Attch 4_ Submittal Register Berth 6 Mx Dredging_Rev1.xls

XLS spreadsheet 64 KB Posted

Attached to
Berth 6 Maintenance Dredging - PNSY Federal contract opportunity
Solicitation number
N40085-20-B-2546
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains a submittal register for the Berth 6 Maintenance Dredging project at Portsmouth Naval Shipyard in Kittery, Maine. The project involves dredging Berth 6 and two bid options for dredging high spots at Berths 14 and 12, with rock or hard material removal required for Berth 6 and Berth 14 but not Berth 12. The submittal register lists 99 required submittals from the contractor organized by specification section and paragraph number, including an accident prevention plan, construction schedule, quality control plan, environmental management plans, dredging plans, and closeout documents such as as-built records and operation and maintenance manuals. The Navy Facilities Engineering Command is the contracting agency for this project.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Register

TITLE:Berth 6 Maintenance DredgingSUBMITTAL REGISTER
JOB NAME:Berth 6 Maintenance Dredging
LOCATION:PNSY
CONTRACT NO:
CONTRACTOR:
CONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
LineAct-ivity #Trans-mittal #Specification SectionSD #SD DescriptionItem SubmittedParagraph #Classi-fication: GOVT or A/E RevwrSubmitApproval Needed ByMaterial Needed ByAction CodeDate Of ActionDate FWD to APPR / Auth - Date RCD From CONTRDate FWD To Other RevwrDate RCD From Other RevwrAction CodeDate Of ActionMailed To CONTR/ Date RCD From APPR AuthorityRemarks
101 14 00.00 2201Preconstruction SubmittalsList of Contact Personnel1.5.1G
201 20 00.00 2201Preconstruction SubmittalsSchedule of Prices1.3G
301 30 00.00 2201Preconstruction SubmittalsNAVFAC Red Zone Checklist0G
401 30 00.00 2201Preconstruction SubmittalsNAVFAC PWD ME Follow-on Services List1.8G
501 31 23.13 2001Preconstruction SubmittalsList of Contractor's Personnel1.4.2G
601 32 16.00 2001Preconstruction SubmittalsConstruction Schedule1.2G
701 32 16.00 2001Preconstruction SubmittalsConstruction Schedule (3 Week)1.6G
801 32 16.00 2001Preconstruction SubmittalsConstruction Schedule (Outages)1.8G
901 32 16.00 2007CertificatesMonthly Updates1.4G
1001 33 0001Preconstruction SubmittalsSubmittal Register1.5G
1101 33 10.05 2001Preconstruction SubmittalsConsolidated RFP Documents2.1G
1201 33 10.05 2001Preconstruction SubmittalsSubmittal Register1.5.5G
1301 33 10.05 2005Design DataDesign Drawings1.7G
1401 33 10.05 2005Design DataSpecifications1.8G
1501 33 10.05 2005Design DataDesign Analysis1.9G
1601 33 10.05 2005Design DataDesign Submittals2.2G
1701 33 10.05 2011Closeout SubmittalsRecord Documents0G
1801 33 10.05 2011Closeout SubmittalsDD Form 13540G
1901 35 26.00 2201Preconstruction SubmittalsAccident Prevention Plan (APP)1.7G
2001 35 26.00 2206Test ReportsMonthly Exposure Reports1.4G
2101 35 26.00 2206Test ReportsNotifications and Reports1.12G
2201 35 26.00 2206Test ReportsAccident Reports1.12.2G
2301 35 26.00 2206Test ReportsLHE Inspection Reports1.12.3G
2401 35 26.00 2207CertificatesCrane Operators/Riggers1.6.1.5G
2501 35 26.00 2207CertificatesStandard Lift Plan1.7.2.2G
2601 35 26.00 2207CertificatesCritical Lift Plan1.7.2.3G
2701 35 26.00 2207CertificatesNaval Architecture Analysis1.7.2.3G
2801 35 26.00 2207CertificatesActivity Hazard Analysis (AHA)1.8G
2901 35 26.00 2207CertificatesConfined Space Entry Permit1.9.1G
3001 35 26.00 2207CertificatesHot Work Permit1.9.1G
3101 35 26.00 2207CertificatesCertificate of Compliance1.12.4G
3201 35 26.00 2207CertificatesThird Party Certification of Barge-Mounted Mobile Cranes0G
3301 35 26.00 2207CertificatesLicense Certificates1.14G
3401 35 26.00 2207CertificatesRadiography Operation Planning Work Sheet1.14.1G
3501 45 00.10 2201Preconstruction SubmittalsQC Plan1.6G
3601 50 00.00 2201Preconstruction SubmittalsConstruction site plan1.4G
3701 50 00.00 2201Preconstruction SubmittalsTraffic control plan3.3.1G
3801 50 00.00 2206Test ReportsBackflow Preventer Tests2.2.5G
3901 50 00.00 2207CertificatesBackflow Tester1.5.1G
4001 50 00.00 2207CertificatesBackflow Preventers1.5G
4101 57 19.00 2201Preconstruction SubmittalsPreconstruction Survey1.5.1G
4201 57 19.00 2201Preconstruction SubmittalsSolid Waste Management Plan3.4G
4301 57 19.00 2201Preconstruction SubmittalsRegulatory Notifications1.5.2G
4401 57 19.00 2201Preconstruction SubmittalsEnvironmental Management Plan (EMP)3.1G
4501 57 19.00 2201Preconstruction SubmittalsDirt and Dust Control Plan3.14.1G
4601 57 19.00 2201Preconstruction SubmittalsContractor Hazardous Material Inventory Log3.6G
4701 57 19.00 2201Preconstruction SubmittalsStorm Water Management/Erosion and Sedimentation Control Plan3.2.1G
4801 57 19.00 2206Test ReportsLaboratory Analysis3.13.4.2G
4901 57 19.00 2206Test ReportsDisposal Requirements3.15.2G
5001 57 19.00 2206Test ReportsErosion and Sediment Control Inspection Reports3.2.4G
5101 57 19.00 2206Test ReportsSolid Waste Management Report3.4.1G
5201 57 19.00 2211Closeout SubmittalsStorm Water Management and Erosion Control Compliance Notebook3.2.1G
5301 57 19.00 2211Closeout SubmittalsWaste Determination Documentation3.5G
5401 57 19.00 2211Closeout SubmittalsDisposal Documentation for Hazardous and Regulated Waste3.13.4.4G
5501 57 19.00 2211Closeout SubmittalsContractor 40 CFR Employee Training Records1.5.5G
5601 57 19.00 2211Closeout SubmittalsSolid Waste Management Report3.4.1G
5701 57 19.00 2211Closeout SubmittalsContractor Hazardous Material Inventory Log3.6G
5801 57 19.00 2211Closeout SubmittalsHazardous Waste/Debris Management3.13.4G
5901 57 19.00 2211Closeout SubmittalsRegulatory Notifications1.5.2G
6001 74 19.00 2201Preconstruction SubmittalsWaste Management Plan1.3G
6101 74 19.00 2211Closeout SubmittalsRecords1.4G
6201 78 00.00 2203Product DataAs-Built Record of Equipment and Materials1.3.2G
6301 78 00.00 2203Product DataWarranty Management Plan1.7.1G
6401 78 00.00 2203Product DataWarranty Tags1.7.4G
6501 78 00.00 2203Product DataFinal Cleaning0G
6601 78 00.00 2203Product DataSpare Parts Data1.4G
6701 78 00.00 2208Manufacturer’s InstructionsPreventative Maintenance1.5G
6801 78 00.00 2208Manufacturer’s InstructionsCondition Monitoring (Predictive Testing)1.5G
6901 78 00.00 2208Manufacturer’s InstructionsInspection1.5G
7001 78 00.00 2208Manufacturer’s InstructionsInstructions1.7.1G
7101 78 00.00 2210Operation and Maintenance DataOperation and Maintenance Manuals1.9G
7201 78 00.00 2211Closeout SubmittalsRecord Drawings1.3.1G
7301 78 00.00 2211Closeout SubmittalsCertification of EPA Designated Items1.6G
7401 78 00.00 2211Closeout SubmittalsCertification of EPA Designated Items1.6G
7501 78 00.00 2211Closeout SubmittalsRed Zone Documents1.3.6G
7601 78 2310Operation and Maintenance DataO&M Database0G
7701 78 2310Operation and Maintenance DataTraining Plan3.1.1G
7801 78 2310Operation and Maintenance DataTraining Outline3.1.3G
7901 78 2310Operation and Maintenance DataTraining Content3.1.2G
8035 20 231DredgingConstruction Operations PlanG
8135 20 231DredgingSeawater Intake Turbidity Protection PlanG
8235 20 231DredgingLobster Mitigation PlanG
8335 20 231DredgingMarine Mammal Monitoring PlanG
8435 20 231DredgingHydrographic Survey Methods0G
8535 20 231DredgingPre-Final DesignG
8635 20 231DredgingReady for Construciton DocumentsG
8735 20 231DredgingDredge Area Turbidity Protection PlanG
8835 20 231DredgingMethod for Computing QuantitiesG
8935 20 231DredgingEstimated Quantitiy CalculationsG
9035 20 232DredgingDewatering PlanG
9135 20 232DredgingSoundingsG
9235 20 231DredgingBID OPTIONS ONLY - Material Sampling and Testing PlanG
9335 20 2311DredgingBID OPTIONS ONLY - Material Test Results0G
9435 20 2311DredgingPost-dredge Hydrographic SurveyG
9535 20 2311DredgingQuantity CalculationsG
9635 20 2311DredgingApproved ManifestG
9701 78 2311Closeout SubmittalsTraining Video Recording3.1.4G
9801 78 2311Closeout SubmittalsValidation of Training Completion3.1.6G
9901 78 24.00 2211Closeout SubmittalseOMSI, Progress Submittal1.4.1G
10001 78 24.00 2211Closeout SubmittalseOMSI, Prefinal Submittal1.4.2G
10101 78 24.00 2211Closeout SubmittalseOMSI, Final Submittal1.4.3G

&RPage &P of &N

Sheet2

Sheet3