C2 Ops Workstation Consoles
Closed Solicitation Posted
- Solicitation number
- FA445222Q0012
- Agency
- Air Mobility Command Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 337214 Office Furniture (except Wood) Manufacturing
- PSC
- 7195 Miscellaneous Furniture And Fixtures
- Place of performance
- Pope Army Airfield, North Carolina 28308, United States
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
The entire description of the requirement is provided in the attached SOW. As a synopsis there are three main requirements: remove/dispose of existing Command Post Consoles; remove existing floor carpet squares and replace/install with new; and provide and install new Command Post Consoles. Period of performance will be 90-days after receipt of award.
Amendment 01 issued 7/28/2022.
Q&A revised 8/3/2022 and Pictures document issued 8/3/2022.
Q&A revised 8/10/2022.
Update #3 ·
The entire description of the requirement is provided in the attached SOW. As a synopsis there are three main requirements: remove/dispose of existing Command Post Consoles; remove existing floor carpet squares and replace/install with new; and provide and install new Command Post Consoles. Period of performance will be 90-days after receipt of award.
Amendment 01 issued 7/28/2022.
Q&A revised 8/3/2022 and Pictures document issued 8/3/2022.
Update #2 ·
The entire description of the requirement is provided in the attached SOW. As a synopsis there are three main requirements: remove/dispose of existing Command Post Consoles; remove existing floor carpet squares and replace/install with new; and provide and install new Command Post Consoles. Period of performance will be 90-days after receipt of award.
Amendment 01 issued 7/28/2022.
Update #1 ·
The entire description of the requirement is provided in the attached SOW. As a synopsis there are three main requirements: remove/dispose of existing Command Post Consoles; remove existing floor carpet squares and replace/install with new; and provide and install new Command Post Consoles. Period of performance will be 90-days after receipt of award.
Attachments
| File | Type | Posted |
|---|---|---|
| FA445222Q0012 - QnR (rev 8-10-2022).pdf | ||
| FA445222Q0012 - QnR (rev 8-3-2022).pdf | ||
| Pictures.pdf | ||
| Amendment 01.pdf | ||
| FA445222Q0012 - QnR.pdf | ||
| Atch 1 - Statement of Work- C2 Ops Consoles Requirement (rev 7-27-22).pdf | ||
| SOW Attachment 1 - Floor Plan-Command Post.pptx | PPTX presentation | |
| Combined Synopsis Solicitation - C2 Ops Consoles.pdf | ||
| Atch 1 - Statement of Work- C2 Ops Consoles Requirement (7JUL22).pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity