Building 114 Renovation

Awarded Award Notice Posted

Solicitation number
W9136419R8000
Agency
Ohio National Guard Army National Guard, Department of Defense
Awarded
to B.c. & G. Weithman Construction Company
Set-aside
Total Small Business

Opportunity facts

Contract number
W9136419C8001 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
180th Fighter Wing, 2660 South Eber Road Swanton, Ohio 43558, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Awarded Vendors: B. C. & G. Weithman Construction Company. Contract Award Dollar Amount: $131,331.00. Contract Award Date: 2018-11-16.

Update #4 ·

RFI#2
Q1. On page 3 section 1.2 Scope of work: It indicates that we are to install 50 um duplex LC multimode fiber- Are we to install (1) duplex fiber cable per face plate or one total?
A1. One two-strand cable per faceplate.

Q2. What room is the data closet in?
A2. Room 164A


Q3. Is there a specific manufacture and features we are to take into account for the 60" LED display and projector?
A3. No specific manufacturer. Just basic features and resolution high enough to adequately display slides and typewritten to be viewed at a distance.


Q4. For the projector, I will need to know the height the ceiling and the size of the existing projection screen
A4. Ceiling height is 9'4". Projection will now be onto finished wall. No need to match existing screen.

.

Update #3 ·

WYTD182011: Renovate Wing HQ - Phase 2


Please make the following changes to the SOW:


1. Remove Conference Room Floor Plan in para. 1.03.A.b.i and replace with Conference Room


Floor Plan with rev1 25 Oct 18. Drawing is attached. Adds dust barrier at breakroom.


2. Change ALL new doors in the statement of work from 20 gauge steel to 18 gauge steel doors.


3. Change para. 1.03.C.f to read Provide a new door between room 103 and room 104.

.

Update #2 ·

RFI#1 Question: Paragraph 36 states that "key members may not hold more than one key role."
Given the dollar estimate for this project, having a separate Quality control Manager and Safety Manager will add significant cost to the project. If a superintendent has completed the Army Corp Construction Quality Management for Contractors course, can the superintendent cover all three roles?
RFI#1 Response: All three positions (site superintendent, QA, Safety) may be combined into one position.

.

Update #1 ·

Description of Proposed Construction: Demolition of w alls, ceilings, flooring, HV AC, electrical, fire protection and communications systems.


Construct new walls, ceilings, flooring, HV AC, electrical, fire protection and communications systems.


Air Conditioning requirement: 16,500 SF ADEQUATE: 14,830 SF SUBSTANDARD: 1,670 SF PROJECT: Renovate Wing HQ (Current Mission).


REQUIREMENT: The I 80th Fighter Wing requires properly sited, sized, and configured space to conduct Wing Staff functions and training.


CURRENT SITUATION: The Wing Command & Commander Staff Sections are not properly configured or consolidated for several operations


and training support agencies. The f acility does not have a properly sized w ing command conference and multi-purpose room. The Inspector


General inspection and complaints resolution office as w ell as the Military Equal Opportunity sections lack suff icient dedicated and separated


space to conduct inspections, investigations and private counseling as required by AFI.


Magnitude of project is $100,000 to $250,000


NAICS Code - 236220 - $36.5Mil


Set-Aside IAW FAR 19.502-2(a) Total Small Business


Site survey - 25 October 2018 at 1000 EST, Location 2660 South Eber Road, Sw anton Ohio, 43558, Building 150/CES

.