CA YOSE 1022(1) Valley Day-Use Parking Phase II

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF21SS000012
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Yosemite National Park CA 95389, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This project involves expanding parking capacity at Yosemite National Park through the construction of a 250-space parking lot and improvements to an existing 350-space lot, to be administered by the Federal Highway Administration Central Federal Lands Highway Division. Interested parties must submit statements of intention and qualifications by May 13, 2021 to be considered for the estimated $3-5 million contract. Experience completing similar projects in national parks, forests, or comparable environments is required. The work will be advertised in July 2021 with construction occurring from October 2021 through May 2022.

There are no set-aside designations for this opportunity. The principal work includes 3,000 tons of asphalt paving, 2,500 tons of roadway aggregate, 11,000 square yards of roadbed reconditioning, 1,000 cubic yards of embankment work, 2,000 linear feet of concrete curb, 1,500 linear feet of gutter, and 400 square yards of sidewalk. Key aspects are expanding the parking capacity by 250 spaces at Yosemite Village and improving drainage and paving an existing 350-space lot to better accommodate visitor traffic in this primary arrival area.

Notice text

PROJECT DETAILS:

This project will consist of the construction of a 250-space parking lot adjacent to the existing Yosemite Village Store parking lot and drainage improvements and paving of the unpaved portions of the 350-space Valley Day-Use South parking lot originally constructed in 2017, within Yosemite Valley in Yosemite National Park, CA.  This project increases the day-use parking capacity at the primary arrival point for incoming motorists who have no campsite or hotel reservations and improves pedestrian circulation and access from the parking lots to the visitor center in the Yosemite Village area.

The estimated price range is between $3,000,000 and $5,000,000. The anticipated advertisement date for the project is July 2021 with construction anticipated from October 2021 to May 2022.

All of the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints that will affect the construction schedule and type of operations.  Great attention to detail will be required in achieving customer satisfaction in areas of roadway and parking lot construction, traffic control, visitor relations and timely completion of work.  Prior experience on projects of similar magnitude within National Parks, National Forests, or similar environments is required.

Principle work items include:

3,000 tons of asphalt concrete pavement, type 1,

2,500 tons of roadway aggregate,

11,000 square yards of roadbed reconditioning,

1,000 cubic yards of roadway embankment,

2,000 linear feet of concrete curb,

1,500 linear feet of concrete gutter, and

400 square yards of concrete sidewalk

Files

File Type Posted
Amendment A001.pdf PDF

Notice history

Notice Type Posted
CA YOSE 1022(1) Valley Day-Use Parking Phase II Award Award Notice
CA YOSE 1022(1) Valley Day-Use Parking Phase II Latest solicitation Solicitation
CA YOSE 1022(1) Valley Day-Use Parking Phase II Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Administrative Parking Lot Repairs Colorado 80526, United States · NAICS 237310 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity