About this opportunity

The U.S. Army Corps of Engineers, Pittsburgh District is seeking sources to replace the existing Wastewater Treatment Facility (WWTF) at the Berlin Lake Mill Creek Recreation Area in Mahoning County, Ohio. The project involves installing a new prefabricated pump station and force main, a new prefabricated WWTF with various treatment components, renovating the existing WWTF control/laboratory building, upgrading the power supply, and demolishing the existing WWTF. The contractor will be required to comply with any Ohio EPA requirements, provide OEPA-licensed operator startup and training, and ensure a seamless switchover from the existing to the new WWTF. Interested sources must provide information on their company, point of contact, CAGE code, business size, and demonstrate specialized experience and past performance in similar contracts.

This requirement is not set-aside. The relevant NAICS code is 237110 (Water and Sewer Line and Related Structures Construction). The project is currently estimated to take place from May 2025 through October 2026, and the existing campground operations are expected to remain unchanged throughout the construction period. No potential incumbents or current contractors are named, and the contract value or budget range is not provided.

Notice text

Berlin Lake Mill Creek Recreation Area – Wastewater Treatment Facility Replacement Project

Berlin Lake, Mahoning County, Ohio

The U.S. Army Corps of Engineers (USACE), Pittsburgh District, is carrying out a Project to replace the existing Wastewater Treatment Facility (WWTF) at the location referenced above.  Work is to be performed entirely on Government property which consists of a public campground, two USACE field offices, and the existing WWTF.  The campground is open annually from mid-May to mid-September, while the two USACE field offices are open year-round.  The Government currently operates the existing 30,000 gallon per day (gpd) WWTF year-round and will need continuous access and utility services to do so during the Project.  The new prefabricated WWTP is to be constructed adjacent to the existing WWTP.  Final conversation to the new prefabricated WWTP is required prior to demolition of the existing WWTP.

Major features and coordination efforts of the Project generally include, but are not limited to, the following:

  1. Installing a new, prefabricated pump station and force main line.
  2. Installing a new, prefabricated WWTF with appurtenances.  The prefabricated WWTF (rated at 30,000 gpd) will utilize the extended aeration process and may have, among other features, a trash trap, flow equalization/aeration/clarifier/sludge holding/dosing tanks, fixed media and surface sand filtration, and UV disinfection.
  3. Renovating the existing WWTF control/laboratory building.
  4. Limited testing has been conducted and it is assumed that additional lead and asbestos testing/remediation may be required.
  5. Upgrading the existing power supply per local utility requirements and installation of a dedicated automatic emergency power generator.
  6. Installing gravel driveway for access and parking, lighting, and security fencing/gates.
  7. Reconfiguring portions of the existing sanitary sewer piping near the headworks and outfall manhole of the existing WWTF to accommodate the new hydraulic flow profile.
  8. Site grading, including erosion and sediment control, along with final restoration and landscaping at the WWTF.
  9. An Ohio Environmental Protection Agency (OPEA) Permit-to-Install (PTI) permit is being secured by the Government for the new WWTF and the contractor will have to comply with any OEPA requirements.
  10. Seamless switchover from the existing WWTF to the new prefabricated WWTF.
  11. Demolition and proper disposal of the existing WWTF and appurtenances.
  12. OEPA-licensed-operator startup and operation of the new WWTF for a limited duration, including training of the Government or other operators.

Physical construction and demolition for the Project is currently estimated to take place from May 2025 through October 2026 and campground operations throughout the year are assumed to remain unchanged.

Disposal of construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable.

INTERESTED SOURCES MUST PROVIDE THE FOLLOWING INFORMATION:
 
Interested and capable sources are requested to provide complete responses with the following information to Aaron M. Barr, Contract Specialist, no later than 5:00 PM ET on 26 April 2024 by email at Aaron.M.Barr@usace.army.mil.
 
    (1) Company/firm name and address
    (2) Company/firm point of contact, telephone number and email address
    (3) Company/firm cage code
    (4) Company/firm business size, to include designation as large business, small business, HUBZone, 8(a), Service Disabled      Veteran Owned Small Business, Small Disadvantaged Business or Women-Owned Business.
    (5) All interested contractors should submit a narrative demonstrating their specialized experience in similar type contracts and past performance. Capability statements should include, bonding capacity, bonding availability, details of similar projects and the completion dates, and contract amounts for the similar projects listed.
 
If you have any questions, please contact me.

Notice history

Notice Type Posted
Sewer Treatment Plant Replacement at Berlin Lake Latest solicitation Solicitation
Berlin Lake Sewer Treatment Plant Replacement Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Waste Water Treatment Plant Services Praia da Vitoria Azores 9760- Portugal · NAICS 221320 Air Forces Europe and Africa No set-aside
JBMHH Stormwater Management Facility Maintenance and Repair Services Fort Myer, Virginia 22211, United States · NAICS 562998 MICC Fort Sam Houston No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity