QnA_1.16.18.pdf

PDF 266 KB Posted

Attached to
CA FLAP SR89(2), Meeks Bay Trail Federal contract opportunity
Solicitation number
DTFH6817B00002
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to CA FLAP SR89(2), Meeks Bay Trail, newest first.
File Type Posted
CA_FLAP_SR89(2)_Bid_Opening_Summary.pdf PDF
A004.pdf PDF
QnA_1.30.18.pdf PDF
QnA_1.25.18.pdf PDF
A003.pdf PDF
QnA_1.9.18.pdf PDF
A002.pdf PDF
A001.pdf PDF
CA_FLAP_SR89(2)_OptionX_Plans_Final.pdf PDF
CA_FLAP_SR89(2)_MeeksBayBikeTrail_DrainageReport_v2.pdf PDF
CA_FLAP_SR89(2)_OptionX_Plans_Final.pdf PDF
DTFH6817B00002.pdf PDF
Meeks_Bay_BikeBridge-Final_GeotechReport.pdf PDF
CA_FLAP_SR_89(2)_Schedule_A_Plans_Final.pdf PDF
Meeks_Bay_Hydraulics_Report.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for

CA FLAP SR89(2) MEEKS BAY TRAIL

January 9, 2017

Questions Answers

1 Clarification of Note 6 on Sheet 1 of 2 Option X Erosion Control

Plan (RECP shall include seeding?)

a. Is this seeding separate from the seeding on the Bid

Schedule? Bid Schedule shows 0.5 Acres of Hydro-seeding but Schedule A and Option X RECP is more than that.

For Option X, pay item 62901-0000 Rolled Erosion Control Product includes the seeding required for the associated area, and is separate from the seeding in pay item 62510-2000. Note that seeding is not allowed with the Schedule A rolled erosion control product.

2 Clarification of sequence and materials application rates for Item

62510-2000. (What are the materials and application rates and what sequence are they applied)?

a. For instance; Mulch, Fertilizer, Seed, Tackifier, Dye

b. Application rates for each

c. One step hydro-seeding, two step hydro-seeding, etc…

Construct consistent with the requirements of Section 625 of the Special

Contract Requirements and Standard Specifications.

3 Page E-121 of the Project Specifications calls for seed to be applied at 35lbs/acre but the seed mix listed only amounts to 11.25lbs/acre

The seed mix application rate in Section 625.03 (Page E-121), second paragraph, last sentence is revised from 35 lbs/acre to 11.25 lbs/acre which now matches the seed mix table total.

4 Clarification of sequence and materials application rates for Item

62515-2000. (What are the materials and application rates and what sequence are they applied)?

a. What type of Mulch? Wood, straw, etc…

b. Tackifier

c. Other

d. Application rates for each

Construct consistent with the requirements of Section 625.08, 713.05 and

713.11 of the Special Contract Requirements and Standard

Specifications.

5 What sheet shows the location of areas to be hydro-seeded? For Option X, see Sheets E1 and E2. Areas are designated by hatching which is defined by the Legend on Sheet A2.

6 What Sheet/s show Temporary Plastic Fence?

For Schedule A and Option X, see E-Series Sheets.

7 This project has a bid item for System Installation, Changeable

Message Sign. Item No. 63601-5000. Plan Sheet 84 says this work is shown in section T, Permanent Traffic Control.

Where is the work for this item shown in the plans. I didn’t see it in section T or any other section.

See Special Contract Requirements Section 635.07 – Construction Signs

(Page E-138) which calls for the use of at least 2 changeable message signs to inform public traffic for Schedule A. Contractor will incorporate the changeable message signs into their traffic control plan for SR-89 and compliance with the Caltrans encroachment permit.

January 16, 2017

Questions Answers

8 Please clarify electrical infrastructure currently in place that we will be tying into and use.

Conduit and pull boxes shown on Sheets W1 and W2 are existing. This infrastructure should be used to route cable and connect to County

Lighting Standard. Existing Service location is indicated on Sheet W2, key note 1.

9 Stone Masonry Rock specs says rock used is to be natural to the area in color, shape, and size. Is there current Stone Masonry in place to match? Clarification of actual rock to be used for the wall is requested for pricing and trucking purposes.

The intent is to use rock that matches the type of rock you would find in the project area and Lake Tahoe Area. As an example, the entrance to

Meeks Bay Resort has some stone masonry that is already in place. See photo below.