
172+39 Rt.
Begin paved ditch
End 12" concrete curb
End removal asphalt curb
173+08 Rt.
Begin 12" concrete curb
Begin removal asphalt curb
175+88 Rt.
End 12" concrete curb
End removal asphalt curb
End paved ditch
176+82 Rt.
REVISED 10/23/17
AMENDMENT A001
1 10/23/17 Changed callout to 12" concrete curb
STOP
STOP
STATE PROJECT
A
M N C
O c o lm
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
CO
RIM ROCK DRIVE
CO FTNP COLM 10(3)
DRAWING NO.: 119-130017
187950, 187951
NPS PMIS NO.: 187947,
C10
200'100'0
Scale in Feet
1037+00 to 1038+30 included with
Quantities
1028+00 to 1038+30
OPTION Y
PLAN SHEET
EAST GLADE PARK ROAD
End Option Y
E: 2103130.379
N: 1450436.898
Sta. 1038+30
East Glade Park Road
End Route 011
Schedule A
Install Riprap Class 2
Schedule A
Subexcavation
End 12" concrete curb
End removal asphalt curb
1034+92 Lt.
Begin 12" concrete curb
Begin removal asphalt curb
1031+08 Lt.
AMENDMENT A001
1 10/23/17 Changed callout to 12" concrete curb
REVISED 10/23/17