Building 114 Renovation
Awarded Award Notice Posted
- Solicitation number
- W9136419R8000
- Agency
- Ohio National Guard Army National Guard, Department of Defense
- Awarded
- to B.c. & G. Weithman Construction Company
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- W9136419C8001 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- 180th Fighter Wing, 2660 South Eber Road Swanton, Ohio 43558, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Awarded Vendors: B. C. & G. Weithman Construction Company. Contract Award Dollar Amount: $131,331.00. Contract Award Date: 2018-11-16.
Update #4 ·
RFI#2
Q1. On page 3 section 1.2 Scope of work: It indicates that we are to install 50 um duplex LC multimode fiber- Are we to install (1) duplex fiber cable per face plate or one total?
A1. One two-strand cable per faceplate.
Q2. What room is the data closet in?
A2. Room 164A
Q3. Is there a specific manufacture and features we are to take into account for the 60" LED display and projector?
A3. No specific manufacturer. Just basic features and resolution high enough to adequately display slides and typewritten to be viewed at a distance.
Q4. For the projector, I will need to know the height the ceiling and the size of the existing projection screen
A4. Ceiling height is 9'4". Projection will now be onto finished wall. No need to match existing screen.
.
Update #3 ·
WYTD182011: Renovate Wing HQ - Phase 2
Please make the following changes to the SOW:
1. Remove Conference Room Floor Plan in para. 1.03.A.b.i and replace with Conference Room
Floor Plan with rev1 25 Oct 18. Drawing is attached. Adds dust barrier at breakroom.
2. Change ALL new doors in the statement of work from 20 gauge steel to 18 gauge steel doors.
3. Change para. 1.03.C.f to read Provide a new door between room 103 and room 104.
.
Update #2 ·
RFI#1 Question: Paragraph 36 states that "key members may not hold more than one key role."
Given the dollar estimate for this project, having a separate Quality control Manager and Safety Manager will add significant cost to the project. If a superintendent has completed the Army Corp Construction Quality Management for Contractors course, can the superintendent cover all three roles?
RFI#1 Response: All three positions (site superintendent, QA, Safety) may be combined into one position.
.
Update #1 ·
Description of Proposed Construction: Demolition of w alls, ceilings, flooring, HV AC, electrical, fire protection and communications systems.
Construct new walls, ceilings, flooring, HV AC, electrical, fire protection and communications systems.
Air Conditioning requirement: 16,500 SF ADEQUATE: 14,830 SF SUBSTANDARD: 1,670 SF PROJECT: Renovate Wing HQ (Current Mission).
REQUIREMENT: The I 80th Fighter Wing requires properly sited, sized, and configured space to conduct Wing Staff functions and training.
CURRENT SITUATION: The Wing Command & Commander Staff Sections are not properly configured or consolidated for several operations
and training support agencies. The f acility does not have a properly sized w ing command conference and multi-purpose room. The Inspector
General inspection and complaints resolution office as w ell as the Military Equal Opportunity sections lack suff icient dedicated and separated
space to conduct inspections, investigations and private counseling as required by AFI.
Magnitude of project is $100,000 to $250,000
NAICS Code - 236220 - $36.5Mil
Set-Aside IAW FAR 19.502-2(a) Total Small Business
Site survey - 25 October 2018 at 1000 EST, Location 2660 South Eber Road, Sw anton Ohio, 43558, Building 150/CES
.