Attachment J4 - Standardized Proposal Breakdown.xls

XLS spreadsheet 45 KB Posted

Attached to
BIL Funded - Eugene Airport (EUG) ATCT Elevator Modernization
Solicitation number
1EUG
Issued by

About this file

This document contains a standardized proposal breakdown template for modernizing an elevator that serves the Airport Traffic Control Tower at Eugene Airport in Eugene, Oregon. The template requires itemizing the costs for modernization requirements such as electronics/controls/software, electrical, mechanical/drives/sheaves/traveling cable, and safety equipment. It also requires itemizing the costs for construction/installation such as mobilization/demobilization, removal/demolition, installation, and permits. Additional line items include after hours variance costs, maintenance fees, and overhead and profit. Instructions specify only entering costs in the white cells as the pink cells contain embedded formulas. A narrative description of the modernization effort must also be included with the technical proposal.

The related federal contract opportunity is a solicitation to fund the elevator modernization project at Eugene Airport using funds from the Budget Line Item program. The elevator was installed in 1986 and requires replacement of aging components to bring it up to the most recent ASME A17.1 elevator safety code. The Department of Transportation Federal Aviation Administration Southwestern Region is the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modernization

Standardized Proposal BreakdownDATE PREPARED: MMM DD - YYYY
PROJECT:
VENDOR:
PREPARER:PREPARER'S CONTACT INFORMATION:
ITEMEQUIPMENT COSTS - $LABOR COSTS - $OTHER COSTS - $TOTAL ITEM COST - $
TOTALTOTALTOTAL
Modernization Requirements:
Electronics/Controls/Softwarethiat$ - 0$ - 0
Electrical$ - 0$ - 0$ - 0
Mechanical/Drives/Sheaves/Traveling Cable$ - 0$ - 0$ - 0
Safety Equipment$ - 0$ - 0$ - 0
Cab Interior/Finishes$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0
Construction/Install:
Mobilization/Demobilization$ - 0$ - 0$ - 0$ - 0
Removal/Demolition$ - 0$ - 0$ - 0$ - 0
Installation$ - 0$ - 0$ - 0$ - 0
Permits$ - 0$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0
After Hours Variance:
Modernization/Construction$ - 0$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0
Profit$ - 0$ - 0
Overhead$ - 0$ - 0
MODERNIZATION TOTAL$ - 0
Performance Maintenance:
Maintenance Fee (monthly)$ - 0$ - 0$ - 0$ - 0
Maintenance Monitoring (as required)$ - 0$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0
Profit$ - 0$ - 0
Overhead$ - 0$ - 0
MAINTENANCE TOTAL (Annual) Base Year$ - 0
Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown.

File details come from the government source that posted it. Updated .