Drawing_H_-_Plans_173_175_129.pdf
PDF 468 KB Posted
- Attached to
- Building 114 Renovation Federal contract opportunity
- Solicitation number
- W9136419R8000
About this file
Plans 173 175 129
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Ammendment_1_bldg_114.pdf | ||
| Site_Survey_attendance_roster_25_Oct_18.pdf | ||
| Comm_wiring_and_devices_PWS.pdf | ||
| W9136419R8000_B114_RENO_SOLICITIATION.pdf | ||
| Attachment_3_-_SOW_Renovate_Wing_HQ_SARC_MEO.pdf | ||
| Drawing_B_-_conference_room_floor_plan.pdf | ||
| Drawing_G_-_transfer_duct_detail.pdf | ||
| Drawing_D_-_E-3_Lighting_Plan_-_114.pdf | ||
| Drawing_F_-_M-1_HVAC_Ductwork_Plan.pdf | ||
| Drawing_E_-_Electrical_comm_floor_plan.pdf | ||
| Drawing_A_-_conf_room_basic.pdf | ||
| Drawing_C_-_bldg-114-Reflected_CeilingPlan_10-18-18.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Remove double door and replace with a single door, frame and hardware.
New wall
New door, frame and hardware.
OBI #1 New door, frame and hardware.
New wall.
Remove flooring and replace with new carpeting.
Provide wall to fill the area of the door that was removed
Remove flooring and replace with new carpeting.
Remove flooring and replace with new carpeting.
Provide new lock set for door.
173b
129b
173a
129a
Remove door.
Leave frame.
OBI #2
Floor Plan Remove ceiling tiles and replace with new tiles.
Remove ceiling tiles and replace with new tiles.
OBI #1.
173b
129b
173a
129a
OBI #2
EX S
Notes Rearrange/rewire lighting circuits as needed.
Demo existing lighting and provide 3 new lights each for Rooms 173 and 175.
Room 175: Move existing switch closer to the new single door.
Room 173: Provide blank plate to cover switch next to Door 173a
OBI #1
Add new 3 pole switch next to new door.
OBI #2
Provide new ceilings in Rooms 129, 129a, and 129b.
Room 129: Demo existing light, and provide 2 new lights. Replace 3 pole switch with single pole switch. 2 lights on single pole switch.
Room 129a: Remove existing 3 pole switch, and rewire lights to be controlled by single pole switch in Room 127.
Room 129b: Install single pole switch to control 2 lights and move the existing lights.
NS3
EX S3
EX S3
NS
EX S3
127EX S
EX S3
Lighting Plan
Legend
*Proposed light locations with “N” denotes that subject light is new. All others will be reused.
Proposed Lighting Locations*
Existing Lighting
EX S
EX S3
Existing Single Pole Switch
Existing 3-Pole Switch
NS
NS3
New Single Pole Switch New 3-Pole Switch
N
N
NNN
N N N
N
N
N
N
N
Provide new receptacles (8 total) where shown. New outlets shall be on a new circuit. Provide new circuit breaker if needed.
Circuits will be ran to Panel C. N New receptacle
Legend
Subject rooms
OBI #2
Power Plan
New walls
Replace existing return with 24 x 12
Provide new branch ductwork, VAV box, thermostat and controls for Rooms 173 & 175
Replace existing diffusers with appropriately sized diffusers. 250 CFM each.
Adjust VAV box to eliminate flow to 173 and 175
Thermostat Placement
Utilities Plan
250 CFM
250 CFM