A002.pdf
PDF 5 MB Posted
- Attached to
- CA FLAP SR89(2), Meeks Bay Trail Federal contract opportunity
- Solicitation number
- DTFH6817B00002
About this file
Amendment A002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CA_FLAP_SR89(2)_Bid_Opening_Summary.pdf | ||
| A004.pdf | ||
| QnA_1.30.18.pdf | ||
| QnA_1.25.18.pdf | ||
| A003.pdf | ||
| QnA_1.16.18.pdf | ||
| QnA_1.9.18.pdf | ||
| A001.pdf | ||
| CA_FLAP_SR89(2)_OptionX_Plans_Final.pdf | ||
| CA_FLAP_SR89(2)_OptionX_Plans_Final.pdf | ||
| DTFH6817B00002.pdf | ||
| Meeks_Bay_BikeBridge-Final_GeotechReport.pdf | ||
| CA_FLAP_SR_89(2)_Schedule_A_Plans_Final.pdf | ||
| CA_FLAP_SR89(2)_MeeksBayBikeTrail_DrainageReport_v2.pdf | ||
| Meeks_Bay_Hydraulics_Report.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Amendment A002
DI
SPRING
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
A2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 1 of 2
Table
Updated Index to Sheets
AMENDMENT 002:
Revised: January 5, 2018
STATE PROJECT
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA
DIST COUNTY ROUTE
TOTAL PROJECT
POST MILES
03 89PLA 5.9/8.5
OPTION X
CA FLAP SR 89(2)
d e n p w p p w ic s w o r k in g A S y m S
R
A T P .d g n
A
M
FLAG POLE
LOT 1
LOT 2
LOT 3 LOT 7
LOT 8
LOT 9
1 6
T
Y
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA
DIST COUNTY ROUTE
TOTAL PROJECT
POST MILES
03 89PLA 5.9/8.5
OPTION X
CA FLAP SR 89(2)
d e n p w p p w ic s w o r k in g A
M a p S
R
A T P .d g n
A
M
SITE MAP
1000'500'0
Scale in Feet
A6
Truckee
Truckee RiverTrail
Riv er
Ta ho e R im
Tr ai l
Granlibakken Rd.
L a k e
T a h o e
T a h o e T a v e rn R d
Tahoe
City
"C
L in e
Transit Center
Tahoe City
Section 12
Section 7
Section 1 Section 6
R a n g e
E
R a n g e
E
S R
SR
W e s t
L a k e B o u le v a r d
14 miles to Incline Village, NV
28 miles to South Lake Tahoe, CA
13 miles to Truckee, CA
F a irw a y D r.
"B K
L in e
25+
30+
"BK2" Line
20+00
320+
325+
L in e
B
K
E 7087632.48
N 2190697.47
End "BK3" Line
32+67.13
E 7087623.85
N 2190460.73
Begin "BK3" Line
30+00.00
E 7087640.43
N 2190350.91
End "BK2" Line
32+88.20
E 7086610.43
N 2190765.09
Begin "BK2" Line
20+00.00
E 7086941.39
N 2191793.25
Begin Sidewalk #1
321+83.67
E 7087286.72
N 2192219.01
End Sidewalk #1
327+31.87
OPTION X
CA FLAP SR 89(2)
5+
120+00
115+00
110+00
E 7087828.12
N 2191981.63
End Lighting Improvements
122+21.19
E 7087777.29
N 2190809.87
Begin Lighting Improvements
110+33.24
M a c in a w R d
E 7087709.01
N 2192710.96
Begin Sidewalk #3
333+97.13
NOTE:
1.
coordinated with the CO.
Staging areas to be
E 7086654.90
N 2191371.11
Begin "BK1" Line
24+89.24
E 7086969.05
N 2191793.03
End "BK1" Line
30+31.01
E 7087898.76
N 2192823.60
End Sidewalk #3
336+15.19 end station coordinate, updated BK3
Updated SW#3 Easting
AMENDMENT 002:
NO SCALE
A7
6" Aggregate base
(Placed in 2 equal lifts)
4" asphalt concrete pavement
Shldr. Shldr.
5' 5'2' 2'
Varies
Existing Ground
Varies
Edge typ.
30° Safety
5' 5'
Clearing and construction limits pavement)
(top of
Profile grade
Slope Stake Limit
Slope Stake Limit
Fog Seal
TYPICAL SECTION
SHARED USE PATH
CANTILEVER WALL
CONCRETE
Concrete Cantilever Wall (Caltrans Type 1A) Retaining Wall 25801-0000 Reinforced Concrete
TYPICAL SECTION
B=2.5'F=2.5' cut slope
Rounded
2.5'
DETAIL
ROUNDED SLOPE
seeding limits
Topsoil and
Type B1-6 curb
4.
Varies
Varies pavement
Sawcut existing
6" Concrete
Type A1-6 curb
(incidental to concrete)
4" Bedding material
4" Concrete
Detail this sheet See Rounded Slope
Reset Fence height of C.I.P. wall
See wall profiles for curb and gutter
Type A2-6 pavement
Sawcut existing
(incidental to concrete)
4" Bedding material
4" Concrete
See Driveway Special 609-A pavement existing
Sawcut
7% m ax.
seeding limits Topsoil and seeding limits Topsoil and
(incidental to concrete)
4" Bedding material
Tack coat existing pavement Sawcut
8.
APPROACH ROAD SUMMARY
Name Width (ft) RemarksStation/Alignment
DW4
DW3
DW2
DW1
40'
32.5'
40'
45'
Sidewalk #1
Sidewalk #1
Sidewalk #1
Sidewalk #1
327+11.87/"C" Line
326+27.17/"C" Line
323+90.36/"C" Line
322+71.76/"C" Line
2.1'8'
NOTES:
2.
2.
3.
1.
10.
See Sheet D3 Varies
Station to Station
LENGTH OF PROJECT
TOTAL (mi)
TOTALS (ft)
(ft)
Bike Path
1,288
0.40
2,097
Sidewalk 1 and Sidewalk 3 stationing is along mainline.
Lighting Improvements 110+33.24 to 122+21.19.Note:
(ft)
Sidewalk
Sidewalk 3 333+97.13 TO 336+15.19
Sidewalk 1 321+83.67 TO 327+31.87
"BK3" 30+00.00 TO 32+67.13
"BK2" 20+00.00 TO 32+88.20
"BK1" 24+89.24 TO 30+31.01
0.15
766326+46.04 to 326+89.35/"C" Line
324+12.97 to 326+08.43/"C" Line
322+97.07 to 323+67.65/"C" Line
322+08.51 to 322+46.26/"C" Line
TYPICAL SECTION
SIDEWALK #1
gutter grade
" above 2 ramp, of driveway
Lip at bottom
(See Approach Road Summary table for stationing)
DRIVEWAY TYPICAL SECTION
SIDEWALK #1
6" Concrete
Type A1-6 curb
(incidental to concrete)
4" Bedding material existing pavement Sawcut
9.
face fill at building
Max 6" concrete
8'
6' mulch) 12" depth embankment (rock
Special rock mulch) 12" depth embankment (rock
Special rock
Type A1-6 curb
334+11.80 to 334+30.37
TYPICAL SECTION
SIDEWALK #3
334+30.37 to 336+15.19
TYPICAL SECTION
SIDEWALK #3
2% to 4%
Varies pavement Sawcut existing
Building face
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
0'-11' Varies
HMA Type II inch of the sidewalk to avoid drop off.4 1within
Rock mulch (or embankment material) must be elevation.
extending rock mulch towards parking lot
The intent is to minimize asphalt work by
Varies at doorway, see plans.
and existing surface.
depth). Mill area of intersection between proposed meet proposed grade (maintain 2" minimum asphalt in max 3" lifts and at varying depths to difference between proposed and existing. Place asphalt. HMA Type II will vary based on the grade
HMA Type II will be placed on top of the existing
Sawcutting is incidental to sidewalk.
Vary side slope to blend into existing landscape.
See D Series for driveway details.
the rocks.
into existing parking area. There will be soil under curb has a minimum exposed face of 6" when tied
Vary rock mulch slope 4.5% to 27.2% such that
1' behind back of curb.
For BK1 vary the slope to tie into existing ground cut height.
B, reduce the B and F dimensions to the actual
Round all earth slopes. For cut heights less than
See cross sections for cross slopes and side slope.
Revised: January 5, 2018 callout of Project Table, and HMA
Updated Note 4, Length
AMENDMENT 002:
STATE PROJECT
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA
DIST COUNTY ROUTE
TOTAL PROJECT
POST MILES
03 89PLA 5.9/8.5
OPTION X
CA FLAP SR 89(2)
d e n p w p p w ic s w o r k in g A
T y p S
R
A T P .d g n
A
M
W A T E R
W A T E R
W A T E R F
A U
C E T
W A T E R F
A U
C E T
P R
C
.9
STATE PROJECT
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA
DIST COUNTY ROUTE
TOTAL PROJECT
POST MILES
03 89PLA 5.9/8.5
OPTION X
CA FLAP SR 89(2)
d e n p w p p w ic s w o r k in g D
L A
Y S
R
A T P .d g n
A
M
40'20'0
Scale in Feet
R
Proposed curb, A1-6
SIDEWALK #3 PLAN
E 7087709.01
N 2192710.96
Option X
Begin Sidewalk #3
CA FLAP SR 89(2)
333+97.13
D2
5' R
8' pavement markings
See V Series for
R
Sidewalk is parallel to building face.1.
NOTE:
1.
(Rock Mulch), typ.
Embankment
Special Rock
(Rock Mulch), typ.
Embankment
Special Rock driveway existing
Match
E 7087744.14
N 2192697.96
PC at flowline
E 7087772.67
N 2192682.40
Flowline sawcut
E 7087762.15
N 2192670.03
PC at flowline
E 7087740.48
N 2192676.33
PC at flowline
10'R
E 7087772.26
N 2192672.80 adjacent to building
Begin curb and gutter
E 7087898.76
N 2192823.60
Match Existing.
End sidewalk.
End curb and gutter.
R existing at flowline
Sawcut and match
Match existing doorway
(Swigards)
Existing building
Sawcut
R
E 7087891.96
N 2192797.43
Flowcut
Sawcut
Project) protect in place
Truckee River Bridge
Existing inlet (built with existing at flowline
Sawcut and match
Mulch), typ.
Embankment (Rock
Special Rock
E 7087898.76
N 2192823.60
Option X
End Sidewalk #3
CA FLAP SR 89(2)
336+15.19
Revised: January 5, 2018 coordinate
Updated SW#3 Easting
AMENDMENT 002:
6230 6230
STATE PROJECT
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA
DIST COUNTY ROUTE
TOTAL PROJECT
POST MILES
03 89PLA 5.9/8.5
OPTION X
CA FLAP SR 89(2)
d e n p w p p w ic s w o r k in g D
L A
Y S
R
A T P .d g n
A
M
.7
(Rock Mulch), typ.
Special Rock Embankment
.3
SR28
Sidewalk, typ.
drainage, typ.
Proposed
D W
D W
A8
A6
A9 A3
A5
A4
A2
A13
A14
A15
A59
.1
A18
A16
A20
A24
.1
A25
A23
A22
A58 A57 A56
D3
GRADING AND POINT LAYOUT
SIDEWALK #1
40'20'0
Scale in Feet t o
V a r ie s
D2
R to meet existing
Extend curb
A71
A61
D1
D3
(Rock Mulch), typ.
Embankment
Special Rock BK1 A62
.1
A60
A11
A19
A17
A21
A1 A7edge of pavement existing at
Sawcut and match
A10
A18
A19
A17
A20
A72
A72
A73
A21
A23
A24
A73
A22
8'-2"
12'11'
7'-2"
DW #2
A12
A70
A12
A11
A13
A14
A71A70
A9
A8
A10
A7
.4
.7
8'6'
2'-2" 4'-2"
.2
D3
A1
A3
A4 D2
5'10'
6.75%
DW #1
Sheet 1 of 2
A2
0.12%
.1
D1
V a r ie s8 ramps
Typical dimensions and slopes for driveway
Varies
Varies
Varies
Varies
.9
1.50% 7.00%
.5
7.00% 7.50%
7.50%
7.50% 6.50%
7.50% 7.10%
6.40%
.5
NOTES:
3.
2.
1.
Grading of sidewalk/curb/driveways will be included in equipment cost.
minimum 2" depth).
max 3" lifts and at varying depths to meet proposed grade (maintain intersection between proposed and existing surface. Place asphalt in
HMA Type II will be placed on top of the existing asphalt. Mill area of ramp dimensions.
See X and Y dimension on Ramp Dimension Table on Special 609-A for grade break at tie in shall be 6% or less, unless approved by the CO.
necessary. Maximum grade of driveway tie in shall be 10%. Maximum
See Driveway Special 609-A. Field fit driveway adjustments as
HMA Type II
HMA Type II
Revised: January 5, 2018
Added to Note 2
Added HMA Type II callout.
AMENDMENT 002: 2
6232 6232 6232
6232 6233
STATE PROJECT
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA
DIST COUNTY ROUTE
TOTAL PROJECT
POST MILES
03 89PLA 5.9/8.5
OPTION X
CA FLAP SR 89(2)
d e n p w p p w ic s w o r k in g D
L A
Y S
R
A T P a .d g n
A
M
.1
SR28
.1
Sidewalk, typ. D W
D W
.8
A42
A43
A37
A38
A36
A49
A26
D4
GRADING AND POINT LAYOUT
SIDEWALK #1
of pavement existing at edge
Sawcut and match
.5
V a r ie s t o
V a r ie s
40'20'0
Scale in Feet
(Rock Mulch), typ.
Special Rock Embankment
.1
A30A30
A28
A27 A29
A31
A40
A39
(Rock Mulch), typ.
Embankment
Special Rock
A51
A52 A53
A54
A55
A32
A33
A35
A34
A50 existing
Match existing
Match
A41
A48
A76
A38 A40
A37
A39
A76
1' 2"
A75
A74
A28
A27
A29
A74
A30
1' 2" 1' 2"
5'5'5'
A32
A31
A34
A33 A75
DW #4DW #3
Sheet 2 of 2
V a r ie s8 ramps
Typical dimensions and slopes for driveway
Varies
Varies
Varies
Varies
.5
7.50%
7.50%
.9
.9
7.50%
7.50% 7.50%
.4
7.50%
NOTES:
3.
2.
1.
Grading of sidewalk/curb/driveways will be included in equipment cost.
minimum 2" depth).
max 3" lifts and at varying depths to meet proposed grade (maintain intersection between proposed and existing surface. Place asphalt in
HMA Type II will be placed on top of the existing asphalt. Mill area of ramp dimensions.
See X and Y dimension on Ramp Dimension Table on Special 609-A for grade break at tie in shall be 6% or less, unless approved by the CO.
necessary. Maximum grade of driveway tie in shall be 10%. Maximum
See Driveway Special 609-A. Field fit driveway adjustments as
HMA Type II
Added to Note 2
Added HMA Type II callout.
AMENDMENT 002: 2
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA
DIST COUNTY ROUTE
TOTAL PROJECT
POST MILES
03 89PLA 5.9/8.5
OPTION X
CA FLAP SR 89(2)
d e n p w p p w ic s w o r k in g D
L A
Y S
R
A T P .d g n
A
M
40'20'0
Scale in Feet
C5
C2
C1
C4
C9
C3
C6
C7
C8
C36
C35
C11
C15
C13
C37
C38
C10
C12
C14
C19
C17
C53
C52 C57
C51
C34
D5
GRADING AND POINT LAYOUT
SIDEWALK #3
C39
Match existing
C47
C18
C16 doorway location
Match existing at
(Swigards)
Existing building ramps
Typical dimensions and slopes for driveway
C1
C2 C3
C4
C12
C15
C14
C18
C19
C16
C13
.3
.5
.5
.5
7.5%
7.5%
.5
6.38%
7.50% 7.00%
0.06%
0.31%
C44
C22
C23
C24
C28
C25
C55
C54
C45
C46
C50
C56
C27
C48
C49
C26
C48 C47
C45
C46
C49
C50
1.50%
1.50%
.0
.4
1.50%
.0
.4
SW #1
6.2'
5' 8'
16'
C17 8'
.6
SDW #2 SW #3
C41
C43
C42
C40
.6
C30
C31
C31b
C31a C32
C32b
C33
7.50%
2" depth).
to meet proposed grade (maintain minimum asphalt in max 3" lifts and at varying depths between proposed and existing surface. Place existing asphalt. Mill area of intersection
HMA Type II will be placed on top of the included in equipment cost.
Grading of sidewalk/curb/driveways will be
2.
1.
NOTES:
HMA Type II
Revised: January 5, 2018 callout.
Added HMA Type II
AMENDMENT 002:
01/05/18
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| Amendment AA01 NV FTNP LAKE 114(1) Plan Sheets.pdf |
| A01_TTL w-DDR-006.pdf |
| A05_TYP_01-001.pdf |
| A06_TYP_02-002.pdf |
| A07_TYP_03-003.pdf |
| A08_TYP_04-004.pdf |
| A09_TYP_05-005.pdf |
| _Combined_OptionX_Amendment002.pdf |
| A2_AM2 |
| A6_AM2 |
| A7_AM2 |
| D2_AM2 |
| D3_AM2 |
| D4_AM2 |
| D5_AM2 |
| G1_AM2 |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 29 |
| Text3: |
| 0: A002 |
| 1: 1/9/2018 |
| 2: |
| 0: |
| 1: CA FLAP SR89(2) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: RYAN PHILLIPS
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH6817B00002 |
| 1: 1/2/2018 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: PLANS |
Remove and replace Option X plan sheets A2, A6, A7, D2, D3, D4, D5 and G1 with the attached corresponding Option X plan sheets.
PERMITS
Remove and replace Appendix D TRPA Permits with the attached TRPA Permits.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it.