Bid Tabulation CO FLAP DEN56(1) Access Connections to ROAR.pdf
PDF 619 KB Posted
- Attached to
- CO FLAP DEN 56(1) Access Connections to ROAR Federal contract opportunity
- Solicitation number
- 6982AF19B000013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_-__CO_FLAP_DEN_56(1)_Access_Connections_to_ROAR.pdf | ||
| QnA_10.28.19.pdf | ||
| Amendment_A002.pdf | ||
| A001.pdf | ||
| QnA_10.16.19.pdf | ||
| Access_Connections_to_ROAR_Final_Hydraulics_Report.pdf | ||
| CO_FLAP_DEN56(1)_100__2019-9-10.pdf | ||
| RMA_Geotech_Report_20190627.pdf | ||
| 6982AF19B000013.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 11/07/19
1 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF19B000013
Division: Central Federal Lands
State: CO County: Adams
Federal Land: Rocky Mountain Arsenal National Wildlife Refuge Opened at: Lakewood, CO
Opened by: Leslie Karsten
Date: 11/06/19
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
ESCO Construction Co $2,952,704.14 3540 Evergreen Parkway Evergreen, CO 80439
American West Construction, Inc. $3,186,167.25 275 E 64th Ave.
Denver, CO 80221
Structures Inc. $3,566,424.50 4 Iverness Ct East, Suite 250 Englewood, CO 80112
Growling Bear Co. (Inc.) $3,783,747.36 2330 4th Ave.
Greeley, CO 80631
Kirkland Construction, LLLP $4,414,899.00 P.O. Box 580 Rye, CO 81069
Hartland-Reliant JV, LLC $4,986,922.25 854 South Charlo Dr.
Pueblo, CO 81007
Engineer's Estimate $2,950,000.00
2 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
ESCO Construction Co Lump Sum $101,430.00 American West Construction, Inc. Lump Sum $326,000.00 Structures Inc. Lump Sum $285,950.00 Growling Bear Co. (Inc.) Lump Sum $803,037.00 Kirkland Construction, LLLP Lump Sum $440,000.00 Hartland-Reliant JV, LLC Lump Sum $692,863.03 Engineer's Estimate ALL LPSM Lump Sum $338,883.00
A0040 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
ESCO Construction Co $7,760.00 $2,227.12 American West Construction, Inc. $10,000.00 $2,870.00 Structures Inc. $28,000.00 $8,036.00 Growling Bear Co. (Inc.) $8,363.00 $2,400.18 Kirkland Construction, LLLP $25,000.00 $7,175.00 Hartland-Reliant JV, LLC $11,130.38 $3,194.42 Engineer's Estimate 0.287 MILE $17,000.00 $4,879.00
A0060 15210-3000 CENTERLINE, VERIFICATION AND STAKING
ESCO Construction Co $1,440.00 $11,116.80 American West Construction, Inc. $2,400.00 $18,528.00 Structures Inc. $7,500.00 $57,900.00 Growling Bear Co. (Inc.) $2,000.00 $15,440.00 Kirkland Construction, LLLP $10,000.00 $77,200.00 Hartland-Reliant JV, LLC $2,662.01 $20,550.72 Engineer's Estimate 7.720 MILE $6,500.00 $50,180.00
A0080 15215-2000 SURVEY AND STAKING, BRIDGE
ESCO Construction Co $2,230.00 $8,920.00 American West Construction, Inc. $4,800.00 $19,200.00 Structures Inc. $3,400.00 $13,600.00 Growling Bear Co. (Inc.) $4,000.00 $16,000.00 Kirkland Construction, LLLP $10,000.00 $40,000.00 Hartland-Reliant JV, LLC $5,324.03 $21,296.12 Engineer's Estimate 4 EACH $5,000.00 $20,000.00
A0100 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
ESCO Construction Co $2,230.00 $20,070.00 American West Construction, Inc. $720.00 $6,480.00 Structures Inc. $980.00 $8,820.00 Growling Bear Co. (Inc.) $600.00 $5,400.00 Kirkland Construction, LLLP $5,000.00 $45,000.00 Hartland-Reliant JV, LLC $798.60 $7,187.40 Engineer's Estimate 9 EACH $850.00 $7,650.00
3 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0120 15215-7000 SURVEY AND STAKING, PARKING AREA
ESCO Construction Co $2,230.00 $13,380.00 American West Construction, Inc. $1,800.00 $10,800.00 Structures Inc. $1,550.00 $9,300.00 Growling Bear Co. (Inc.) $1,500.00 $9,000.00 Kirkland Construction, LLLP $10,000.00 $60,000.00 Hartland-Reliant JV, LLC $1,996.51 $11,979.06 Engineer's Estimate 6 EACH $3,500.00 $21,000.00
A0140 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
ESCO Construction Co $7,760.00 $2,227.12 American West Construction, Inc. $10,000.00 $2,870.00 Structures Inc. $27,500.00 $7,892.50 Growling Bear Co. (Inc.) $8,363.00 $2,400.18 Kirkland Construction, LLLP $20,000.00 $5,740.00 Hartland-Reliant JV, LLC $11,130.38 $3,194.42 Engineer's Estimate 0.287 MILE $9,000.00 $2,583.00
A0160 15301-0000 CONTRACTOR QUALITY CONTROL
ESCO Construction Co Lump Sum $11,390.00 American West Construction, Inc. Lump Sum $112,000.00 Structures Inc. Lump Sum $275,000.00 Growling Bear Co. (Inc.) Lump Sum $70,200.00 Kirkland Construction, LLLP Lump Sum $180,000.00 Hartland-Reliant JV, LLC Lump Sum $137,093.85 Engineer's Estimate ALL LPSM Lump Sum $17,000.00
A0180 15401-0000 CONTRACTOR TESTING
ESCO Construction Co Lump Sum $11,280.00 American West Construction, Inc. Lump Sum $104,000.00 Structures Inc. Lump Sum $260,000.00 Growling Bear Co. (Inc.) Lump Sum $53,349.00 Kirkland Construction, LLLP Lump Sum $180,000.00 Hartland-Reliant JV, LLC Lump Sum $111,804.69 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
A0200 15501-0000 CONSTRUCTION SCHEDULE
ESCO Construction Co Lump Sum $2,850.00 American West Construction, Inc. Lump Sum $660.00 Structures Inc. Lump Sum $15,000.00 Growling Bear Co. (Inc.) Lump Sum $48,600.00 Kirkland Construction, LLLP Lump Sum $17,000.00 Hartland-Reliant JV, LLC Lump Sum $13,310.08 Engineer's Estimate ALL LPSM Lump Sum $4,600.00
4 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0220 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
ESCO Construction Co $2.56 $22,348.80 American West Construction, Inc. $2.55 $22,261.50 Structures Inc. $6.50 $56,745.00 Growling Bear Co. (Inc.) $3.00 $26,190.00 Kirkland Construction, LLLP $3.50 $30,555.00 Hartland-Reliant JV, LLC $3.52 $30,729.60 Engineer's Estimate 8,730 LNFT $5.00 $43,650.00
A0240 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
ESCO Construction Co $3,850.00 $26,950.00 American West Construction, Inc. $3,100.00 $21,700.00 Structures Inc. $3,410.00 $23,870.00 Growling Bear Co. (Inc.) $2,600.00 $18,200.00 Kirkland Construction, LLLP $2,100.00 $14,700.00 Hartland-Reliant JV, LLC $7,320.54 $51,243.78 Engineer's Estimate 7 EACH $2,200.00 $15,400.00
A0260 15802-0000 WATERING FOR DUST CONTROL
ESCO Construction Co Lump Sum $118,780.00 American West Construction, Inc. Lump Sum $43,000.00 Structures Inc. Lump Sum $73,600.00 Growling Bear Co. (Inc.) Lump Sum $50,000.00 Kirkland Construction, LLLP Lump Sum $60,000.00 Hartland-Reliant JV, LLC Lump Sum $106,480.66 Engineer's Estimate ALL LPSM Lump Sum $15,500.00
A0280 20101-0000 CLEARING AND GRUBBING
ESCO Construction Co $5,550.00 $16,650.00 American West Construction, Inc. $9,700.00 $29,100.00 Structures Inc. $12,660.00 $37,980.00 Growling Bear Co. (Inc.) $9,300.00 $27,900.00 Kirkland Construction, LLLP $5,000.00 $15,000.00 Hartland-Reliant JV, LLC $66,550.41 $199,651.23 Engineer's Estimate 3.0 ACRE $6,400.00 $19,200.00
A0300 20301-1900 REMOVAL OF PIPE CULVERT
ESCO Construction Co $3,260.00 $6,520.00 American West Construction, Inc. $1,500.00 $3,000.00 Structures Inc. $750.00 $1,500.00 Growling Bear Co. (Inc.) $550.00 $1,100.00 Kirkland Construction, LLLP $2,500.00 $5,000.00 Hartland-Reliant JV, LLC $6,655.04 $13,310.08 Engineer's Estimate 2 EACH $2,000.00 $4,000.00
5 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0320 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ESCO Construction Co Lump Sum $500.00 American West Construction, Inc. Lump Sum $11,000.00 Structures Inc. Lump Sum $15,000.00 Growling Bear Co. (Inc.) Lump Sum $10,000.00 Kirkland Construction, LLLP Lump Sum $32,000.00 Hartland-Reliant JV, LLC Lump Sum $33,275.20 Engineer's Estimate ALL LPSM Lump Sum $21,000.00
A0340 20402-0000 SUBEXCAVATION
ESCO Construction Co $50.00 $5,000.00 American West Construction, Inc. $57.00 $5,700.00 Structures Inc. $68.00 $6,800.00 Growling Bear Co. (Inc.) $50.00 $5,000.00 Kirkland Construction, LLLP $83.00 $8,300.00 Hartland-Reliant JV, LLC $665.50 $66,550.00 Engineer's Estimate 100 CUYD $10.00 $1,000.00
A0360 20420-0000 EMBANKMENT CONSTRUCTION
ESCO Construction Co $35.40 $106,200.00 American West Construction, Inc. $20.00 $60,000.00 Structures Inc. $15.00 $45,000.00 Growling Bear Co. (Inc.) $11.00 $33,000.00 Kirkland Construction, LLLP $28.00 $84,000.00 Hartland-Reliant JV, LLC $33.27 $99,810.00 Engineer's Estimate 3,000 CUYD $17.00 $51,000.00
A0380 20801-0000 STRUCTURE EXCAVATION
ESCO Construction Co $48.70 $5,210.90 American West Construction, Inc. $73.25 $7,837.75 Structures Inc. $43.00 $4,601.00 Growling Bear Co. (Inc.) $32.00 $3,424.00 Kirkland Construction, LLLP $100.00 $10,700.00 Hartland-Reliant JV, LLC $199.65 $21,362.55 Engineer's Estimate 107 CUYD $45.00 $4,815.00
A0400 20803-0000 STRUCTURAL BACKFILL
ESCO Construction Co $304.50 $33,495.00 American West Construction, Inc. $230.00 $25,300.00 Structures Inc. $63.00 $6,930.00 Growling Bear Co. (Inc.) $47.00 $5,170.00 Kirkland Construction, LLLP $150.00 $16,500.00 Hartland-Reliant JV, LLC $199.65 $21,961.50 Engineer's Estimate 110 CUYD $100.00 $11,000.00
6 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0420 21201-0000 LINEAR GRADING
ESCO Construction Co $50,670.00 $391,172.40 American West Construction, Inc. $23,000.00 $177,560.00 Structures Inc. $9,000.00 $69,480.00 Growling Bear Co. (Inc.) $6,600.00 $50,952.00 Kirkland Construction, LLLP $65,000.00 $501,800.00 Hartland-Reliant JV, LLC $65,219.40 $503,493.77 Engineer's Estimate 7.720 MILE $4,500.00 $34,740.00
A0440 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
ESCO Construction Co $122.50 $6,125.00 American West Construction, Inc. $150.00 $7,500.00 Structures Inc. $115.00 $5,750.00 Growling Bear Co. (Inc.) $81.00 $4,050.00 Kirkland Construction, LLLP $125.00 $6,250.00 Hartland-Reliant JV, LLC $232.92 $11,646.00 Engineer's Estimate 50 CUYD $200.00 $10,000.00
A0460 30201-2000 ROADWAY AGGREGATE, METHOD 2
ESCO Construction Co $70.00 $140,000.00 American West Construction, Inc. $66.25 $132,500.00 Structures Inc. $76.25 $152,500.00 Growling Bear Co. (Inc.) $56.00 $112,000.00 Kirkland Construction, LLLP $80.00 $160,000.00 Hartland-Reliant JV, LLC $37.26 $74,520.00 Engineer's Estimate 2,000 CUYD $65.00 $130,000.00
A0480 30203-2000 ROADWAY AGGREGATE, METHOD 2 (CRUSHER FINES)
ESCO Construction Co $13.90 $396,150.00 American West Construction, Inc. $12.25 $349,125.00 Structures Inc. $16.35 $465,975.00 Growling Bear Co. (Inc.) $12.00 $342,000.00 Kirkland Construction, LLLP $14.00 $399,000.00 Hartland-Reliant JV, LLC $23.29 $663,765.00 Engineer's Estimate 28,500 SQYD $15.00 $427,500.00
A0500 40301-0000 ASPHALT CONCRETE PAVEMENT
ESCO Construction Co $155.50 $116,625.00 American West Construction, Inc. $200.00 $150,000.00 Structures Inc. $225.00 $168,750.00 Growling Bear Co. (Inc.) $148.00 $111,000.00 Kirkland Construction, LLLP $281.00 $210,750.00 Hartland-Reliant JV, LLC $166.37 $124,777.50 Engineer's Estimate 750 TON $150.00 $112,500.00
7 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0520 40601-0000 FOG SEAL
ESCO Construction Co $569.50 $1,708.50 American West Construction, Inc. $780.00 $2,340.00 Structures Inc. $1,000.00 $3,000.00 Growling Bear Co. (Inc.) $700.00 $2,100.00 Kirkland Construction, LLLP $770.00 $2,310.00 Hartland-Reliant JV, LLC $665.50 $1,996.50 Engineer's Estimate 3 TON $700.00 $2,100.00
A0540 41101-1000 PRIME COAT, METHOD 1
ESCO Construction Co $569.50 $3,986.50 American West Construction, Inc. $1,060.00 $7,420.00 Structures Inc. $1,500.00 $10,500.00 Growling Bear Co. (Inc.) $1,035.00 $7,245.00 Kirkland Construction, LLLP $652.00 $4,564.00 Hartland-Reliant JV, LLC $1,597.20 $11,180.40 Engineer's Estimate 7 TON $1,200.00 $8,400.00
A0560 55101-1900 STEEL H-PILE, 14 X 89, IN PLACE
ESCO Construction Co $151.00 $96,640.00 American West Construction, Inc. $270.00 $172,800.00 Structures Inc. $125.00 $80,000.00 Growling Bear Co. (Inc.) $210.00 $134,400.00 Kirkland Construction, LLLP $143.00 $91,520.00 Hartland-Reliant JV, LLC $167.90 $107,456.00 Engineer's Estimate 640 LNFT $110.00 $70,400.00
A0580 55104-1000 DYNAMIC PILE LOAD TEST
ESCO Construction Co $1,710.00 $6,840.00 American West Construction, Inc. $3,300.00 $13,200.00 Structures Inc. $4,250.00 $17,000.00 Growling Bear Co. (Inc.) $1,022.00 $4,088.00 Kirkland Construction, LLLP $5,100.00 $20,400.00 Hartland-Reliant JV, LLC $6,069.39 $24,277.56 Engineer's Estimate 4 EACH $5,200.00 $20,800.00
A0600 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
ESCO Construction Co $1,580.00 $183,280.00 American West Construction, Inc. $1,400.00 $162,400.00 Structures Inc. $1,100.00 $127,600.00 Growling Bear Co. (Inc.) $1,644.00 $190,704.00 Kirkland Construction, LLLP $1,400.00 $162,400.00 Hartland-Reliant JV, LLC $1,657.77 $192,301.32 Engineer's Estimate 116 CUYD $1,200.00 $139,200.00
8 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0620 55235-0000 EXPANSION JOINTS
ESCO Construction Co $101.50 $8,120.00 American West Construction, Inc. $62.50 $5,000.00 Structures Inc. $65.00 $5,200.00 Growling Bear Co. (Inc.) $3.00 $240.00 Kirkland Construction, LLLP $82.00 $6,560.00 Hartland-Reliant JV, LLC $97.36 $7,788.80 Engineer's Estimate 80 LNFT $150.00 $12,000.00
A0640 55401-2000 REINFORCING STEEL, EPOXY COATED
ESCO Construction Co $2.86 $54,054.00 American West Construction, Inc. $2.70 $51,030.00 Structures Inc. $2.00 $37,800.00 Growling Bear Co. (Inc.) $2.00 $37,800.00 Kirkland Construction, LLLP $3.00 $56,700.00 Hartland-Reliant JV, LLC $2.71 $51,219.00 Engineer's Estimate 18,900 LB $2.00 $37,800.00
A0660 55504-0000 PRE-FABRICATED STEEL BRIDGE (SOUTH HIGH LINE CANAL)
ESCO Construction Co Lump Sum $56,410.00 American West Construction, Inc. Lump Sum $49,300.00 Structures Inc. Lump Sum $54,000.00 Growling Bear Co. (Inc.) Lump Sum $57,450.00 Kirkland Construction, LLLP Lump Sum $75,000.00 Hartland-Reliant JV, LLC Lump Sum $82,143.17 Engineer's Estimate ALL LPSM Lump Sum $42,000.00
A0680 55504-0000 PRE-FABRICATED STEEL BRIDGE (NORTH HIGH LINE CANAL)
ESCO Construction Co Lump Sum $56,410.00 American West Construction, Inc. Lump Sum $98,400.00 Structures Inc. Lump Sum $54,000.00 Growling Bear Co. (Inc.) Lump Sum $57,450.00 Kirkland Construction, LLLP Lump Sum $80,000.00 Hartland-Reliant JV, LLC Lump Sum $82,143.17 Engineer's Estimate ALL LPSM Lump Sum $42,000.00
A0700 55504-0000 PRE-FABRICATED STEEL BRIDGE (UVALDA DITCH)
ESCO Construction Co Lump Sum $106,970.00 American West Construction, Inc. Lump Sum $52,300.00 Structures Inc. Lump Sum $105,000.00 Growling Bear Co. (Inc.) Lump Sum $92,990.00 Kirkland Construction, LLLP Lump Sum $136,000.00 Hartland-Reliant JV, LLC Lump Sum $157,125.53 Engineer's Estimate ALL LPSM Lump Sum $90,000.00
9 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0720 55504-0000 PRE-FABRICATED STEEL BRIDGE (SAND CREEK LATERAL)
ESCO Construction Co Lump Sum $54,820.00 American West Construction, Inc. Lump Sum $52,300.00 Structures Inc. Lump Sum $51,000.00 Growling Bear Co. (Inc.) Lump Sum $55,200.00 Kirkland Construction, LLLP Lump Sum $70,000.00 Hartland-Reliant JV, LLC Lump Sum $77,058.72 Engineer's Estimate ALL LPSM Lump Sum $36,000.00
A0740 60201-0800 24-INCH PIPE CULVERT
ESCO Construction Co $288.00 $69,120.00 American West Construction, Inc. $160.00 $38,400.00 Structures Inc. $65.00 $15,600.00 Growling Bear Co. (Inc.) $48.00 $11,520.00 Kirkland Construction, LLLP $213.00 $51,120.00 Hartland-Reliant JV, LLC $166.38 $39,931.20 Engineer's Estimate 240 LNFT $115.00 $27,600.00
A0760 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
ESCO Construction Co $754.00 $15,080.00 American West Construction, Inc. $720.00 $14,400.00 Structures Inc. $1,300.00 $26,000.00 Growling Bear Co. (Inc.) $950.00 $19,000.00 Kirkland Construction, LLLP $1,500.00 $30,000.00 Hartland-Reliant JV, LLC $931.70 $18,634.00 Engineer's Estimate 20 EACH $1,250.00 $25,000.00
A0780 60915-1000 WHEELSTOP, CONCRETE
ESCO Construction Co $105.50 $5,908.00 American West Construction, Inc. $140.00 $7,840.00 Structures Inc. $135.00 $7,560.00 Growling Bear Co. (Inc.) $95.00 $5,320.00 Kirkland Construction, LLLP $415.00 $23,240.00 Hartland-Reliant JV, LLC $166.37 $9,316.72 Engineer's Estimate 56 EACH $200.00 $11,200.00
A0800 61501-0100 SIDEWALK, CONCRETE
ESCO Construction Co $49.20 $154,980.00 American West Construction, Inc. $86.25 $271,687.50 Structures Inc. $80.50 $253,575.00 Growling Bear Co. (Inc.) $74.00 $233,100.00 Kirkland Construction, LLLP $77.00 $242,550.00 Hartland-Reliant JV, LLC $103.55 $326,182.50 Engineer's Estimate 3,150 SQYD $140.00 $441,000.00
10 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0820 61502-1000 DRIVE PAD, CONCRETE
ESCO Construction Co $92.00 $23,000.00 American West Construction, Inc. $130.00 $32,500.00 Structures Inc. $87.00 $21,750.00 Growling Bear Co. (Inc.) $86.00 $21,500.00 Kirkland Construction, LLLP $205.00 $51,250.00 Hartland-Reliant JV, LLC $103.55 $25,887.50 Engineer's Estimate 250 SQYD $210.00 $52,500.00
A0840 61504-1000 ACCESSIBILITY RAMP, CONCRETE
ESCO Construction Co $339.50 $3,395.00 American West Construction, Inc. $440.00 $4,400.00 Structures Inc. $1,200.00 $12,000.00 Growling Bear Co. (Inc.) $92.00 $920.00 Kirkland Construction, LLLP $1,000.00 $10,000.00 Hartland-Reliant JV, LLC $332.75 $3,327.50 Engineer's Estimate 10 SQYD $185.00 $1,850.00
A0860 61901-0500 FENCE, WOVEN WIRE, 96-INCH HEIGHT
ESCO Construction Co $52.50 $31,500.00 American West Construction, Inc. $46.75 $28,050.00 Structures Inc. $57.00 $34,200.00 Growling Bear Co. (Inc.) $35.00 $21,000.00 Kirkland Construction, LLLP $40.00 $24,000.00 Hartland-Reliant JV, LLC $33.27 $19,962.00 Engineer's Estimate 600 LNFT $75.00 $45,000.00
A0880 61901-2300 FENCE, SPLIT RAIL (42-Inch)
ESCO Construction Co $38.10 $3,810.00 American West Construction, Inc. $40.25 $4,025.00 Structures Inc. $50.00 $5,000.00 Growling Bear Co. (Inc.) $30.00 $3,000.00 Kirkland Construction, LLLP $40.00 $4,000.00 Hartland-Reliant JV, LLC $30.61 $3,061.00 Engineer's Estimate 100 LNFT $30.00 $3,000.00
A0900 61901-2300 FENCE, SPLIT RAIL (36-Inch)
ESCO Construction Co $35.30 $93,545.00 American West Construction, Inc. $35.75 $94,737.50 Structures Inc. $44.00 $116,600.00 Growling Bear Co. (Inc.) $28.00 $74,200.00 Kirkland Construction, LLLP $40.00 $106,000.00 Hartland-Reliant JV, LLC $30.61 $81,116.50 Engineer's Estimate 2,650 LNFT $30.00 $79,500.00
11 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0920 61902-4900 GATE, WOVEN WIRE, 12 FEET WIDTH
ESCO Construction Co $1,920.00 $5,760.00 American West Construction, Inc. $3,500.00 $10,500.00 Structures Inc. $4,300.00 $12,900.00 Growling Bear Co. (Inc.) $950.00 $2,850.00 Kirkland Construction, LLLP $5,000.00 $15,000.00 Hartland-Reliant JV, LLC $1,730.31 $5,190.93 Engineer's Estimate 3 EACH $4,000.00 $12,000.00
A0940 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
ESCO Construction Co $106.00 $4,240.00 American West Construction, Inc. $110.00 $4,400.00 Structures Inc. $110.00 $4,400.00 Growling Bear Co. (Inc.) $102.00 $4,080.00 Kirkland Construction, LLLP $126.00 $5,040.00 Hartland-Reliant JV, LLC $186.34 $7,453.60 Engineer's Estimate 40 HOUR $110.00 $4,400.00
A0960 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
ESCO Construction Co $137.00 $2,740.00 American West Construction, Inc. $120.00 $2,400.00 Structures Inc. $125.00 $2,500.00 Growling Bear Co. (Inc.) $114.00 $2,280.00 Kirkland Construction, LLLP $93.00 $1,860.00 Hartland-Reliant JV, LLC $166.37 $3,327.40 Engineer's Estimate 20 HOUR $100.00 $2,000.00
A0980 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
ESCO Construction Co $215.50 $4,310.00 American West Construction, Inc. $150.00 $3,000.00 Structures Inc. $130.00 $2,600.00 Growling Bear Co. (Inc.) $120.00 $2,400.00 Kirkland Construction, LLLP $138.00 $2,760.00 Hartland-Reliant JV, LLC $199.65 $3,993.00 Engineer's Estimate 20 HOUR $110.00 $2,200.00
A1000 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER
ESCO Construction Co $158.00 $3,160.00 American West Construction, Inc. $380.00 $7,600.00 Structures Inc. $150.00 $3,000.00 Growling Bear Co. (Inc.) $138.00 $2,760.00 Kirkland Construction, LLLP $166.00 $3,320.00 Hartland-Reliant JV, LLC $299.47 $5,989.40 Engineer's Estimate 20 HOUR $200.00 $4,000.00
12 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1020 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
ESCO Construction Co $244.50 $4,890.00 American West Construction, Inc. $180.00 $3,600.00 Structures Inc. $140.00 $2,800.00 Growling Bear Co. (Inc.) $126.00 $2,520.00 Kirkland Construction, LLLP $177.00 $3,540.00 Hartland-Reliant JV, LLC $219.61 $4,392.20 Engineer's Estimate 20 HOUR $130.00 $2,600.00
A1040 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
ESCO Construction Co $181.50 $7,260.00 American West Construction, Inc. $190.00 $7,600.00 Structures Inc. $130.00 $5,200.00 Growling Bear Co. (Inc.) $120.00 $4,800.00 Kirkland Construction, LLLP $135.00 $5,400.00 Hartland-Reliant JV, LLC $259.54 $10,381.60 Engineer's Estimate 40 HOUR $145.00 $5,800.00
A1060 62301-0000 GENERAL LABOR
ESCO Construction Co $67.40 $2,696.00 American West Construction, Inc. $53.75 $2,150.00 Structures Inc. $48.00 $1,920.00 Growling Bear Co. (Inc.) $100.00 $4,000.00 Kirkland Construction, LLLP $98.00 $3,920.00 Hartland-Reliant JV, LLC $73.20 $2,928.00 Engineer's Estimate 40 HOUR $40.00 $1,600.00
A1080 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
ESCO Construction Co $67.40 $2,696.00 American West Construction, Inc. $180.00 $7,200.00 Structures Inc. $165.00 $6,600.00 Growling Bear Co. (Inc.) $150.00 $6,000.00 Kirkland Construction, LLLP $167.00 $6,680.00 Hartland-Reliant JV, LLC $199.65 $7,986.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00
A1100 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
ESCO Construction Co $67.40 $2,696.00 American West Construction, Inc. $180.00 $7,200.00 Structures Inc. $330.00 $13,200.00 Growling Bear Co. (Inc.) $150.00 $6,000.00 Kirkland Construction, LLLP $167.00 $6,680.00 Hartland-Reliant JV, LLC $199.65 $7,986.00 Engineer's Estimate 40 HOUR $180.00 $7,200.00
13 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1120 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
ESCO Construction Co $1.33 $82,460.00 American West Construction, Inc. $1.25 $77,500.00 Structures Inc. $1.00 $62,000.00 Growling Bear Co. (Inc.) $10.00 $620,000.00 Kirkland Construction, LLLP $1.80 $111,600.00 Hartland-Reliant JV, LLC $3.39 $210,180.00 Engineer's Estimate 62,000 SQYD $2.00 $124,000.00
A1140 62510-2000 SEEDING, HYDRAULIC METHOD
ESCO Construction Co $638.00 $8,294.00 American West Construction, Inc. $1,500.00 $19,500.00 Structures Inc. $600.00 $7,800.00 Growling Bear Co. (Inc.) $1,601.00 $20,813.00 Kirkland Construction, LLLP $1,900.00 $24,700.00 Hartland-Reliant JV, LLC $905.08 $11,766.04 Engineer's Estimate 13.0 ACRE $2,000.00 $26,000.00
A1160 62515-2000 MULCHING, HYDRAULIC METHOD
ESCO Construction Co $1,000.00 $13,000.00 American West Construction, Inc. $2,000.00 $26,000.00 Structures Inc. $950.00 $12,350.00 Growling Bear Co. (Inc.) $1,775.00 $23,075.00 Kirkland Construction, LLLP $1,400.00 $18,200.00 Hartland-Reliant JV, LLC $2,608.77 $33,914.01 Engineer's Estimate 13.0 ACRE $2,200.00 $28,600.00
A1180 63301-0000 SIGN SYSTEM
ESCO Construction Co $123.00 $8,610.00 American West Construction, Inc. $640.00 $44,800.00 Structures Inc. $500.00 $35,000.00 Growling Bear Co. (Inc.) $804.00 $56,280.00 Kirkland Construction, LLLP $650.00 $45,500.00 Hartland-Reliant JV, LLC $732.05 $51,243.50 Engineer's Estimate 70 EACH $300.00 $21,000.00
A1200 63309-0000 DELINEATOR
ESCO Construction Co $29.30 $586.00 American West Construction, Inc. $49.25 $985.00 Structures Inc. $70.00 $1,400.00 Growling Bear Co. (Inc.) $125.00 $2,500.00 Kirkland Construction, LLLP $50.00 $1,000.00 Hartland-Reliant JV, LLC $133.10 $2,662.00 Engineer's Estimate 20 EACH $40.00 $800.00
14 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1220 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
ESCO Construction Co $0.42 $3,486.00 American West Construction, Inc. $0.40 $3,320.00 Structures Inc. $1.30 $10,790.00 Growling Bear Co. (Inc.) $1.00 $8,300.00 Kirkland Construction, LLLP $0.85 $7,055.00 Hartland-Reliant JV, LLC $0.79 $6,557.00 Engineer's Estimate 8,300 LNFT $0.40 $3,320.00
A1240 63405-0050 PAVEMENT MARKINGS, SYMBOLS (ACCESSIBILITY SYMBOL)
ESCO Construction Co $512.50 $2,050.00 American West Construction, Inc. $490.00 $1,960.00 Structures Inc. $2,750.00 $11,000.00 Growling Bear Co. (Inc.) $35.00 $140.00 Kirkland Construction, LLLP $1,100.00 $4,400.00 Hartland-Reliant JV, LLC $598.95 $2,395.80 Engineer's Estimate 4 EACH $150.00 $600.00
A1260 63501-0000 TEMPORARY TRAFFIC CONTROL
ESCO Construction Co Lump Sum $55,260.00 American West Construction, Inc. Lump Sum $17,000.00 Structures Inc. Lump Sum $105,000.00 Growling Bear Co. (Inc.) Lump Sum $50,000.00 Kirkland Construction, LLLP Lump Sum $67,000.00 Hartland-Reliant JV, LLC Lump Sum $66,550.41 Engineer's Estimate ALL LPSM Lump Sum $6,000.00
A1280 63601-1000 SYSTEM INSTALLATION, TRAFFIC SIGNAL
ESCO Construction Co Lump Sum $13,740.00 American West Construction, Inc. Lump Sum $15,000.00 Structures Inc. Lump Sum $20,500.00 Growling Bear Co. (Inc.) Lump Sum $26,250.00 Kirkland Construction, LLLP Lump Sum $30,000.00 Hartland-Reliant JV, LLC Lump Sum $18,051.13 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
A1300 64603-0000 FIXTURE (TIMBER ARCH STRUCTURE)
ESCO Construction Co $2,180.00 $13,080.00 American West Construction, Inc. $2,300.00 $13,800.00 Structures Inc. $2,500.00 $15,000.00 Growling Bear Co. (Inc.) $950.00 $5,700.00 Kirkland Construction, LLLP $5,600.00 $33,600.00 Hartland-Reliant JV, LLC $1,996.51 $11,979.06 Engineer's Estimate 6 EACH $4,000.00 $24,000.00
15 out of 15Source Selection Information - See FAR 2.101 & 3.104
Project No: CO FLAP DEN56(1)
Project Name: Access connections to ROAR
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1320 64603-0000 FIXTURE (DUAL VESTIBULE GATES)
ESCO Construction Co $1,920.00 $9,600.00 American West Construction, Inc. $5,700.00 $28,500.00 Structures Inc. $6,100.00 $30,500.00 Growling Bear Co. (Inc.) $1,650.00 $8,250.00 Kirkland Construction, LLLP $11,000.00 $55,000.00 Hartland-Reliant JV, LLC $5,590.23 $27,951.15 Engineer's Estimate 5 EACH $5,000.00 $25,000.00
A1340 64603-0800 FIXTURE, KIOSK
ESCO Construction Co $19,940.00 $39,880.00 American West Construction, Inc. $6,500.00 $13,000.00 Structures Inc. $7,600.00 $15,200.00 Growling Bear Co. (Inc.) $4,000.00 $8,000.00 Kirkland Construction, LLLP $11,000.00 $22,000.00 Hartland-Reliant JV, LLC $6,655.04 $13,310.08 Engineer's Estimate 2 EACH $9,000.00 $18,000.00
A1360 64604-3000 FIXTURE, PEDESTRIAN RAILING
ESCO Construction Co $329.50 $56,015.00 American West Construction, Inc. $339.00 $57,630.00 Structures Inc. $420.00 $71,400.00 Growling Bear Co. (Inc.) $363.00 $61,710.00 Kirkland Construction, LLLP $508.00 $86,360.00 Hartland-Reliant JV, LLC $609.26 $103,574.20 Engineer's Estimate 170 LNFT $85.00 $14,450.00
Total Schedule - All Items
ESCO Construction Co $2,952,704.14 American West Construction, Inc. $3,186,167.25 Structures Inc. $3,566,424.50 Growling Bear Co. (Inc.) $3,783,747.36 Kirkland Construction, LLLP $4,414,899.00 Hartland-Reliant JV, LLC $4,986,922.25 Engineer's Estimate $2,950,000.00