Cape Cod Canal, West Boat Basin - Mooring Piles and Dock Replacement

Closed Solicitation Posted

Solicitation number
W912WJ24B0002
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, New England District is seeking a contractor to complete mooring piles and dock replacement at the Cape Cod Canal's West Boat Basin in Bourne, Massachusetts. The project involves demolishing and replacing Dock 1, repairing three additional docks (Docks 2-4), and removing and replacing eight steel pile mooring dolphins. Contractors must submit proposals electronically through the Procurement Integrated Enterprise Environment (PIEE) by April 4, 2024, at 1:00 PM Eastern Time. The solicitation will evaluate bids from responsible sources, with the contract specialist available to answer questions via email. The agency will consider technical capabilities, compliance with specifications, and overall bid responsiveness during the evaluation process.

This solicitation is exclusively set aside for certified small businesses under NAICS code 237990, with a size standard of $45 million. The project has an estimated magnitude between $1,000,000 and $5,000,000, with a period of performance of approximately 365 days. The work includes specific technical requirements such as installing new lumber, fiberglass reinforced grate walking surfaces, power pedestals, and light fixtures, with optional bidding for floating dock replacements. There are no time-of-year restrictions for in-water work, though contractors must implement a "soft start" procedure during pile driving to mitigate potential impacts on endangered species. The project site is located at the West Boat Basin, and all work will be performed in the Bourne, Massachusetts area.

Notice text

The U.S. Army Corps of Engineers, New England District is issuing a set aside for certified small business contractors for the Mooring Piles and Dock Replacement project at the West Boat Basin located at the Cape Cod Canal, Bourne, Massachusetts. The NAICS code for the work described below is 237990 with a size standard of $45M. The period of performance will be approximately 365 days. The estimated magnitude of this project is between $1,000,000 and $5,000,000. Docks:There are four dock structures within the West Boat Basin. One of the docks shall be demolished and replaced while the other three docks shall be repaired.Dock 1, both the timber and steel docks, shall be demolished in its entirety except for the existing timber piles, which shall remain in place and shall be reused for the construction of a new dock at this location. The new dock structure shall include new lumber, new fiberglass reinforced grate walking surfaces, new connectors, and other new items as necessary. This dock requires the removal and replacement of the existing power pedestal, light pole, and tide gauge. In addition to providing this new dock, a new adjacent pre-engineered floating dock with connecting gangway shall be installed. On the landside, the existing concrete sidewalk that abuts the dock shall be removed and replaced. Similarly, the electrical handhole and 75-feet of electrical conduit attached to the underside of this dock shall be replaced.The other three docks (Docks 2, 3, and 4) require repair work to the adjacent concrete sidewalks, and replacement of the existing stairs, handrails, electrical power pedestals, and light fixtures. Optional bid will include replacement of the floating docks on these three docks.Mooring Piles:There are 16 steel pile mooring dolphins within the West Boat Basin. Five of these 16 dolphins, cluster H-Piles at approximate pile lengths of 80 feet and located adjacent to Dock #1, shall be removed in their entireties. These five are as follows:1. Dolphin Pile ?L? - 21 H-Piles2. Dolphin Pile ?M? - 7 H-Piles3. Dolphin Pile ?N? - 5 H-Piles4. Dolphin Pile ?O? - 5 H-Piles5. Dolphin Pile ?P? - 3 H-PilesThree of these 16 dolphins, cluster H-Piles at approximate pile lengths of 80 feet and located adjacent to Dock #4, shall be removed two feet below the mudline and replaced with one 60-inch diameter steel pipe pile and two 48-inch diameter steel pipe piles. These three are as follows:1. Dolphin Pile ?A? - 21 H-Piles (replace with 60-inch diameter steel pipe pile)2. Dolphin Pile ?B? - 7 H-Piles (replace with 48-inch diameter steel pipe pile)3. Dolphin Pile ?C? - 3 H-Piles (replace with 48-inch diameter steel pipe pile) There are no time of year restrictions for in-water work for this project. However, if pile driving is occurring, the noise is anticipated to be above the behavioral noise threshold for ESA-listed species that may be present in the West Boat Basin. A ?soft start? shall be required to allow animals an opportunity to leave the project vicinity before sound pressure levels increase. In addition to using a soft start at the beginning of the workday for pile driving, one must also be used at any time following cessation of pile driving for a period of 30 minutes or longer. Please note that this solicitation is set aside for certified small businesses. Neither telephonic, mailed, nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to view the solicitation offerors must access the System for Award Management website (www.sam.gov). In order to download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the USACE New England District. Additional questions may be emailed to the Contract Specialist Brian.T.Mannion@usace.army.mil.

Files

File Type Posted
Bid Abstract.pdf PDF
Amendment 0007.pdf PDF
Amendment 0001.pdf PDF
Amendment 0005.pdf PDF
Amendment 0001.pdf PDF
Amendment 0003.pdf PDF
Site Visit Sign In Sheet.pdf PDF
Amendment 0002.pdf PDF
Amendment 0006.pdf PDF
Amendment 0004.pdf PDF
Revised Specifications.pdf PDF
Amendment 0005.pdf PDF
Show all 12

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Cape Cod Canal, West Boat Basin – Mooring Piles & Dock Replacement Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
JP Murtha Float Mooring Bitts Retrofit JP Murtha Locks and DamMonongahela River BasinGibsonton Road, Monessen, PA 15062 15062 · NAICS 237990 ENDIST Pittsburgh No set-aside
Dry-Dock: USCG STA CAPE MAY (45665) FY27 UWB NAICS 336611 Coast Guard Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity