NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Commerce City, Colorado 80022, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

THIS IS AN INVITATION FOR BID


The CO FLAP DEN 56(1) Access Connections to ROAR project is located in Adams County, Colorado, in the
Rocky Mountain Arsenal National Wildlife Refuge. The project is a series of trails, pedestrian bridges and parking
lots within the Refuge.


The general scope of improvements is construction of approximately 8.03 miles of a new multi-use trail described
as follows:


Approx. 7.73 miles of new crusher fines trail
Approx. 1105 feet of trail widening
Four prefabricated bridges (approx. 140 feet in length total)
Four paved parking areas with associated access road connections
Construction work includes linear grading, aggregate base, asphalt concrete pavement, drainage culvert
installation, bridgework, pavement markings, wooden fencing, utility relocation, traffic signal and signs.

Significant quantities include:
Schedule A:
20101-0000 Clearing and Grubbing: 3 ACRE
20420-0000 Embankment Construction: 3,000 CUYD
30201-2000 Roadway Aggregate, Method 2: 2000 CUYD
30202-2000 Roadway Aggregate, Method 2 (Crusher Fines) 28,000 SQYD
40301-0100 Asphalt Concrete Pavement: 750 TON
55101-1900 Steel H-Piles, 14X89, In Place: 640 LNFT
55201-0200 Structural Concrete, Class A (AE): 116 CUYD
55401-2000 Reinforcing Steel, Epoxy Coated: 18,900 LB
55504-0000 Pre-Fabricated Steel Bridge (Sand Creek Lateral): LPSM

55504-0000 Pre-Fabricated Steel Bridge (Uvalda Ditch): LPSM
55504-0000 Pre-Fabricated Steel Bridge (North High Line Canal): LPSM
55504-0000 Pre-Fabricated Steel Bridge (South High Line Canal): LPSM
61501-0100 Sidewalk, Concrete: 3,150 SQYD

Anticipated Schedule
Award: November 20, 2019
Construction: March, 2020 – August, 2020

Funding
The anticipated cost range is between $3 million and $4 million.

Update #2 ·

THIS IS AN INVITATION FOR BID

The CO FLAP DEN 56(1) Access Connections to ROAR project is located in Adams County, Colorado, in the Rocky Mountain Arsenal National Wildlife Refuge. The project is a series of trails, pedestrian bridges and parking lots within the Refuge.

The general scope of improvements is construction of approximately 8.03 miles of a new multi-use trail described as follows:

  • Approx. 7.73 miles of new crusher fines trail
  • Approx. 1105 feet of trail widening
  • Four prefabricated bridges (approx. 140 feet in length total)
  • Four paved parking areas with associated access road connections 

Construction work includes linear grading, aggregate base, asphalt concrete pavement, drainage culvert installation, bridgework, pavement markings, wooden fencing, utility relocation, traffic signal and signs.

 

Significant quantities include:

 

Schedule A:

  • 20101-0000 Clearing and Grubbing: 3 ACRE
  • 20420-0000 Embankment Construction: 3,000 CUYD
  • 30201-2000 Roadway Aggregate, Method 2: 2000 CUYD
  • 30202-2000 Roadway Aggregate, Method 2 (Crusher Fines) 28,000 SQYD
  • 40301-0100 Asphalt Concrete Pavement: 750 TON
  • 55101-1900 Steel H-Piles, 14X89, In Place: 640 LNFT
  • 55201-0200 Structural Concrete, Class A (AE): 116 CUYD
  • 55401-2000 Reinforcing Steel, Epoxy Coated: 18,900 LB
  • 55504-0000 Pre-Fabricated Steel Bridge (Sand Creek Lateral): LPSM
  • 55504-0000 Pre-Fabricated Steel Bridge (Uvalda Ditch): LPSM
  • 55504-0000 Pre-Fabricated Steel Bridge (North High Line Canal): LPSM
  • 55504-0000 Pre-Fabricated Steel Bridge (South High Line Canal): LPSM
  • 61501-0100 Sidewalk, Concrete: 3,150 SQYD

 

Anticipated Schedule

Award: November 20, 2019

Construction: March, 2020 – August, 2020

 

Funding

 

The anticipated cost range is between $3 million and $4 million.

 

Update #1 ·

THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENTATIVE ADVERTISEMENT DATE IS SEPTEMBER 18, 2019.

 

The CO FLAP DEN 56(1) Access Connections to ROAR project is located in Adams County, Colorado, in the Rocky Mountain Arsenal National Wildlife Refuge. The project is a series of trails, pedestrian bridges and parking lots within the Refuge.

 

The general scope of improvements is construction of approximately 7.97 miles of a new multi-use trail described as follows:

  • Approx. 7.73 miles of new crusher fines trail
  • Approx. 1105 feet of trail widening
  • Four prefabricated bridges (approx. 140 feet in length total)
  • Four paved parking areas with associated access road connections

 

Proposed construction work includes linear grading, aggregate base, asphalt concrete pavement, drainage culvert installation, bridgework, pavement markings, wooden fencing, utility relocation, traffic signal and signs.

 

Significant quantities include:

 

Schedule A:

  • 20101-0000 Clearing and Grubbing: 3 ACRE
  • 20420-0000 Embankment Construction: 3,000 CUYD
  • 30201-2000 Roadway Aggregate, Method 2: 2000 CUYD
  • 30202-2000 Roadway Aggregate, Method 2 (Crusher Fines) 28,000 SQYD
  • 40301-0100 Asphalt Concrete Pavement: 750 TON
  • 55101-1900 Steel H-Piles, 14X89, In Place: 640 LNFT
  • 55201-0200 Structural Concrete, Class A (AE): 116 CUYD
  • 55401-2000 Reinforcing Steel, Epoxy Coated: 18,900 LB
  • 55504-0000 Pre-Fabricated Steel Bridge (Sand Creek Lateral): LPSM
  • 55504-0000 Pre-Fabricated Steel Bridge (Uvalda Ditch): LPSM
  • 55504-0000 Pre-Fabricated Steel Bridge (North High Line Canal): LPSM
  • 55504-0000 Pre-Fabricated Steel Bridge (South High Line Canal): LPSM
  • 61501-0100 Sidewalk, Concrete: 3,150 SQYD

 

Anticipated Schedule

 

Advertise: September 18, 2019

Award: November 20, 2019

Construction: March, 2020 – August, 2020

 

Funding

 

The anticipated cost range is between $3 million and $4 million.

 

Attachments

Files attached to this notice, newest first
File Type Posted
Bid Tabulation CO FLAP DEN56(1) Access Connections to ROAR.pdf PDF
Bid_Opening_Summary_-__CO_FLAP_DEN_56(1)_Access_Connections_to_ROAR.pdf PDF
QnA_10.28.19.pdf PDF
Amendment_A002.pdf PDF
A001.pdf PDF
QnA_10.16.19.pdf PDF
RMA_Geotech_Report_20190627.pdf PDF
6982AF19B000013.pdf PDF
Access_Connections_to_ROAR_Final_Hydraulics_Report.pdf PDF
CO_FLAP_DEN56(1)_100__2019-9-10.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
CO FLAP DEN 56(1) Access Connections to ROAR Award Award Notice
CO FLAP DEN 56(1) Access Connections to ROAR This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity