Drawing_F_-_M-1_HVAC_Ductwork_Plan.pdf
PDF 6 MB Posted
- Attached to
- Building 114 Renovation Federal contract opportunity
- Solicitation number
- W9136419R8000
About this file
M1 HVAC ductwork plan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Ammendment_1_bldg_114.pdf | ||
| Comm_wiring_and_devices_PWS.pdf | ||
| Site_Survey_attendance_roster_25_Oct_18.pdf | ||
| W9136419R8000_B114_RENO_SOLICITIATION.pdf | ||
| Drawing_H_-_Plans_173_175_129.pdf | ||
| Drawing_D_-_E-3_Lighting_Plan_-_114.pdf | ||
| Drawing_E_-_Electrical_comm_floor_plan.pdf | ||
| Drawing_A_-_conf_room_basic.pdf | ||
| Drawing_C_-_bldg-114-Reflected_CeilingPlan_10-18-18.pdf | ||
| Attachment_3_-_SOW_Renovate_Wing_HQ_SARC_MEO.pdf | ||
| Drawing_B_-_conference_room_floor_plan.pdf | ||
| Drawing_G_-_transfer_duct_detail.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1075445152E Polygon
1075445152E Callout Relocate existing VAV box and extend ductwork to the east to provide a minimum of 3' clearance from new wall to service VAV.
1075445152E Text Box HVAC notes for rooms 103 & 104:
1. Provide 30"x10" transfer duct at new wall above ceiling between rooms 103 and 104. Coordinate location with relocated ductwork. See transfer duct detail.
2. Provide a 50" x 10" transfer duct at new wall above ceiling between rooms 103 & 104. See transfer duct detail.
3, Remove existing supply and return grilles and reinstall in the new suspended ceilings. Provide new insulated flexible duct to connect relocated diffusers in new ceilings.