BIL Funded - Eugene Airport (EUG) ATCT Elevator Modernization
Closed Solicitation Posted
- Solicitation number
- 1EUG
- Agency
-
Southwestern Region
Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238290 Other Building Equipment Contractors
- Place of performance
- Eugene, Oregon 97402, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals to modernize the elevator that services the Airport Traffic Control Tower at Eugene Airport in Eugene, Oregon. The Federal Aviation Administration Southwestern Region aims to replace aging components and bring the 1986 installed elevator up to the latest ASME A17.1 safety code standards through this procurement. Proposals will be evaluated based on technical approach and price, with award being made within 45 days to the responsible offeror presenting the best value. Proposals are due by March 10, 2024.
This is a total small business set-aside designated under NAICS 238990 (All Other Specialty Trade Contractors) and PSC S206 (Elevator Maintenance and Repair). The single elevator serves as the primary means of vertical transportation within the five-story traffic control tower building. The modernization is expected to cost between $300,000 and $500,000, and the place of performance will be at Eugene Airport in Eugene, Oregon. Offerors must demonstrate experience modernizing elevators and meeting codes through past performance evaluations.
Notice text
The elevator that serves the Airport Traffic Control Tower (ATCT) at the Eugene (EUG) Airport (Eugene, OR) was installed in 1986. The elevator is an electric basement geared traction elevator has a 2500-pound car weight rating with a speed 150 Feet Per Minute (FPM) that serves 5 floors and stops. The elevator is the primary means of vertical transportation for the building and is the only elevator that serves the ATCT.
This elevator is in operational condition. This project will replace aging components including but not limited to INSERT FROM REPORT. The project will also bring the elevator up to the most recent version of the ASME A17.1 elevator code.
Files
| File | Type | Posted |
|---|---|---|
| 697DCK-24-R-00173-FE-2.pdf | ||
| Attachment J2 - Davis Bacon Wage Rates.pdf | ||
| Attachment J5 - Past Performance Questionnaire.doc | DOC document | |
| Attachment J6 - Uniform Bipartisan Infrastructure Law Data Report.xlsx | XLSX spreadsheet | |
| 697DCK-24-R-00173-FE.pdf | ||
| Attachment J4 - Standardized Proposal Breakdown.xls | XLS spreadsheet | |
| Attachment J1 - EUG ATCT Elevator PWS.pdf | ||
| Attachment J3 - SCA Wage Rates.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity