Comm_wiring_and_devices_PWS.pdf

PDF 189 KB Posted

Attached to
Building 114 Renovation Federal contract opportunity
Solicitation number
W9136419R8000
Issued by
Department of the Army Ohio Army National Guard

About this file

PWS for communication wiring and devices

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

For the

Building 114 Communications – Phase II

At

180th Fighter Wing

Toledo AIR NATIONAL GUARD BASE

Program Office:

180TH Communications Flight, Plans and Resources Office

18 October 2018

PWS for B114 Comm Install Page 1 of 6

Document Revision History

Mod.

No. Description of Changes Requested By Approved

By Date

None Initial version John Cessna John Cessna

October

PWS for B114 Comm Install Page 2 of 6

Table of Contents

1.0 General

2.0 Installation Requirements

3.0 Standards of Conduct/Security Requirements

4.0 Government Furnished Property (GFP) and Services

PWS for B114 Comm Install Page 3 of 6

Performance Work Statement (PWS)

For the

B114 Comm Installation = Phase II

1.0. General

1.1. Introduction

The mission of the 180th Fighter Wing is to Provide for America; protection of the homeland, effective combat power and defense support to civil authorities… The mission of the 180th Communications Flight, Plans and Resources Office is to Provide planning and implementation of cyberspace/communications system requirements and cyberspace/communications programs.

The ultimate goal of the Contractor shall be to install communications cabling and audio / video equipment that will meet the needs of the 180th Fighter Wing. The Contractor shall provide all supervision, personnel, equipment, tools, materials, vehicles, and other items and services necessary to perform all tasks and functions defined in the PWS. The Contractor shall manage the quality of the services delivered using their internal management structure. The Contractor shall interface with other Contractors, and other 180th Fighter Wing personnel as required.

1.2. Scope of Work

The Contractor shall provide the supervision, personnel, equipment, tools, materials, vehicles, and other items necessary to provide installation services for a total of six data drops, consisting of three - Cat6 cables and one - 50um duplex LC multimode fiber optical cable in a single faceplate and will match existing installations within the building. Additionally, the contractor will provide and install two wall-mounted 60” LED displays and one ceiling-mounted high resolution projector capable of displaying an image to match existing projection screen, with appropriate video and audio cabling to connect to a government provided computer workstation.

2.0. Installation Requirements

Following manufacturer’s guidelines and industry standards, which includes, but not limited to, the National Electric Code (NEC), National Fire Protection Agency (NFPA) 70, Telecommunications Industry Association (TIA) 568, and the ANGETL 15-01- 05, the Contractor shall install communications cabling and faceplates, located at the 180th Fighter Wing, Toledo Air National Guard Base, in Building 114. Two drops each will be installed in Rooms 104, 173, and 175. Additionally, the contractor will install

PWS for B114 Comm Install Page 4 of 6 two – 60” displays and one – hi resolution projector with appropriate video cabling in Room 104. All three will be capable of being controlled from said workstation as well as have the provision for connecting another “guest” laptop. Control capability should be simple to operate and will be located in a console in the northeast corner of the room. Cabling will be hidden and extend from the console to the various displays. Audio capability needs to be included at the console as well. All locations will be field verified with the government representative. The contractor will also relocate the ceiling-mounted wireless access points from room 103 to the center of room 104.

2.1. Pre-Installation Survey

The Contractor shall perform a full and comprehensive visual, technical, and operational site survey to assess requirements and to provide the best installation solution for this Performance Work Statement.

2.2. Installation

The contractor shall provide all management, tools, supplies, equipment, and labor necessary to install communications cabling and faceplates and video/projection displays. The installation shall comply with all applicable guidance and industry standards.

2.3. Post Installation Inspection

The Contractor shall provide test results for all installed cabling.

2.4. Period of Performance

Performance period for this contract will be no more than 30 days from the date of award, and will run continuously for 6 months with the provision for a one time extension of this contract for an additional 6 month period.

2.5. Hours of Operation/Place of Performance

Contractor Personnel will have access to the installation Monday through Friday from 0700-1730, except Federal holidays or when the installation is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor must at all times maintain an adequate work force for the uninterrupted performance of all

PWS for B114 Comm Install Page 5 of 6 tasks defined within this performance work statement. Work will be performed at the 180th Fighter Wing/Toledo Air National Guard Base, 2660 South Eber Road, Swanton, OH 43558.

2.6. Records

The contractor shall be responsible for creating an as-built drawing of the installation. It should clearly depict system function.

2.7. Safety

The Contractor shall develop a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel. Appropriate Personal Protective Equipment (PPE) is required while performing work on the installation.

2.8. Special Qualifications

Contractor shall possess appropriate certification or licensure to perform the work.

3.0. Standards of Conduct/Security Requirements

Contractor Personnel shall adhere to standards of conduct and current installation security policies as established by the Installation Commander. Removing objects from refuse for personal use is unauthorized. Contractor Personnel may request items through unit designee. Violations are grounds for termination.

4.0. Government Furnished Property (GFP) and Services

The US Government will provide a reasonable amount of electrical power and utilities to the contractor for the execution of this contract. If an emergency arise, only the necessary basic lifesaving and life support measures will be provided during an emergency.

1.0. General
1.1. Introduction
1.2. Scope of Work
2.1. Pre-Installation Survey
2.4. Period of Performance
2.5. Hours of Operation/Place of Performance
The Contractor shall develop a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel. Appropriate Personal Protective Equipment (PPE) is required while performing work on t...
3.0. Standards of Conduct/Security Requirements
Contractor Personnel shall adhere to standards of conduct and current installation security policies as established by the Installation Commander. Removing objects from refuse for personal use is unauthorized. Contractor Personnel may request items...

File details come from the government source that posted it.