Amendment 0002 Carrizo Work Center Septic System and Rehabilitation

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240LT22Q0076
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Pritchett, Colorado 81073, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals to complete septic system rehabilitation and building repair work at the Carrizo Work Center in Colorado. The contractor will be responsible for removing and replacing septic tanks and leach fields, doors, plumbing fixtures, carpeting, siding, and installing a water filter housing. The contractor must also conduct mold testing and remediation. The soliciting agency is the U.S. Department of Agriculture Forest Service. Proposals are due by August 15th and the work must be completed between August 31st and December 31st, 2022. Evaluation criteria will include technical qualifications, past performance, and price. A pre-proposal site visit will be held on August 1st.

This opportunity is set aside for total small businesses. The primary NAICS code is 238220 and PSC code R499. The place of performance is the Carrizo Work Center in Pritchett, Colorado. The solicitation includes detailed specifications on the scope of repairs and replacements. The period of performance is approximately four months to complete all work by December 31st, 2022. Submittals will be required throughout the project, with a submittal register outlining 34 required documents.

Notice text

3 versions

Update #3 · Latest ·

The purpose of Amendment 0002, Solicitation No: 1240LT22Q0076, Carrizo Work Center Septic System
and Rehabilitation is to A) Update Section L to closely align with Section M and B) answer questions from Industry.

Respondents to the solicitation must sign and return a copy of Amendment with the proposal.

Questions may be addressed to lee.audet@usda.gov, 713-870-8809.

All Amendments must be acknowledged and returned with the bid as stated in Block 11 (a) of the SF30.

The submittal of bids has NOT been extended and remains 8/15/2022 5:00p.m.  local time.

The purpose of Amendment 001, Solicitation No: 1240LT22Q0076, Carrizo Work Center Septic System and Rehabilitation is to 1) change the NAICS from 236220–Commercial and Institutional Building Construction to 237110 - Water and Sewer Line and Related Structures Construction, and 2) answer questions from Industry. Respondents to the solicitation must sign and return a copy of Amendment with the proposal. Questions may be addressed to lee.audet@usda.gov, 713-870-8809. Please see attachment 1240LT22Q0076 Amendment 0001.

All Amendments must be acknowledged and returned with the bid as stated in Block 11 (a) of the SF30.

The submittal of bids has NOT been extended and remains 8/15/2022 5:00p.m.  local time.

This project is in Baca County at 26163 County Road 19 Pritchett, Colorado 81073.

Contractor will supply all materials, personnel, equipment, and supervision to complete all work
as described within the attached Specifications and drawings to include all necessary valid
licenses and permits as required within the Specifications.
1. Removing the existing septic tanks for the dwelling and the shop and installing a new system
and leaching field for both the shop and dwelling.
2. Removing the current exterior basement door and installing a new one and removing and
installing a new interior basement door. Also, removing and replacing the south entrance
metal door on the shop.
3. Installing a new sewage injector in the basement of the dwelling as well as installing new
lavatory, toilet, and shower/tub combination in the basement bathroom and the shop
bathroom.
4. Test and remediate the mold in the basement of the dwelling and clean the biohazardous
waste (rodent waste) inside the shop.
5. Removing and replacing all carpet in the basement and the stairwell to the basement
6. Removing and installing new siding on the exterior of the dwelling and painting the new
siding.
7. Installing a filter housing in the distribution line for the potable water system.
8. Environmental mitigation for mold and hantavirus cleanup
9. Mold Testing and Remediation
See attached specifications for all work needed for project.

Site visit will be held:
Date: August 1, 2022
Time: 10:00 local time to 12:00
Location: Carrizo Work Center on the Comanche National Grasslands
26163 County Road 19, Pritchett, CO 81073

Proposals are due August 15, 2022

Period of Performance  08/31/2022 - 12/31/2022

Update #2 ·

The purpose of Amendment 001, Solicitation No: 1240LT22Q0076, Carrizo Work Center Septic System and Rehabilitation is to 1) change the NAICS from 236220–Commercial and Institutional Building Construction to 237110 - Water and Sewer Line and Related Structures Construction, and 2) answer questions from Industry. Respondents to the solicitation must sign and return a copy of Amendment with the proposal. Questions may be addressed to lee.audet@usda.gov, 713-870-8809. Please see attachment 1240LT22Q0076 Amendment 0001.

All Amendments must be acknowledged and returned with the bid as stated in Block 11 (a) of the SF30.

The submittal of bids has NOT been extended and remains 8/15/2022 5:00p.m.  local time.

This project is in Baca County at 26163 County Road 19 Pritchett, Colorado 81073.

Contractor will supply all materials, personnel, equipment, and supervision to complete all work
as described within the attached Specifications and drawings to include all necessary valid
licenses and permits as required within the Specifications.
1. Removing the existing septic tanks for the dwelling and the shop and installing a new system
and leaching field for both the shop and dwelling.
2. Removing the current exterior basement door and installing a new one and removing and
installing a new interior basement door. Also, removing and replacing the south entrance
metal door on the shop.
3. Installing a new sewage injector in the basement of the dwelling as well as installing new
lavatory, toilet, and shower/tub combination in the basement bathroom and the shop
bathroom.
4. Test and remediate the mold in the basement of the dwelling and clean the biohazardous
waste (rodent waste) inside the shop.
5. Removing and replacing all carpet in the basement and the stairwell to the basement
6. Removing and installing new siding on the exterior of the dwelling and painting the new
siding.
7. Installing a filter housing in the distribution line for the potable water system.
8. Environmental mitigation for mold and hantavirus cleanup
9. Mold Testing and Remediation
See attached specifications for all work needed for project.

Site visit will be held:
Date: August 1, 2022
Time: 10:00 local time to 12:00
Location: Carrizo Work Center on the Comanche National Grasslands
26163 County Road 19, Pritchett, CO 81073

Proposals are due August 15, 2022

Period of Performance  08/31/2022 - 12/31/2022

Update #1 ·

Contractor will supply all materials, personnel, equipment, and supervision to complete all work
as described within the attached Specifications and drawings to include all necessary valid
licenses and permits as required within the Specifications.
1. Removing the existing septic tanks for the dwelling and the shop and installing a new system
and leaching field for both the shop and dwelling.
2. Removing the current exterior basement door and installing a new one and removing and
installing a new interior basement door. Also, removing and replacing the south entrance
metal door on the shop.
3. Installing a new sewage injector in the basement of the dwelling as well as installing new
lavatory, toilet, and shower/tub combination in the basement bathroom and the shop
bathroom.
4. Test and remediate the mold in the basement of the dwelling and clean the biohazardous
waste (rodent waste) inside the shop.
5. Removing and replacing all carpet in the basement and the stairwell to the basement
6. Removing and installing new siding on the exterior of the dwelling and painting the new
siding.
7. Installing a filter housing in the distribution line for the potable water system.
8. Environmental mitigation for mold and hantavirus cleanup
9. Mold Testing and Remediation
See attached specifications for all work needed for project.

Site visit will be held:
Date: August 1, 2022
Time: 10:00 local time to 12:00
Location: Carrizo Work Center on the Comanche National Grasslands
26163 County Road 19, Pritchett, CO 81073

Proposals are due August 15, 2022

Period of Performance  08/31/2022 - 12/31/2022

Files

Notice history

Notice Type Posted
Carrizo Work Center Septic System and Rehabilitation Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Jennifer Brown (COW) Ridgefield, Washington, United States · NAICS 237110 Indian Health Service Total Small Business
SLV-CB pumping plant roof 16399 Lane 6 N Mosca, Colorado 81146, United States · NAICS 238160 Bureau of Reclamation Total Small Business
USSPACECOM Portable Restroom Rental and Maintenance 2515 Aviation Way, Colorado Springs, CO 80916 Colorado Springs, Colorado 80916, United States · NAICS 562991 Naval Information Warfare Systems Command Total Small Business
YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hod NAICS 237110 — No set-aside
East canal efficiency improvements NAICS 237110 Bureau of Reclamation Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity