QnA_10.16.19.pdf
PDF 97 KB Posted
- Attached to
- CO FLAP DEN 56(1) Access Connections to ROAR Federal contract opportunity
- Solicitation number
- 6982AF19B000013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Tabulation CO FLAP DEN56(1) Access Connections to ROAR.pdf | ||
| Bid_Opening_Summary_-__CO_FLAP_DEN_56(1)_Access_Connections_to_ROAR.pdf | ||
| QnA_10.28.19.pdf | ||
| Amendment_A002.pdf | ||
| A001.pdf | ||
| Access_Connections_to_ROAR_Final_Hydraulics_Report.pdf | ||
| CO_FLAP_DEN56(1)_100__2019-9-10.pdf | ||
| RMA_Geotech_Report_20190627.pdf | ||
| 6982AF19B000013.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for CO FLAP DEN56(1) Access Connections to ROAR
October 16, 2019
Questions Answers 1 It states in the Steel Structures Specification that the manufacturer is to provide bridge railing configuration as shown in the plans.
However, the plans show for horizontal railing in the elevations and vertical pickets in the cross section. What is the railing configuration of the bridge? What is the railing/picket spacing to be? Is the configuration to resemble the approach railing?
For the hand railing layout, the bridge section sheet shows 3.5’ height to the hand railing and a 6” toe plate that need to be met. Provide vertical pickets. Picket or railing spacing are up to the manufacturer to decide, but need to comply with AASHTO Standards.