CA FLAP SR89(2), Meeks Bay Trail

Awarded Award Notice Posted

Solicitation number
DTFH6817B00002
Agency
Federal Highway Administration Department of Transportation
Awarded
to Herback General Engineering LLC
Set-aside
HUBZone

Opportunity facts

Contract number
6982AF18C000016 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Lake Tahoe Basin National Forest, El Dorado County, California, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: Dec 14, 2017 3:04 pm PROJECT NUMBER: CA FLAP SR 89(2)

PROJECT NAME: Meeks Bay Trail and Tahoe City Sidewalk and Bike Trail Project


PROJECT DESCRIPTION:


The Meeks Bay Trail (Schedule A) is located on the west shore of Lake Tahoe approximately 10 miles south of Tahoe City and 18 miles northwest of South Lake Tahoe in eastern El Dorado County, California. The project includes construction of a 0.7-mile long Class 1 Bike Path on a new alignment. The bike path will start at the Meeks Bay Resort & Marina and end at the existing path near Sugar Pine Point State Park. Project improvements include a bike/pedestrian Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS) over a drainage channel, bicycle railings, rockeries, and water quality features to treat runoff from the SR 89 ROW. The project includes four crossings of private driveways and one crossing of a culvert.


The Tahoe City Sidewalk and Bike Trail Project (Option X) is located in Tahoe City, California near the SR 89 and SR 28 intersection area. The project includes 0.4 miles of bike path construction, broken into three separate locations. The project also includes 0.25 miles of sidewalk construction at three separate locations. The project also includes the addition of lighting infrastructure along West Lake Boulevard. The project will tie into the existing Truckee River Bridge project.



SIGNIFICANT QUANTITIES:


Schedule A: (0.71 miles of 10' paved bike path, GRS-IBS Bridge, and rockeries) - Significant items include (quantities are subject to change):


• Removal of 55 trees
• 2,500 CY of Roadway Excavation
• 450 CY of Rockeries
• 1,000 Tons of Hot Asphalt Concrete Pavement
• 1,500 CY of Roadway Aggregate
• 1 - Prefabricated weathering steel pedestrian bridge, 65' long
• 1,700 feet of pedestrian railing


Option X: - Significant items include (quantities are subject to change):
• 0.25 miles of Lighting Improvements
• 700 Tons of Asphalt Concrete Pavement
• 800 SY of Concrete Sidewalk


The expected release of the solicitation is early January, 2018.


The price range of this project work is between $1 and $5 million.


This will be set-aside for HUBZone Small Business Concerns.

Attachments

Files attached to this notice, newest first
File Type Posted
CA_FLAP_SR89(2)_Bid_Opening_Summary.pdf PDF
A004.pdf PDF
QnA_1.30.18.pdf PDF
QnA_1.25.18.pdf PDF
A003.pdf PDF
QnA_1.16.18.pdf PDF
QnA_1.9.18.pdf PDF
A002.pdf PDF
A001.pdf PDF
CA_FLAP_SR89(2)_OptionX_Plans_Final.pdf PDF
CA_FLAP_SR89(2)_OptionX_Plans_Final.pdf PDF
DTFH6817B00002.pdf PDF
CA_FLAP_SR89(2)_MeeksBayBikeTrail_DrainageReport_v2.pdf PDF
Meeks_Bay_BikeBridge-Final_GeotechReport.pdf PDF
CA_FLAP_SR_89(2)_Schedule_A_Plans_Final.pdf PDF
Meeks_Bay_Hydraulics_Report.pdf PDF
Show all 16

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity