Berth 6 Maintenance Dredging - PNSY
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N40085-20-B-2546
- Agency
- Naval Facilities Engineering Command Department of the Navy, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Kittery ME 03904 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks dredging services for maintenance dredging of Berth 6 at the Portsmouth Naval Shipyard in Kittery, Maine. The Naval Facilities Engineering Command on behalf of the Department of the Navy requires dredging Berth 6, which includes removal of any rock or hard material by mechanical means. There are also two optional scopes of work to dredge high spots at Berths 14 and 12, with the former also requiring rock removal. Bids were due by August 21, 2020 and the period of performance for the base bid is 120 days from award.
The solicitation is set aside for total small business and has a place of performance in Kittery, ME. The projected award value is between $8-10 million based on the government estimate. The base bid quantity is estimated at 7,183 cubic yards for Berth 6 dredging. NAICS code 237990 with PSC code D314 applies. One bid was received and the anticipated award date is August 31, 2020. Coastline Consulting of Branford, CT submitted the sole bid of $8,051,356.39 to complete all aspects of the project.
Notice text
4 versions
Update #4 · Latest ·
BID SYNOPSIS - RESULTS POST
See Attch 1419 Berth 6 Mx Dredging - Bid Results_BB
---------------------------------------------------------------------------------------------------------------------
AMENDMENT 2 - POST SOLICITATION DOCUMENTS:
1. Attch 1_Bid Form Rev1 dated 8-3-2020
2. PPIs #2 w ith NAVFAC response dated 11 Aug 20.
See Attached: N4008520B2546 0002
---------------------------------------------------------------------------------------------------------------------
AMENDMENT 1 - POST SOLICITATION DOCUMENTS:
1. SoW Rev 1 dated 6-15-2020; Attch 1_Bid Form Rev1; Attch 3_Dredging Specs Rev1; Attch 4_Submittal Register Rev1; Attch 5_Draw ings Rev1
2. Attch 9_Lobster Mitigation Plan
3. PPIs w ith NAVFAC response dated 4 Aug 20.
4. Site Visit Sign-in Sheet
See Attached: N4008520B2546 0001
---------------------------------------------------------------------------------------------------------------------
Project Description:
Berth 6 Maintenance Dredging – PNSY: The work includes all supervision, labor, material, equipment, transportation, and incidental related work required to dredge the following area(s) around Portsmouth Naval Shipyard (PNSY) located in Kittery ME.
The project consists of a base bid and two (2) bid options.
Base - Dredging of Berth 6. Rock or hard material removal is required.
Option 1 - Dredging a high spot at Berth 14. Rock or hard material removal is required.
Option 2 - Dredging a high spot at Berth 12. Rock or hard material removal is NOT required.
*NOTE: Removal of hard material must be accomplished by mechanical means, no blasting is allowed.
Update #3 ·
AMENDMENT 2 - POST SOLICITATION DOCUMENTS:
1. Attch 1_Bid Form Rev1 dated 8-3-2020
2. PPIs #2 w ith NAVFAC response dated 11 Aug 20.
See Attached: N4008520B2546 0002
---------------------------------------------------------------------------------------------------------------------
AMENDMENT 1 - POST SOLICITATION DOCUMENTS:
1. SoW Rev 1 dated 6-15-2020; Attch 1_Bid Form Rev1; Attch 3_Dredging Specs Rev1; Attch 4_Submittal Register Rev1; Attch 5_Draw ings Rev1
2. Attch 9_Lobster Mitigation Plan
3. PPIs w ith NAVFAC response dated 4 Aug 20.
4. Site Visit Sign-in Sheet
See Attached: N4008520B2546 0001
---------------------------------------------------------------------------------------------------------------------
Project Description:
Berth 6 Maintenance Dredging – PNSY: The work includes all supervision, labor, material, equipment, transportation, and incidental related work required to dredge the following area(s) around Portsmouth Naval Shipyard (PNSY) located in Kittery ME.
The project consists of a base bid and two (2) bid options.
Base - Dredging of Berth 6. Rock or hard material removal is required.
Option 1 - Dredging a high spot at Berth 14. Rock or hard material removal is required.
Option 2 - Dredging a high spot at Berth 12. Rock or hard material removal is NOT required.
*NOTE: Removal of hard material must be accomplished by mechanical means, no blasting is allowed.
Update #2 ·
AMENDMENT 1 - POST SOLICITATION DOCUMENTS:
1. SoW Rev 1 dated 6-15-2020; Attch 1_Bid Form Rev1; Attch 3_Dredging Specs Rev1; Attch 4_Submittal Register Rev1; Attch 5_Draw ings Rev1
2. Attch 9_Lobster Mitigation Plan
3. PPIs w ith NAVFAC response dated 4 Aug 20.
4. Site Visit Sign-in Sheet
See Attached: N4008520B2546 0001
---------------------------------------------------------------------------------------------------------------------
Project Description:
Berth 6 Maintenance Dredging – PNSY: The work includes all supervision, labor, material, equipment, transportation, and incidental related work required to dredge the following area(s) around Portsmouth Naval Shipyard (PNSY) located in Kittery ME.
The project consists of a base bid and two (2) bid options.
Base - Dredging of Berth 6. Rock or hard material removal is required.
Option 1 - Dredging a high spot at Berth 14. Rock or hard material removal is required.
Option 2 - Dredging a high spot at Berth 12. Rock or hard material removal is NOT required.
*NOTE: Removal of hard material must be accomplished by mechanical means, no blasting is allowed.
Update #1 ·
Project Description:
Berth 6 Maintenance Dredging – PNSY: The work includes all supervision, labor, material, equipment, transportation, and incidental related work required to dredge the following area(s) around Portsmouth Naval Shipyard (PNSY) located in Kittery ME.
The project consists of a base bid and two (2) bid options.
Base - Dredging of Berth 6. Rock or hard material removal is required.
Option 1 - Dredging a high spot at Berth 14. Rock or hard material removal is required.
Option 2 - Dredging a high spot at Berth 12. Rock or hard material removal is NOT required.
*NOTE: Removal of hard material must be accomplished by mechanical means, no blasting is allowed.
Attachments
Show all 23
Notice history
| Notice | Type | Posted |
|---|---|---|
| Berth 6 Maintenance Dredging - PNSY | Award Notice | |
| Berth 6 Maintenance Dredging - PNSY | Solicitation | |
| Berth 6 Maintenance Dredging - PNSY | Pre-Solicitation | |
| Berth 6 Maintenance Dredging - PNSY | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity