Bid Tabulation CO FLAP DEN56(1) Access Connections to ROAR.pdf

PDF 619 KB Posted

Attached to
CO FLAP DEN 56(1) Access Connections to ROAR Federal contract opportunity
Solicitation number
6982AF19B000013
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to CO FLAP DEN 56(1) Access Connections to ROAR, newest first.
File Type Posted
Bid_Opening_Summary_-__CO_FLAP_DEN_56(1)_Access_Connections_to_ROAR.pdf PDF
QnA_10.28.19.pdf PDF
Amendment_A002.pdf PDF
A001.pdf PDF
QnA_10.16.19.pdf PDF
Access_Connections_to_ROAR_Final_Hydraulics_Report.pdf PDF
CO_FLAP_DEN56(1)_100__2019-9-10.pdf PDF
RMA_Geotech_Report_20190627.pdf PDF
6982AF19B000013.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 11/07/19

1 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF19B000013

Division: Central Federal Lands

State: CO County: Adams

Federal Land: Rocky Mountain Arsenal National Wildlife Refuge Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 11/06/19

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

ESCO Construction Co $2,952,704.14 3540 Evergreen Parkway Evergreen, CO 80439

American West Construction, Inc. $3,186,167.25 275 E 64th Ave.

Denver, CO 80221

Structures Inc. $3,566,424.50 4 Iverness Ct East, Suite 250 Englewood, CO 80112

Growling Bear Co. (Inc.) $3,783,747.36 2330 4th Ave.

Greeley, CO 80631

Kirkland Construction, LLLP $4,414,899.00 P.O. Box 580 Rye, CO 81069

Hartland-Reliant JV, LLC $4,986,922.25 854 South Charlo Dr.

Pueblo, CO 81007

Engineer's Estimate $2,950,000.00

2 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

ESCO Construction Co Lump Sum $101,430.00 American West Construction, Inc. Lump Sum $326,000.00 Structures Inc. Lump Sum $285,950.00 Growling Bear Co. (Inc.) Lump Sum $803,037.00 Kirkland Construction, LLLP Lump Sum $440,000.00 Hartland-Reliant JV, LLC Lump Sum $692,863.03 Engineer's Estimate ALL LPSM Lump Sum $338,883.00

A0040 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

ESCO Construction Co $7,760.00 $2,227.12 American West Construction, Inc. $10,000.00 $2,870.00 Structures Inc. $28,000.00 $8,036.00 Growling Bear Co. (Inc.) $8,363.00 $2,400.18 Kirkland Construction, LLLP $25,000.00 $7,175.00 Hartland-Reliant JV, LLC $11,130.38 $3,194.42 Engineer's Estimate 0.287 MILE $17,000.00 $4,879.00

A0060 15210-3000 CENTERLINE, VERIFICATION AND STAKING

ESCO Construction Co $1,440.00 $11,116.80 American West Construction, Inc. $2,400.00 $18,528.00 Structures Inc. $7,500.00 $57,900.00 Growling Bear Co. (Inc.) $2,000.00 $15,440.00 Kirkland Construction, LLLP $10,000.00 $77,200.00 Hartland-Reliant JV, LLC $2,662.01 $20,550.72 Engineer's Estimate 7.720 MILE $6,500.00 $50,180.00

A0080 15215-2000 SURVEY AND STAKING, BRIDGE

ESCO Construction Co $2,230.00 $8,920.00 American West Construction, Inc. $4,800.00 $19,200.00 Structures Inc. $3,400.00 $13,600.00 Growling Bear Co. (Inc.) $4,000.00 $16,000.00 Kirkland Construction, LLLP $10,000.00 $40,000.00 Hartland-Reliant JV, LLC $5,324.03 $21,296.12 Engineer's Estimate 4 EACH $5,000.00 $20,000.00

A0100 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

ESCO Construction Co $2,230.00 $20,070.00 American West Construction, Inc. $720.00 $6,480.00 Structures Inc. $980.00 $8,820.00 Growling Bear Co. (Inc.) $600.00 $5,400.00 Kirkland Construction, LLLP $5,000.00 $45,000.00 Hartland-Reliant JV, LLC $798.60 $7,187.40 Engineer's Estimate 9 EACH $850.00 $7,650.00

3 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0120 15215-7000 SURVEY AND STAKING, PARKING AREA

ESCO Construction Co $2,230.00 $13,380.00 American West Construction, Inc. $1,800.00 $10,800.00 Structures Inc. $1,550.00 $9,300.00 Growling Bear Co. (Inc.) $1,500.00 $9,000.00 Kirkland Construction, LLLP $10,000.00 $60,000.00 Hartland-Reliant JV, LLC $1,996.51 $11,979.06 Engineer's Estimate 6 EACH $3,500.00 $21,000.00

A0140 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

ESCO Construction Co $7,760.00 $2,227.12 American West Construction, Inc. $10,000.00 $2,870.00 Structures Inc. $27,500.00 $7,892.50 Growling Bear Co. (Inc.) $8,363.00 $2,400.18 Kirkland Construction, LLLP $20,000.00 $5,740.00 Hartland-Reliant JV, LLC $11,130.38 $3,194.42 Engineer's Estimate 0.287 MILE $9,000.00 $2,583.00

A0160 15301-0000 CONTRACTOR QUALITY CONTROL

ESCO Construction Co Lump Sum $11,390.00 American West Construction, Inc. Lump Sum $112,000.00 Structures Inc. Lump Sum $275,000.00 Growling Bear Co. (Inc.) Lump Sum $70,200.00 Kirkland Construction, LLLP Lump Sum $180,000.00 Hartland-Reliant JV, LLC Lump Sum $137,093.85 Engineer's Estimate ALL LPSM Lump Sum $17,000.00

A0180 15401-0000 CONTRACTOR TESTING

ESCO Construction Co Lump Sum $11,280.00 American West Construction, Inc. Lump Sum $104,000.00 Structures Inc. Lump Sum $260,000.00 Growling Bear Co. (Inc.) Lump Sum $53,349.00 Kirkland Construction, LLLP Lump Sum $180,000.00 Hartland-Reliant JV, LLC Lump Sum $111,804.69 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

A0200 15501-0000 CONSTRUCTION SCHEDULE

ESCO Construction Co Lump Sum $2,850.00 American West Construction, Inc. Lump Sum $660.00 Structures Inc. Lump Sum $15,000.00 Growling Bear Co. (Inc.) Lump Sum $48,600.00 Kirkland Construction, LLLP Lump Sum $17,000.00 Hartland-Reliant JV, LLC Lump Sum $13,310.08 Engineer's Estimate ALL LPSM Lump Sum $4,600.00

4 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0220 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

ESCO Construction Co $2.56 $22,348.80 American West Construction, Inc. $2.55 $22,261.50 Structures Inc. $6.50 $56,745.00 Growling Bear Co. (Inc.) $3.00 $26,190.00 Kirkland Construction, LLLP $3.50 $30,555.00 Hartland-Reliant JV, LLC $3.52 $30,729.60 Engineer's Estimate 8,730 LNFT $5.00 $43,650.00

A0240 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

ESCO Construction Co $3,850.00 $26,950.00 American West Construction, Inc. $3,100.00 $21,700.00 Structures Inc. $3,410.00 $23,870.00 Growling Bear Co. (Inc.) $2,600.00 $18,200.00 Kirkland Construction, LLLP $2,100.00 $14,700.00 Hartland-Reliant JV, LLC $7,320.54 $51,243.78 Engineer's Estimate 7 EACH $2,200.00 $15,400.00

A0260 15802-0000 WATERING FOR DUST CONTROL

ESCO Construction Co Lump Sum $118,780.00 American West Construction, Inc. Lump Sum $43,000.00 Structures Inc. Lump Sum $73,600.00 Growling Bear Co. (Inc.) Lump Sum $50,000.00 Kirkland Construction, LLLP Lump Sum $60,000.00 Hartland-Reliant JV, LLC Lump Sum $106,480.66 Engineer's Estimate ALL LPSM Lump Sum $15,500.00

A0280 20101-0000 CLEARING AND GRUBBING

ESCO Construction Co $5,550.00 $16,650.00 American West Construction, Inc. $9,700.00 $29,100.00 Structures Inc. $12,660.00 $37,980.00 Growling Bear Co. (Inc.) $9,300.00 $27,900.00 Kirkland Construction, LLLP $5,000.00 $15,000.00 Hartland-Reliant JV, LLC $66,550.41 $199,651.23 Engineer's Estimate 3.0 ACRE $6,400.00 $19,200.00

A0300 20301-1900 REMOVAL OF PIPE CULVERT

ESCO Construction Co $3,260.00 $6,520.00 American West Construction, Inc. $1,500.00 $3,000.00 Structures Inc. $750.00 $1,500.00 Growling Bear Co. (Inc.) $550.00 $1,100.00 Kirkland Construction, LLLP $2,500.00 $5,000.00 Hartland-Reliant JV, LLC $6,655.04 $13,310.08 Engineer's Estimate 2 EACH $2,000.00 $4,000.00

5 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0320 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS

ESCO Construction Co Lump Sum $500.00 American West Construction, Inc. Lump Sum $11,000.00 Structures Inc. Lump Sum $15,000.00 Growling Bear Co. (Inc.) Lump Sum $10,000.00 Kirkland Construction, LLLP Lump Sum $32,000.00 Hartland-Reliant JV, LLC Lump Sum $33,275.20 Engineer's Estimate ALL LPSM Lump Sum $21,000.00

A0340 20402-0000 SUBEXCAVATION

ESCO Construction Co $50.00 $5,000.00 American West Construction, Inc. $57.00 $5,700.00 Structures Inc. $68.00 $6,800.00 Growling Bear Co. (Inc.) $50.00 $5,000.00 Kirkland Construction, LLLP $83.00 $8,300.00 Hartland-Reliant JV, LLC $665.50 $66,550.00 Engineer's Estimate 100 CUYD $10.00 $1,000.00

A0360 20420-0000 EMBANKMENT CONSTRUCTION

ESCO Construction Co $35.40 $106,200.00 American West Construction, Inc. $20.00 $60,000.00 Structures Inc. $15.00 $45,000.00 Growling Bear Co. (Inc.) $11.00 $33,000.00 Kirkland Construction, LLLP $28.00 $84,000.00 Hartland-Reliant JV, LLC $33.27 $99,810.00 Engineer's Estimate 3,000 CUYD $17.00 $51,000.00

A0380 20801-0000 STRUCTURE EXCAVATION

ESCO Construction Co $48.70 $5,210.90 American West Construction, Inc. $73.25 $7,837.75 Structures Inc. $43.00 $4,601.00 Growling Bear Co. (Inc.) $32.00 $3,424.00 Kirkland Construction, LLLP $100.00 $10,700.00 Hartland-Reliant JV, LLC $199.65 $21,362.55 Engineer's Estimate 107 CUYD $45.00 $4,815.00

A0400 20803-0000 STRUCTURAL BACKFILL

ESCO Construction Co $304.50 $33,495.00 American West Construction, Inc. $230.00 $25,300.00 Structures Inc. $63.00 $6,930.00 Growling Bear Co. (Inc.) $47.00 $5,170.00 Kirkland Construction, LLLP $150.00 $16,500.00 Hartland-Reliant JV, LLC $199.65 $21,961.50 Engineer's Estimate 110 CUYD $100.00 $11,000.00

6 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0420 21201-0000 LINEAR GRADING

ESCO Construction Co $50,670.00 $391,172.40 American West Construction, Inc. $23,000.00 $177,560.00 Structures Inc. $9,000.00 $69,480.00 Growling Bear Co. (Inc.) $6,600.00 $50,952.00 Kirkland Construction, LLLP $65,000.00 $501,800.00 Hartland-Reliant JV, LLC $65,219.40 $503,493.77 Engineer's Estimate 7.720 MILE $4,500.00 $34,740.00

A0440 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

ESCO Construction Co $122.50 $6,125.00 American West Construction, Inc. $150.00 $7,500.00 Structures Inc. $115.00 $5,750.00 Growling Bear Co. (Inc.) $81.00 $4,050.00 Kirkland Construction, LLLP $125.00 $6,250.00 Hartland-Reliant JV, LLC $232.92 $11,646.00 Engineer's Estimate 50 CUYD $200.00 $10,000.00

A0460 30201-2000 ROADWAY AGGREGATE, METHOD 2

ESCO Construction Co $70.00 $140,000.00 American West Construction, Inc. $66.25 $132,500.00 Structures Inc. $76.25 $152,500.00 Growling Bear Co. (Inc.) $56.00 $112,000.00 Kirkland Construction, LLLP $80.00 $160,000.00 Hartland-Reliant JV, LLC $37.26 $74,520.00 Engineer's Estimate 2,000 CUYD $65.00 $130,000.00

A0480 30203-2000 ROADWAY AGGREGATE, METHOD 2 (CRUSHER FINES)

ESCO Construction Co $13.90 $396,150.00 American West Construction, Inc. $12.25 $349,125.00 Structures Inc. $16.35 $465,975.00 Growling Bear Co. (Inc.) $12.00 $342,000.00 Kirkland Construction, LLLP $14.00 $399,000.00 Hartland-Reliant JV, LLC $23.29 $663,765.00 Engineer's Estimate 28,500 SQYD $15.00 $427,500.00

A0500 40301-0000 ASPHALT CONCRETE PAVEMENT

ESCO Construction Co $155.50 $116,625.00 American West Construction, Inc. $200.00 $150,000.00 Structures Inc. $225.00 $168,750.00 Growling Bear Co. (Inc.) $148.00 $111,000.00 Kirkland Construction, LLLP $281.00 $210,750.00 Hartland-Reliant JV, LLC $166.37 $124,777.50 Engineer's Estimate 750 TON $150.00 $112,500.00

7 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0520 40601-0000 FOG SEAL

ESCO Construction Co $569.50 $1,708.50 American West Construction, Inc. $780.00 $2,340.00 Structures Inc. $1,000.00 $3,000.00 Growling Bear Co. (Inc.) $700.00 $2,100.00 Kirkland Construction, LLLP $770.00 $2,310.00 Hartland-Reliant JV, LLC $665.50 $1,996.50 Engineer's Estimate 3 TON $700.00 $2,100.00

A0540 41101-1000 PRIME COAT, METHOD 1

ESCO Construction Co $569.50 $3,986.50 American West Construction, Inc. $1,060.00 $7,420.00 Structures Inc. $1,500.00 $10,500.00 Growling Bear Co. (Inc.) $1,035.00 $7,245.00 Kirkland Construction, LLLP $652.00 $4,564.00 Hartland-Reliant JV, LLC $1,597.20 $11,180.40 Engineer's Estimate 7 TON $1,200.00 $8,400.00

A0560 55101-1900 STEEL H-PILE, 14 X 89, IN PLACE

ESCO Construction Co $151.00 $96,640.00 American West Construction, Inc. $270.00 $172,800.00 Structures Inc. $125.00 $80,000.00 Growling Bear Co. (Inc.) $210.00 $134,400.00 Kirkland Construction, LLLP $143.00 $91,520.00 Hartland-Reliant JV, LLC $167.90 $107,456.00 Engineer's Estimate 640 LNFT $110.00 $70,400.00

A0580 55104-1000 DYNAMIC PILE LOAD TEST

ESCO Construction Co $1,710.00 $6,840.00 American West Construction, Inc. $3,300.00 $13,200.00 Structures Inc. $4,250.00 $17,000.00 Growling Bear Co. (Inc.) $1,022.00 $4,088.00 Kirkland Construction, LLLP $5,100.00 $20,400.00 Hartland-Reliant JV, LLC $6,069.39 $24,277.56 Engineer's Estimate 4 EACH $5,200.00 $20,800.00

A0600 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

ESCO Construction Co $1,580.00 $183,280.00 American West Construction, Inc. $1,400.00 $162,400.00 Structures Inc. $1,100.00 $127,600.00 Growling Bear Co. (Inc.) $1,644.00 $190,704.00 Kirkland Construction, LLLP $1,400.00 $162,400.00 Hartland-Reliant JV, LLC $1,657.77 $192,301.32 Engineer's Estimate 116 CUYD $1,200.00 $139,200.00

8 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0620 55235-0000 EXPANSION JOINTS

ESCO Construction Co $101.50 $8,120.00 American West Construction, Inc. $62.50 $5,000.00 Structures Inc. $65.00 $5,200.00 Growling Bear Co. (Inc.) $3.00 $240.00 Kirkland Construction, LLLP $82.00 $6,560.00 Hartland-Reliant JV, LLC $97.36 $7,788.80 Engineer's Estimate 80 LNFT $150.00 $12,000.00

A0640 55401-2000 REINFORCING STEEL, EPOXY COATED

ESCO Construction Co $2.86 $54,054.00 American West Construction, Inc. $2.70 $51,030.00 Structures Inc. $2.00 $37,800.00 Growling Bear Co. (Inc.) $2.00 $37,800.00 Kirkland Construction, LLLP $3.00 $56,700.00 Hartland-Reliant JV, LLC $2.71 $51,219.00 Engineer's Estimate 18,900 LB $2.00 $37,800.00

A0660 55504-0000 PRE-FABRICATED STEEL BRIDGE (SOUTH HIGH LINE CANAL)

ESCO Construction Co Lump Sum $56,410.00 American West Construction, Inc. Lump Sum $49,300.00 Structures Inc. Lump Sum $54,000.00 Growling Bear Co. (Inc.) Lump Sum $57,450.00 Kirkland Construction, LLLP Lump Sum $75,000.00 Hartland-Reliant JV, LLC Lump Sum $82,143.17 Engineer's Estimate ALL LPSM Lump Sum $42,000.00

A0680 55504-0000 PRE-FABRICATED STEEL BRIDGE (NORTH HIGH LINE CANAL)

ESCO Construction Co Lump Sum $56,410.00 American West Construction, Inc. Lump Sum $98,400.00 Structures Inc. Lump Sum $54,000.00 Growling Bear Co. (Inc.) Lump Sum $57,450.00 Kirkland Construction, LLLP Lump Sum $80,000.00 Hartland-Reliant JV, LLC Lump Sum $82,143.17 Engineer's Estimate ALL LPSM Lump Sum $42,000.00

A0700 55504-0000 PRE-FABRICATED STEEL BRIDGE (UVALDA DITCH)

ESCO Construction Co Lump Sum $106,970.00 American West Construction, Inc. Lump Sum $52,300.00 Structures Inc. Lump Sum $105,000.00 Growling Bear Co. (Inc.) Lump Sum $92,990.00 Kirkland Construction, LLLP Lump Sum $136,000.00 Hartland-Reliant JV, LLC Lump Sum $157,125.53 Engineer's Estimate ALL LPSM Lump Sum $90,000.00

9 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0720 55504-0000 PRE-FABRICATED STEEL BRIDGE (SAND CREEK LATERAL)

ESCO Construction Co Lump Sum $54,820.00 American West Construction, Inc. Lump Sum $52,300.00 Structures Inc. Lump Sum $51,000.00 Growling Bear Co. (Inc.) Lump Sum $55,200.00 Kirkland Construction, LLLP Lump Sum $70,000.00 Hartland-Reliant JV, LLC Lump Sum $77,058.72 Engineer's Estimate ALL LPSM Lump Sum $36,000.00

A0740 60201-0800 24-INCH PIPE CULVERT

ESCO Construction Co $288.00 $69,120.00 American West Construction, Inc. $160.00 $38,400.00 Structures Inc. $65.00 $15,600.00 Growling Bear Co. (Inc.) $48.00 $11,520.00 Kirkland Construction, LLLP $213.00 $51,120.00 Hartland-Reliant JV, LLC $166.38 $39,931.20 Engineer's Estimate 240 LNFT $115.00 $27,600.00

A0760 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

ESCO Construction Co $754.00 $15,080.00 American West Construction, Inc. $720.00 $14,400.00 Structures Inc. $1,300.00 $26,000.00 Growling Bear Co. (Inc.) $950.00 $19,000.00 Kirkland Construction, LLLP $1,500.00 $30,000.00 Hartland-Reliant JV, LLC $931.70 $18,634.00 Engineer's Estimate 20 EACH $1,250.00 $25,000.00

A0780 60915-1000 WHEELSTOP, CONCRETE

ESCO Construction Co $105.50 $5,908.00 American West Construction, Inc. $140.00 $7,840.00 Structures Inc. $135.00 $7,560.00 Growling Bear Co. (Inc.) $95.00 $5,320.00 Kirkland Construction, LLLP $415.00 $23,240.00 Hartland-Reliant JV, LLC $166.37 $9,316.72 Engineer's Estimate 56 EACH $200.00 $11,200.00

A0800 61501-0100 SIDEWALK, CONCRETE

ESCO Construction Co $49.20 $154,980.00 American West Construction, Inc. $86.25 $271,687.50 Structures Inc. $80.50 $253,575.00 Growling Bear Co. (Inc.) $74.00 $233,100.00 Kirkland Construction, LLLP $77.00 $242,550.00 Hartland-Reliant JV, LLC $103.55 $326,182.50 Engineer's Estimate 3,150 SQYD $140.00 $441,000.00

10 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0820 61502-1000 DRIVE PAD, CONCRETE

ESCO Construction Co $92.00 $23,000.00 American West Construction, Inc. $130.00 $32,500.00 Structures Inc. $87.00 $21,750.00 Growling Bear Co. (Inc.) $86.00 $21,500.00 Kirkland Construction, LLLP $205.00 $51,250.00 Hartland-Reliant JV, LLC $103.55 $25,887.50 Engineer's Estimate 250 SQYD $210.00 $52,500.00

A0840 61504-1000 ACCESSIBILITY RAMP, CONCRETE

ESCO Construction Co $339.50 $3,395.00 American West Construction, Inc. $440.00 $4,400.00 Structures Inc. $1,200.00 $12,000.00 Growling Bear Co. (Inc.) $92.00 $920.00 Kirkland Construction, LLLP $1,000.00 $10,000.00 Hartland-Reliant JV, LLC $332.75 $3,327.50 Engineer's Estimate 10 SQYD $185.00 $1,850.00

A0860 61901-0500 FENCE, WOVEN WIRE, 96-INCH HEIGHT

ESCO Construction Co $52.50 $31,500.00 American West Construction, Inc. $46.75 $28,050.00 Structures Inc. $57.00 $34,200.00 Growling Bear Co. (Inc.) $35.00 $21,000.00 Kirkland Construction, LLLP $40.00 $24,000.00 Hartland-Reliant JV, LLC $33.27 $19,962.00 Engineer's Estimate 600 LNFT $75.00 $45,000.00

A0880 61901-2300 FENCE, SPLIT RAIL (42-Inch)

ESCO Construction Co $38.10 $3,810.00 American West Construction, Inc. $40.25 $4,025.00 Structures Inc. $50.00 $5,000.00 Growling Bear Co. (Inc.) $30.00 $3,000.00 Kirkland Construction, LLLP $40.00 $4,000.00 Hartland-Reliant JV, LLC $30.61 $3,061.00 Engineer's Estimate 100 LNFT $30.00 $3,000.00

A0900 61901-2300 FENCE, SPLIT RAIL (36-Inch)

ESCO Construction Co $35.30 $93,545.00 American West Construction, Inc. $35.75 $94,737.50 Structures Inc. $44.00 $116,600.00 Growling Bear Co. (Inc.) $28.00 $74,200.00 Kirkland Construction, LLLP $40.00 $106,000.00 Hartland-Reliant JV, LLC $30.61 $81,116.50 Engineer's Estimate 2,650 LNFT $30.00 $79,500.00

11 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0920 61902-4900 GATE, WOVEN WIRE, 12 FEET WIDTH

ESCO Construction Co $1,920.00 $5,760.00 American West Construction, Inc. $3,500.00 $10,500.00 Structures Inc. $4,300.00 $12,900.00 Growling Bear Co. (Inc.) $950.00 $2,850.00 Kirkland Construction, LLLP $5,000.00 $15,000.00 Hartland-Reliant JV, LLC $1,730.31 $5,190.93 Engineer's Estimate 3 EACH $4,000.00 $12,000.00

A0940 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

ESCO Construction Co $106.00 $4,240.00 American West Construction, Inc. $110.00 $4,400.00 Structures Inc. $110.00 $4,400.00 Growling Bear Co. (Inc.) $102.00 $4,080.00 Kirkland Construction, LLLP $126.00 $5,040.00 Hartland-Reliant JV, LLC $186.34 $7,453.60 Engineer's Estimate 40 HOUR $110.00 $4,400.00

A0960 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

ESCO Construction Co $137.00 $2,740.00 American West Construction, Inc. $120.00 $2,400.00 Structures Inc. $125.00 $2,500.00 Growling Bear Co. (Inc.) $114.00 $2,280.00 Kirkland Construction, LLLP $93.00 $1,860.00 Hartland-Reliant JV, LLC $166.37 $3,327.40 Engineer's Estimate 20 HOUR $100.00 $2,000.00

A0980 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

ESCO Construction Co $215.50 $4,310.00 American West Construction, Inc. $150.00 $3,000.00 Structures Inc. $130.00 $2,600.00 Growling Bear Co. (Inc.) $120.00 $2,400.00 Kirkland Construction, LLLP $138.00 $2,760.00 Hartland-Reliant JV, LLC $199.65 $3,993.00 Engineer's Estimate 20 HOUR $110.00 $2,200.00

A1000 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER

ESCO Construction Co $158.00 $3,160.00 American West Construction, Inc. $380.00 $7,600.00 Structures Inc. $150.00 $3,000.00 Growling Bear Co. (Inc.) $138.00 $2,760.00 Kirkland Construction, LLLP $166.00 $3,320.00 Hartland-Reliant JV, LLC $299.47 $5,989.40 Engineer's Estimate 20 HOUR $200.00 $4,000.00

12 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1020 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

ESCO Construction Co $244.50 $4,890.00 American West Construction, Inc. $180.00 $3,600.00 Structures Inc. $140.00 $2,800.00 Growling Bear Co. (Inc.) $126.00 $2,520.00 Kirkland Construction, LLLP $177.00 $3,540.00 Hartland-Reliant JV, LLC $219.61 $4,392.20 Engineer's Estimate 20 HOUR $130.00 $2,600.00

A1040 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY

ESCO Construction Co $181.50 $7,260.00 American West Construction, Inc. $190.00 $7,600.00 Structures Inc. $130.00 $5,200.00 Growling Bear Co. (Inc.) $120.00 $4,800.00 Kirkland Construction, LLLP $135.00 $5,400.00 Hartland-Reliant JV, LLC $259.54 $10,381.60 Engineer's Estimate 40 HOUR $145.00 $5,800.00

A1060 62301-0000 GENERAL LABOR

ESCO Construction Co $67.40 $2,696.00 American West Construction, Inc. $53.75 $2,150.00 Structures Inc. $48.00 $1,920.00 Growling Bear Co. (Inc.) $100.00 $4,000.00 Kirkland Construction, LLLP $98.00 $3,920.00 Hartland-Reliant JV, LLC $73.20 $2,928.00 Engineer's Estimate 40 HOUR $40.00 $1,600.00

A1080 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

ESCO Construction Co $67.40 $2,696.00 American West Construction, Inc. $180.00 $7,200.00 Structures Inc. $165.00 $6,600.00 Growling Bear Co. (Inc.) $150.00 $6,000.00 Kirkland Construction, LLLP $167.00 $6,680.00 Hartland-Reliant JV, LLC $199.65 $7,986.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00

A1100 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

ESCO Construction Co $67.40 $2,696.00 American West Construction, Inc. $180.00 $7,200.00 Structures Inc. $330.00 $13,200.00 Growling Bear Co. (Inc.) $150.00 $6,000.00 Kirkland Construction, LLLP $167.00 $6,680.00 Hartland-Reliant JV, LLC $199.65 $7,986.00 Engineer's Estimate 40 HOUR $180.00 $7,200.00

13 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1120 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH

ESCO Construction Co $1.33 $82,460.00 American West Construction, Inc. $1.25 $77,500.00 Structures Inc. $1.00 $62,000.00 Growling Bear Co. (Inc.) $10.00 $620,000.00 Kirkland Construction, LLLP $1.80 $111,600.00 Hartland-Reliant JV, LLC $3.39 $210,180.00 Engineer's Estimate 62,000 SQYD $2.00 $124,000.00

A1140 62510-2000 SEEDING, HYDRAULIC METHOD

ESCO Construction Co $638.00 $8,294.00 American West Construction, Inc. $1,500.00 $19,500.00 Structures Inc. $600.00 $7,800.00 Growling Bear Co. (Inc.) $1,601.00 $20,813.00 Kirkland Construction, LLLP $1,900.00 $24,700.00 Hartland-Reliant JV, LLC $905.08 $11,766.04 Engineer's Estimate 13.0 ACRE $2,000.00 $26,000.00

A1160 62515-2000 MULCHING, HYDRAULIC METHOD

ESCO Construction Co $1,000.00 $13,000.00 American West Construction, Inc. $2,000.00 $26,000.00 Structures Inc. $950.00 $12,350.00 Growling Bear Co. (Inc.) $1,775.00 $23,075.00 Kirkland Construction, LLLP $1,400.00 $18,200.00 Hartland-Reliant JV, LLC $2,608.77 $33,914.01 Engineer's Estimate 13.0 ACRE $2,200.00 $28,600.00

A1180 63301-0000 SIGN SYSTEM

ESCO Construction Co $123.00 $8,610.00 American West Construction, Inc. $640.00 $44,800.00 Structures Inc. $500.00 $35,000.00 Growling Bear Co. (Inc.) $804.00 $56,280.00 Kirkland Construction, LLLP $650.00 $45,500.00 Hartland-Reliant JV, LLC $732.05 $51,243.50 Engineer's Estimate 70 EACH $300.00 $21,000.00

A1200 63309-0000 DELINEATOR

ESCO Construction Co $29.30 $586.00 American West Construction, Inc. $49.25 $985.00 Structures Inc. $70.00 $1,400.00 Growling Bear Co. (Inc.) $125.00 $2,500.00 Kirkland Construction, LLLP $50.00 $1,000.00 Hartland-Reliant JV, LLC $133.10 $2,662.00 Engineer's Estimate 20 EACH $40.00 $800.00

14 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1220 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

ESCO Construction Co $0.42 $3,486.00 American West Construction, Inc. $0.40 $3,320.00 Structures Inc. $1.30 $10,790.00 Growling Bear Co. (Inc.) $1.00 $8,300.00 Kirkland Construction, LLLP $0.85 $7,055.00 Hartland-Reliant JV, LLC $0.79 $6,557.00 Engineer's Estimate 8,300 LNFT $0.40 $3,320.00

A1240 63405-0050 PAVEMENT MARKINGS, SYMBOLS (ACCESSIBILITY SYMBOL)

ESCO Construction Co $512.50 $2,050.00 American West Construction, Inc. $490.00 $1,960.00 Structures Inc. $2,750.00 $11,000.00 Growling Bear Co. (Inc.) $35.00 $140.00 Kirkland Construction, LLLP $1,100.00 $4,400.00 Hartland-Reliant JV, LLC $598.95 $2,395.80 Engineer's Estimate 4 EACH $150.00 $600.00

A1260 63501-0000 TEMPORARY TRAFFIC CONTROL

ESCO Construction Co Lump Sum $55,260.00 American West Construction, Inc. Lump Sum $17,000.00 Structures Inc. Lump Sum $105,000.00 Growling Bear Co. (Inc.) Lump Sum $50,000.00 Kirkland Construction, LLLP Lump Sum $67,000.00 Hartland-Reliant JV, LLC Lump Sum $66,550.41 Engineer's Estimate ALL LPSM Lump Sum $6,000.00

A1280 63601-1000 SYSTEM INSTALLATION, TRAFFIC SIGNAL

ESCO Construction Co Lump Sum $13,740.00 American West Construction, Inc. Lump Sum $15,000.00 Structures Inc. Lump Sum $20,500.00 Growling Bear Co. (Inc.) Lump Sum $26,250.00 Kirkland Construction, LLLP Lump Sum $30,000.00 Hartland-Reliant JV, LLC Lump Sum $18,051.13 Engineer's Estimate ALL LPSM Lump Sum $15,000.00

A1300 64603-0000 FIXTURE (TIMBER ARCH STRUCTURE)

ESCO Construction Co $2,180.00 $13,080.00 American West Construction, Inc. $2,300.00 $13,800.00 Structures Inc. $2,500.00 $15,000.00 Growling Bear Co. (Inc.) $950.00 $5,700.00 Kirkland Construction, LLLP $5,600.00 $33,600.00 Hartland-Reliant JV, LLC $1,996.51 $11,979.06 Engineer's Estimate 6 EACH $4,000.00 $24,000.00

15 out of 15Source Selection Information - See FAR 2.101 & 3.104

Project No: CO FLAP DEN56(1)

Project Name: Access connections to ROAR

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1320 64603-0000 FIXTURE (DUAL VESTIBULE GATES)

ESCO Construction Co $1,920.00 $9,600.00 American West Construction, Inc. $5,700.00 $28,500.00 Structures Inc. $6,100.00 $30,500.00 Growling Bear Co. (Inc.) $1,650.00 $8,250.00 Kirkland Construction, LLLP $11,000.00 $55,000.00 Hartland-Reliant JV, LLC $5,590.23 $27,951.15 Engineer's Estimate 5 EACH $5,000.00 $25,000.00

A1340 64603-0800 FIXTURE, KIOSK

ESCO Construction Co $19,940.00 $39,880.00 American West Construction, Inc. $6,500.00 $13,000.00 Structures Inc. $7,600.00 $15,200.00 Growling Bear Co. (Inc.) $4,000.00 $8,000.00 Kirkland Construction, LLLP $11,000.00 $22,000.00 Hartland-Reliant JV, LLC $6,655.04 $13,310.08 Engineer's Estimate 2 EACH $9,000.00 $18,000.00

A1360 64604-3000 FIXTURE, PEDESTRIAN RAILING

ESCO Construction Co $329.50 $56,015.00 American West Construction, Inc. $339.00 $57,630.00 Structures Inc. $420.00 $71,400.00 Growling Bear Co. (Inc.) $363.00 $61,710.00 Kirkland Construction, LLLP $508.00 $86,360.00 Hartland-Reliant JV, LLC $609.26 $103,574.20 Engineer's Estimate 170 LNFT $85.00 $14,450.00

Total Schedule - All Items

ESCO Construction Co $2,952,704.14 American West Construction, Inc. $3,186,167.25 Structures Inc. $3,566,424.50 Growling Bear Co. (Inc.) $3,783,747.36 Kirkland Construction, LLLP $4,414,899.00 Hartland-Reliant JV, LLC $4,986,922.25 Engineer's Estimate $2,950,000.00